Contractor dossier
177 projects on file, including joint ventures this contractor is part of.
Total projects
177
Total budget
₱8.1B
Average progress
96.7%
Completion rate
89.3%
Average risk score
50.0
Medium risk on average, out of 100
Flagged as unusual
7
4.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 115 | ₱4.5B | 49.4 | 2 | 97.4% |
| National Capital Region | 44 | ₱1.5B | 47.6 | 0 | 100.0% |
| Region VI | 11 | ₱949.4M | 63.4 | 3 | 74.1% |
| Region VII | 4 | ₱757.2M | 60.1 | 1 | 97.8% |
| Region III | 3 | ₱307.7M | 47.4 | 1 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 78 | ₱3.7B | 51.3 | 3 | 98.1% |
| Roads | 61 | ₱2.7B | 47.6 | 0 | 96.8% |
| Buildings and Facilities | 19 | ₱686.8M | 45.3 | 1 | 95.7% |
| OTHER | 7 | ₱463.3M | 68.2 | 2 | 90.3% |
| Bridges | 7 | ₱259.9M | 50.6 | 1 | 85.7% |
| Water Provision and Storage | 3 | ₱157.7M | 46.7 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱141.6M | 60.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱145.5M | 81% | High risk83 | Flagged0.025 |
| 24C00233CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | Region III | On-Going | ₱241.2M | 98% | High risk80 | Flagged0.003 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 24GD0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AMBILAY RIVER CONTROL, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱67.7M | 58% | High risk75 | Flagged0.006 |
| 24GD0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AGBALO RIVER CONTROL, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱72.4M | 71% | High risk75 | Flagged0.003 |
| 24GD0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER CONTROL (DOWNSTREAM), PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱68.9M | 80% | High risk75 | —-0.002 |
| 17A00043CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ALONG POBLACION-SABANGAN ROAD LEADING TO UMBRELLA ROCKS AND ABAGATANEN WHITE BEACH, INCLUDING BRIDGE, AGNO, PANGASINAN | Region I | Region I | Completed | ₱92.6M | 100% | High risk74 | —-0.018 |
| 17AH0173CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGYS. BOLO & DULIG, LABRADOR, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱27.5M | 100% | High risk70 | —-0.023 |
| 17AG0062IMPROVEMENT/WIDENING OF NATIONAL ROADS SECONDARY ROADS INCLUDING DRAINAGE ALAMINOS-LUCAP RD-(KO323+4 | Region I | Pangasinan 1st DEO | Completed | ₱32.5M | 100% | High risk70 | —-0.025 |
| 17AG0061OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-SECONDARY ROADS PANGASINAN-ZAMBALES RD -(KO268+000-KO | Region I | Pangasinan 1st DEO | Completed | ₱40.7M | 100% | High risk69 | —-0.025 |
| 17A00011ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) MANGALDAN-MANAOAG-BINALONAN ROAD,K0191+027-K0194+000; K0194+000-K0195+000; K0195+000-K0196+000; K0196+000-K0196+332; K0196+372-K01 | Region I | Region I | Completed | ₱101.6M | 100% | High risk68 | —-0.042 |
| 24G00007CONSTRUCTION OF RIVER CONTROL AT BARANGAY POBLACION ILAYA TO POBLACION ILAWOD, MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱146.7M | 74% | High risk68 | —-0.005 |
| 18OD0181CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱210.6M | 100% | High risk67 | —-0.051 |
| 17A00014CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO ANGEL CAVE AND ALICUPEN BEACH, BANI, PANGASINAN 1ST LD | Region I | Region I | Completed | ₱96.5M | 100% | High risk67 | —-0.037 |
| 17AJ0037CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG MARUSAY RIVER AT BRGY. TALIBAEW AND BRGY. BUENLAG, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱40.2M | 100% | High risk65 | —-0.045 |
| 17AJ0057CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG MARUSAY RIVER AT BRGY. GABON, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱29.5M | 100% | High risk65 | —-0.045 |
| 17AJ0065CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, GUELEW SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱28.9M | 100% | High risk65 | —-0.046 |
| 17AJ0026CONSTRUCTION OF PROTECTION WORKS ALONG SINUCALAN RIVER, DALONGUE SECTION, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱27.4M | 100% | High risk65 | —-0.045 |
| 17AJ0017CONSTRUCTION OF PROTECTION WORKS ALONG MARUSAY RIVER, BRGY. NALSIAN, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱24.6M | 100% | High risk65 | —-0.046 |
| 17AJ0025CONSTRUCTION OF PROTECTION WORKS ALONG MARUSAY RIVER, POBLACION, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱23M | 100% | High risk65 | —-0.046 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21H00075AVIATION INFRASTRUCTURE PROGRAM, LOCALLY-FUNDED PROJECTS, CONSTRUCTION/REHABILITATION AND IMPROVEMENT OF OTHER TRANSPORTATION INFRASTRUCTURE-AVIATION, SIQUIJOR AIRPORT, SIQUIJOR | Region VII | Region VII | On-Going | ₱435M | 91% | High risk62 | Flagged0.052 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 24G00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN MAAYON, CAPIZ | Region VI | Region VI | On-Going | ₱145.5M | 81% | High risk83 | Flagged0.025 |
| 24A00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY PANGAPISAN NORTH AND BARANGAY CAPANDANAN, LINGAYEN, PANGASINAN | Region I | Region I | On-Going | ₱93.6M | 0% | High risk62 | Flagged0.017 |
| 24GD0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AMBILAY RIVER CONTROL, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱67.7M | 58% | High risk75 | Flagged0.006 |
| 24GD0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, AGBALO RIVER CONTROL, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱72.4M | 71% | High risk75 | Flagged0.003 |
| 24C00233CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | Region III | On-Going | ₱241.2M | 98% | High risk80 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20OD0059REHABILITATION OF DRAINAGE AND PATHWAY, BARANGAY 23 & 24, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.099 |
| 102 | 19OD0254REHABILITATION OF CREEK RIPRAP AND DRAINAGE SYSTEM ALONG BRGY. 171, 175, 176 AND 174, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱45.7M | 100% | Medium risk46 | —-0.085 |
| 103 | 18OD0026REHABILITATION OF FLOOD CONTROL WALL ALONG ORBE CREEK, BRGY. BAGBAGUIN, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱44.6M | 100% | Medium risk46 | —-0.083 |
| 104 | 18OD0194CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS WITH DREDGING IN BRGY. 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱43.1M | 100% | Medium risk46 | —-0.087 |
| 105 | 18OE0048ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE NORTH MAYPAJO BRGY. 135 STA. 0+1 | National Capital Region | North Manila DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.088 |
| 106 | 18OE0053ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE SUNOG APOG STA. 0+400.40 TO STA.5 | National Capital Region | North Manila DEO | Completed | ₱46.4M | 100% | Medium risk46 | —-0.088 |
| 107 | 19AG0081CONSTRUCTION OF SEAWALL AT BRGY. POBLACION AND CATO INFANTA, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.063 |
| 108 | 18OE0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MIGITTION STRUCTURES AND DRAINAGE SYSTEMS BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE SUNOG APOG, STA. 0+958.0 TO STA. | National Capital Region | North Manila DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.089 |
| 109 | 18OD0081CONSTRUCTION OF FLOODCONTROL WALL/RIPRAPPING ALONG BANKS OF CREEKS, BRGY. 172, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱22.5M | 100% | Medium risk46 | —-0.087 |
| 110 | 18AH0180ASSET PRESERVATION-CONST'N./UPGRADING/REHAB.OF DRAINAGE ALONG PANG.-ZAM.RD.KO361+425-KO362+407-KO362 | Region I | Pangasinan 2nd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.084 |
| 111 | 19AI0039FLARING/IMPROVEMENT OF INTERSECTIONS ALONG MANILA NORTH ROAD - KO 181+730, KO 184+630 | Region I | Pangasinan 3rd DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.090 |
| 112 | 18OD0047CONSTRUCTION / REHABILITATION OF RIVERWALL ALONG TULLAHAN RIVER, STA. 8+157 - STA. 8+217 & STA. 8+255 - STA. 8+274, BRGY. MARULAS, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.087 |
| 113 | 21AI0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALORAGAT RIVER, BRGY. INMANDUYAN, LAOAC, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.066 |
| 114 | 19OD0263DECLOGGING AND DESILTING OF DAGAT-DAGATAN PERIPHERAL CANAL ALONG BRGYS. 8, 12, 16, 18 AND 22, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.090 |
| 115 | 20OD0123CONSTRUCTION OF ROADS AND DRAINAGE ALONG ASISTIO ST., BRGY. 94, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱6.5M | 100% | Medium risk46 | —-0.100 |
| 116 | 20OD0107IMPROVEMENT OF ALLEYS AND DRAINAGE ALONG BRGY. 19, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.100 |
| 117 | 22OC0071REHABILITATION OF ROAD AND DRAINAGE IMPROVEMENT OF SAN PEDRO ST. & ITS VICINITY, VALLEY 2, BRGY. SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱13.7M | 100% | Medium risk46 | —-0.088 |
| 118 | 22OC0070REHABILITATION OF ROAD AND DRAINAGE IMPROVEMENT OF SAN PEDRO ST., VALLEY 2, BRGY. SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.097 |
| 119 | 19OA0006CONSTRUCTION OF RIVERWALL ALONG SOUTH PINAGKABALIAN RIVER (PHASE VI), BRGY. PANGHULO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.3M | 100% | Medium risk45 | —-0.086 |
| 120 | 18OA0014CONST./SEALING/IMPV'T. OF RIVERWALL ALONG SOUTH PINAGKABALIAN RIVER, STA.0+292 TO STA.0+584 (P-II), | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.3M | 100% | Medium risk45 | —-0.087 |
| 121 | 18OA0051RAISING/IMPVT OF DRAINAGE SYSTEM WITHIN TANZA SOCIALIZED HOUSING, BRGY. TANZA, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱23.4M | 100% | Medium risk45 | —-0.087 |
| 122 | 23AJ0126CONSTRUCTION OF SOLAR WATER SYSTEM, A. CALASIAO, PANGASINAN; B. SAN CARLOS CITY, PANGASINAN; C. MALASIQUI, PANGASINAN; D. BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱38.8M | 100% | Medium risk45 | —-0.042 |
| 123 | 19A00053CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - LINGAYEN BAYWALK TO BINMALEY, PANGASINAN | Region I | Region I | Completed | ₱39.3M | 100% | Medium risk45 | —-0.087 |
| 124 | 18AH0019CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. BOLAOEN,BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.071 |
| 125 | 18AH0105CONSTRUCTION OF RIVERBANK PROJECT,AGNO RIVER BASIN FLOOD CONTROL PROJ.NINOY AGUILAR,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱24.1M | 100% | Medium risk45 | —-0.071 |