Contractor dossier
177 projects on file, including joint ventures this contractor is part of.
Total projects
177
Total budget
₱8.1B
Average progress
96.7%
Completion rate
89.3%
Average risk score
50.0
Medium risk on average, out of 100
Flagged as unusual
7
4.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 115 | ₱4.5B | 49.4 | 2 | 97.4% |
| National Capital Region | 44 | ₱1.5B | 47.6 | 0 | 100.0% |
| Region VI | 11 | ₱949.4M | 63.4 | 3 | 74.1% |
| Region VII | 4 | ₱757.2M | 60.1 | 1 | 97.8% |
| Region III | 3 | ₱307.7M | 47.4 | 1 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 78 | ₱3.7B | 51.3 | 3 | 98.1% |
| Roads | 61 | ₱2.7B | 47.6 | 0 | 96.8% |
| Buildings and Facilities | 19 | ₱686.8M | 45.3 | 1 | 95.7% |
| OTHER | 7 | ₱463.3M | 68.2 | 2 | 90.3% |
| Bridges | 7 | ₱259.9M | 50.6 | 1 | 85.7% |
| Water Provision and Storage | 3 | ₱157.7M | 46.7 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱141.6M | 60.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱145.5M | 81% | High risk83 | Flagged0.025 |
| 24C00233CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | Region III | On-Going | ₱241.2M | 98% | High risk80 | Flagged0.003 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 24GD0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AMBILAY RIVER CONTROL, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱67.7M | 58% | High risk75 | Flagged0.006 |
| 24GD0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AGBALO RIVER CONTROL, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱72.4M | 71% | High risk75 | Flagged0.003 |
| 24GD0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER CONTROL (DOWNSTREAM), PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱68.9M | 80% | High risk75 | —-0.002 |
| 17A00043CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ALONG POBLACION-SABANGAN ROAD LEADING TO UMBRELLA ROCKS AND ABAGATANEN WHITE BEACH, INCLUDING BRIDGE, AGNO, PANGASINAN | Region I | Region I | Completed | ₱92.6M | 100% | High risk74 | —-0.018 |
| 17AH0173CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGYS. BOLO & DULIG, LABRADOR, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱27.5M | 100% | High risk70 | —-0.023 |
| 17AG0062IMPROVEMENT/WIDENING OF NATIONAL ROADS SECONDARY ROADS INCLUDING DRAINAGE ALAMINOS-LUCAP RD-(KO323+4 | Region I | Pangasinan 1st DEO | Completed | ₱32.5M | 100% | High risk70 | —-0.025 |
| 17AG0061OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-SECONDARY ROADS PANGASINAN-ZAMBALES RD -(KO268+000-KO | Region I | Pangasinan 1st DEO | Completed | ₱40.7M | 100% | High risk69 | —-0.025 |
| 17A00011ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) MANGALDAN-MANAOAG-BINALONAN ROAD,K0191+027-K0194+000; K0194+000-K0195+000; K0195+000-K0196+000; K0196+000-K0196+332; K0196+372-K01 | Region I | Region I | Completed | ₱101.6M | 100% | High risk68 | —-0.042 |
| 24G00007CONSTRUCTION OF RIVER CONTROL AT BARANGAY POBLACION ILAYA TO POBLACION ILAWOD, MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱146.7M | 74% | High risk68 | —-0.005 |
| 18OD0181CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱210.6M | 100% | High risk67 | —-0.051 |
| 17A00014CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO ANGEL CAVE AND ALICUPEN BEACH, BANI, PANGASINAN 1ST LD | Region I | Region I | Completed | ₱96.5M | 100% | High risk67 | —-0.037 |
| 17AJ0037CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG MARUSAY RIVER AT BRGY. TALIBAEW AND BRGY. BUENLAG, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱40.2M | 100% | High risk65 | —-0.045 |
| 17AJ0057CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG MARUSAY RIVER AT BRGY. GABON, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱29.5M | 100% | High risk65 | —-0.045 |
| 17AJ0065CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, GUELEW SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱28.9M | 100% | High risk65 | —-0.046 |
| 17AJ0026CONSTRUCTION OF PROTECTION WORKS ALONG SINUCALAN RIVER, DALONGUE SECTION, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱27.4M | 100% | High risk65 | —-0.045 |
| 17AJ0017CONSTRUCTION OF PROTECTION WORKS ALONG MARUSAY RIVER, BRGY. NALSIAN, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱24.6M | 100% | High risk65 | —-0.046 |
| 17AJ0025CONSTRUCTION OF PROTECTION WORKS ALONG MARUSAY RIVER, POBLACION, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱23M | 100% | High risk65 | —-0.046 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21H00075AVIATION INFRASTRUCTURE PROGRAM, LOCALLY-FUNDED PROJECTS, CONSTRUCTION/REHABILITATION AND IMPROVEMENT OF OTHER TRANSPORTATION INFRASTRUCTURE-AVIATION, SIQUIJOR AIRPORT, SIQUIJOR | Region VII | Region VII | On-Going | ₱435M | 91% | High risk62 | Flagged0.052 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 24G00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱145.5M | 81% | High risk83 | Flagged0.025 |
| 24A00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY PANGAPISAN NORTH AND BARANGAY CAPANDANAN, LINGAYEN, PANGASINAN | Region I | Region I | On-Going | ₱93.6M | 0% | High risk62 | Flagged0.017 |
| 24GD0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AMBILAY RIVER CONTROL, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱67.7M | 58% | High risk75 | Flagged0.006 |
| 24GD0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AGBALO RIVER CONTROL, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱72.4M | 71% | High risk75 | Flagged0.003 |
| 24C00233CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | Region III | On-Going | ₱241.2M | 98% | High risk80 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18A00046CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL IN CATO, INFANTA, PANGASINAN | Region I | Region I | Completed | ₱74.1M | 100% | Medium risk51 | —-0.054 |
| 52 | 23GD0009REHABILITATION OF CONCRETE ROAD - REHABILITATION OF CABUG-CABUG-BAYUYAN-YATING-TABUN-ACAN ROAD IN PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱47M | 100% | Medium risk50 | —-0.038 |
| 53 | 25AG0105BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, DON RAYMUNDO CELESTE SPORTS COMPLEX, PHASE 4, BARANGAY GERMINAL, BOLINAO, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱29.1M | 28% | Medium risk50 | —-0.019 |
| 54 | 24AG0147BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DON RAYMUNDO CELESTE), PHASE III, BARANGAY GERMINAL, BOLINAO, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱29.1M | 100% | Medium risk50 | —-0.041 |
| 55 | 18AH0140CONSTRUCTION OF WATER SUPPLY PROJECT, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱79.7M | 100% | Medium risk50 | —-0.027 |
| 56 | 22AG0013FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ALAMINOS RIVER (PALAMIS SECTION) STA.015+259 - STA.015+979, BRGY. PALAMIS, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱66.6M | 100% | Medium risk49 | —-0.060 |
| 57 | 18A00037OFF CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ALAMINOS-BOLINAO RD - K0326+000 - K0327+080, K0328+796 - K0329+296, K0329+349 - K0329+953, K0330+000-K0332+183, K0332+226 - K0333+909 | Region I | Region I | Completed | ₱71.9M | 100% | Medium risk49 | —-0.074 |
| 58 | 20OD0038CONSTRUCTION OF BOX CULVERT DRAINAGE ALONG 10TH AVE. (RIZAL AVE. TO B. SERRANO), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.2M | 100% | Medium risk49 | —-0.087 |
| 59 | 24A00037CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BOLINAO - DASOL COASTAL ROAD, PANGASINAN | Region I | Region I | On-Going | ₱67.5M | 92% | Medium risk49 | —-0.034 |
| 60 | 21AG0001ASSET PRESERVATION/REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS/ SLOPE COLLAPSE, AND LANDSLIDE -SECONDARY ROADS- ALAMINOS-BOLINAO RD K0340+824 - K0342+600 AT BRGY. TIEP, BANI, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱67.6M | 100% | Medium risk49 | —-0.076 |
| 61 | 19AJ0062CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, BRGY. GUELEW, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱47.4M | 100% | Medium risk49 | —-0.061 |
| 62 | 20AJ0043CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, BRGY. GUELEW, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱47.1M | 100% | Medium risk49 | —-0.070 |
| 63 | 18A00005CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD LEADING TO ANGEL CAVE AND ALICUPEN BEACH, BANI, PANGASINAN | Region I | Region I | Completed | ₱73.3M | 100% | Medium risk49 | —-0.072 |
| 64 | 18A00036CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. COLAYO ROAD CONNECTING ALAMINOS ROAD IN SUPPORT OF CASSAVA, PEANUT, AND CORN PRODUCTION AND PROCESSING, BANI, PANGASINAN | Region I | Region I | Completed | ₱71.4M | 100% | Medium risk49 | —-0.073 |
| 65 | 19OE0207LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOODCONTROL STRUCTURES / FACILITIES- BANK IMPROVEMENT ALONG ESTERO DE VITAS, STA.0+380.25 TO STA.0+422, STA.0+907.20 TO STA.0+995.50, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.088 |
| 66 | 19A00114CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION OF ROAD - ACCESS ROAD LEADING TO MAPITA TRIBAL COMMUNITY AND VIEW DECK TO NAYONG AGUILAR (YLANG-YLANG PLANTATION AND AGRI-TOURISM | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk49 | —-0.082 |
| 67 | 17OD0081CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 178 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱22.5M | 100% | Medium risk49 | —-0.062 |
| 68 | 21AJ0033CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG SINUCALAN RIVER, BRGY. PRIMICIAS, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱47.1M | 100% | Medium risk49 | —-0.072 |
| 69 | 19AJ0043CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG AGNO RIVER AT BRGY. MANAMBONG SUR, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱47.4M | 100% | Medium risk49 | —-0.072 |
| 70 | 19AJ0042CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG AGNO RIVER AT BRGY. ITON, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱47.4M | 100% | Medium risk49 | —-0.072 |
| 71 | 20A00125CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER BANK PROTECTION BRGY. PAITAN EAST - BRGY. BOLAOEN, ALONG SIOASIO RIVER, SUAL, PANGASINAN | Region I | Region I | Completed | ₱54.9M | 100% | Medium risk49 | —-0.063 |
| 72 | 19A00113CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, BOBONOT-TAMBOBONG ROAD LEADING TO TAMBOBONG BEACH, PACKAGE 1, DASOL, PANGASINAN | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk48 | —-0.078 |
| 73 | 16OE0123MFO-2 FLOOD MANAGEMENT SERVICES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAIANGE SYSTEMS-CONSTRUCTION OF RIVERWALL AT NORTH ESTERO DE MAYPAJO, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱37.6M | 100% | Medium risk48 | —-0.052 |
| 74 | 22OC0085CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I) AT SAV 2, BARANGAY SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱6.9M | 100% | Medium risk48 | —-0.100 |
| 75 | 23AH0024WIDENING OF PERMANENT BRIDGES AT CURAMBENG BR. (B02147LZ) ALONG PANGASINAN-ZAMBALES RD, BINMALEY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱32.1M | 100% | Medium risk48 | —-0.012 |