Contractor dossier
377 projects on file, including joint ventures this contractor is part of.
Total projects
377
Total budget
₱17.4B
Average progress
92.6%
Completion rate
83.6%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
12
3.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 326 | ₱13.7B | 48.2 | 5 | 94.9% |
| Region IV-B | 50 | ₱3.6B | 52.6 | 7 | 77.4% |
| National Capital Region | 1 | ₱83.5M | 52.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 205 | ₱9.4B | 46.3 | 4 | 92.5% |
| Buildings and Facilities | 59 | ₱1.9B | 44.9 | 0 | 96.6% |
| Flood Control and Drainage | 39 | ₱1.9B | 50.6 | 1 | 91.6% |
| Bridges | 26 | ₱1.3B | 51.8 | 0 | 91.2% |
| OTHER | 21 | ₱1.3B | 71.8 | 3 | 93.6% |
| Water Provision and Storage | 13 | ₱84.6M | 32.0 | 0 | 98.7% |
| Bridges, Roads | 10 | ₱1.1B | 63.0 | 0 | 92.1% |
| GAA 2025 SSP | 4 | ₱249.4M | 94.8 | 4 | 36.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF IBAAN - LIPA ROAD INCLUDING | Region IV-A | Batangas 4th DEO | On-Going | ₱72.4M | 90% | High risk95 | Flagged0.003 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25EE0074CONSTRUCTION OF TARANDUNGAN BRIDGE ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.4M | 16% | High risk94 | Flagged0.047 |
| 25DE0181CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING (AMPITHEATER) BRGY. TINGA, LABAC, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.8M | 18% | High risk94 | Flagged0.019 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 24EE0137PACKAGE-CONSTRUCTION/CONCRETING OF ROADS:1. CONCRETING OF ROAD-ABONGAN ALACALIAN LEADING TO BINGA LONG BEACH2. CONSTRUCTION OF ABONGAN-ALACALIAN ROAD, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱132.7M | 100% | High risk78 | —-0.001 |
| 24EE0130PACKAGE V-CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM PROJECTS:1. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, CASIAN, TAYTAY2. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, LIMINANGCONG, TAYTAY3. CONSTR | Region IV-B | Palawan 1st DEO | On-Going | ₱32.6M | 84% | High risk75 | Flagged0.015 |
| 18DL0257A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT B. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 4. PAGBILAO BYPASS, INCL. ROW AND BRIDGE, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱81.5M | 100% | High risk75 | —-0.035 |
| 23DD0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk74 | —-0.032 |
| 20DD0059ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS, SN JUAN-LAIYA RD - K0160+530 - K0161+340, K0164+635 - K0165+530 | Region IV-A | Batangas 4th DEO | Completed | ₱70M | 100% | High risk73 | —-0.038 |
| 20DD0037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS, SN JUAN- LAIYA RD - K0158 +636 - K0160+530 | Region IV-A | Batangas 4th DEO | Completed | ₱79.1M | 100% | High risk73 | —-0.036 |
| 17DD0021OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, TERTIARY ROADS, SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱90.7M | 100% | High risk72 | —-0.032 |
| 22DD0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, SN JUAN-LAIYA RD - K0154 + 394 - K0155 + 846 | Region IV-A | Batangas 4th DEO | Completed | ₱77.2M | 100% | High risk72 | —-0.038 |
| 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 18DD0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, BATANGAS - LOBO RD - K0121+169 - K0123+042, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱69.7M | 100% | High risk70 | —-0.039 |
| 18DD0252ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, OFF- CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, LIPA- BALETE RD (K0079 + 725.00 TO K0080 + 583.00; K0080 + 796.00 TO K0081 + 930.00) | Region IV-A | Batangas 4th DEO | Completed | ₱66.9M | 100% | High risk70 | —-0.039 |
| 17D00019PALICO-BALAYAN-BATANGAS RD K0141+(-735.00)-K0142+142.00 | Region IV-A | Region IV-A | Completed | ₱97.2M | 100% | High risk70 | —-0.029 |
| 21DD0293LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF DRAIANGE SYSTEM AT POBLACION, BARANGAY SAMPAGUITA, BOLBOK, MABINI, SABANG, SAN ISIDRO, TANGOB, LIPA CITY, BAT | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | High risk70 | —-0.043 |
| 22DD0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BATANGAS-LOBO RD - K0125 + 783 - K0127 + 190 | Region IV-A | Batangas 4th DEO | Completed | ₱57.9M | 100% | High risk70 | —-0.040 |
| 24D00038CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PADRE GARCIA - ROSARIO DIVERSION ROAD, PACKAGE 1, BATANGAS | Region IV-A | Region IV-A | Completed | ₱34.7M | 100% | High risk70 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EE0137CONSTRUCTION OF BUSUANG TO CARAMAY FMR, CARAMAY, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | Medium risk59 | Flagged0.074 |
| 23EE0138CONSTRUCTION OF SITIO NALBOT TO ARADO FMR, POBLACION, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | High risk60 | Flagged0.071 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 23EE0139CONSTRUCTION OF SAN NICOLAS TO SITIO CANIOGAN FMR, CORON, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | Medium risk58 | Flagged0.064 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25EE0074CONSTRUCTION OF TARANDUNGAN BRIDGE ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.4M | 16% | High risk94 | Flagged0.047 |
| 23D00048CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSTAR TOLLWAY - PINAMUCAN BYPASS PACKAGE M, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱79.9M | 0% | High risk69 | Flagged0.033 |
| 24DE0243CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION FACILITIES STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TABANGA | Region IV-A | Batangas 2nd DEO | On-Going | ₱48.3M | 0% | Medium risk58 | Flagged0.031 |
| 24DD0282ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG NA PULO - STAR TOLLWAY INTERCHANGE, PACKAGE H, BUGTONG NA PULO, L | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 0% | Medium risk58 | Flagged0.022 |
| 25DE0181CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING (AMPITHEATER) BRGY. TINGA, LABAC, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.8M | 18% | High risk94 | Flagged0.019 |
| 24EE0130PACKAGE V-CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM PROJECTS:1. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, CASIAN, TAYTAY2. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, LIMINANGCONG, TAYTAY3. CONSTR | Region IV-B | Palawan 1st DEO | On-Going | ₱32.6M | 84% | High risk75 | Flagged0.015 |
| 25DD0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF IBAAN - LIPA ROAD INCLUDING | Region IV-A | Batangas 4th DEO | On-Going | ₱72.4M | 90% | High risk95 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24DD0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION ALONG BALANGA-CATANDALA BRIDGE, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱96M | 94% | High risk65 | —-0.038 |
| 52 | 23D00147CONSTRUCTION OF MULTI - PURPOSE BUILDING, IBAAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱195M | 49% | High risk65 | —-0.005 |
| 53 | 16DE0167MFO-1 NATIONAL ROAD NETWORK SERVICES NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROAD, PRIMARY ROAD, MANILA-BATANGAS ROAD K0104+463 - KO105+744 | Region IV-A | Batangas 2nd DEO | Completed | ₱42.9M | 100% | High risk64 | —-0.073 |
| 54 | 16DE0180MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADSREHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAYDEVELOPMENT AND MANAGEMENT -4 (HDM-4), SEC | Region IV-A | Batangas 2nd DEO | Completed | ₱7.1M | 100% | High risk64 | —-0.070 |
| 55 | 25DE0082ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (OUTFALL), BARANGAY SANTA CLARA-C | Region IV-A | Batangas 2nd DEO | On-Going | ₱107.1M | 31% | High risk64 | —-0.021 |
| 56 | 24DD0057ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIV | Region IV-A | Batangas 4th DEO | Completed | ₱106.2M | 100% | High risk64 | —-0.074 |
| 57 | 25D00153CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STAR TOLLWAY-PINAMUCAN BYPASS, PACKAGE Q, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱93.6M | 24% | High risk64 | —-0.009 |
| 58 | 18D00009FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM NETWORK DEV'T. CONST. OF BY-PASS & DIVERSION ROADS STAR TOLLWAY-PINAMUCAN BY-PASS ROAD, PACKAGE A, INCL. ROW, BATANGAS | Region IV-A | Region IV-A | Completed | ₱138.1M | 100% | High risk64 | —-0.072 |
| 59 | 18D00005ROAD WIDENING / PRIMARY ROADS MANILA BATANGAS RD | Region IV-A | Region IV-A | Completed | ₱137.7M | 100% | High risk64 | —-0.084 |
| 60 | 24DD0123ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG CALUMPANG RIVER, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 61 | 23DD0311CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION ALONG BALANGA ROAD GOING TO CATAND | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk63 | —-0.096 |
| 62 | 24DD0257CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES NEW LIPA CITY HALL AT BARANGAY BULACNIN, LIPA CITY BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱96M | 59% | High risk63 | —-0.035 |
| 63 | 22DD0304CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIPA CITY HALL) INCLUDING FACILITIES (PACKAGE B), LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk63 | —-0.087 |
| 64 | 22DD0302CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIPA CITY HALL) INCLUDING FACILITIES (PACKAGE A), LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk63 | —-0.087 |
| 65 | 23DD0263CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), BRGY. STO. NIÑO, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk63 | —-0.086 |
| 66 | 22DD0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STO. NIÑO, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk63 | —-0.086 |
| 67 | 25E00104ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, CORON-BUSUANGA ROAD, K0057+700-K0057+823, BUSUANGA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.1M | 7% | High risk62 | —-0.007 |
| 68 | 24E00056NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- PUERTO PRINCESA NORTH ROAD, K0140+478-K0197+919 (INTERMITTENT SECTIONS), PALAWAN | Region IV-B | Region IV-B | On-Going | ₱316M | 85% | High risk61 | —-0.000 |
| 69 | 20DD0082ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MANILA- BATANGAS BYPASS ROAD, PACKAGE C, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.096 |
| 70 | 21DD0279LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, INSTALLATION OF STREETLIGHTS ALONG BARANGAY STO. NIÑO-SAN BENITO ROAD, BANAY-BANAY-HALANG ROAD, SABANG-TIPACAN ROAD, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk61 | —-0.097 |
| 71 | 18D00033FY 2018 DPWH INFRA. PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING/SECONDARY ROADS BATANGAS-LOBO ROAD, BATANGAS PROVINCE | Region IV-A | Region IV-A | Completed | ₱123.7M | 100% | High risk61 | —-0.088 |
| 72 | 20D00059FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PADRE GARCIA-IBAAN DIVERSION ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱123.7M | 100% | High risk61 | —-0.088 |
| 73 | 25DE0132CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF STREETLIGHTS ALONG BATANGAS PORT DIVERSION ROAD, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 1% | High risk61 | —-0.037 |
| 74 | 24D00034CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE P, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱95.1M | 80% | High risk61 | —-0.054 |
| 75 | 22D00013FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSPADRE GARCIA-IBAAN DIVERSION ROAD, PHASE III, BATANGAS | Region IV-A | Region IV-A | Completed | ₱94.7M | 100% | High risk61 | —-0.087 |