Contractor dossier
377 projects on file, including joint ventures this contractor is part of.
Total projects
377
Total budget
₱17.4B
Average progress
92.6%
Completion rate
83.6%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
12
3.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 326 | ₱13.7B | 48.2 | 5 | 94.9% |
| Region IV-B | 50 | ₱3.6B | 52.6 | 7 | 77.4% |
| National Capital Region | 1 | ₱83.5M | 52.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 205 | ₱9.4B | 46.3 | 4 | 92.5% |
| Buildings and Facilities | 59 | ₱1.9B | 44.9 | 0 | 96.6% |
| Flood Control and Drainage | 39 | ₱1.9B | 50.6 | 1 | 91.6% |
| Bridges | 26 | ₱1.3B | 51.8 | 0 | 91.2% |
| OTHER | 21 | ₱1.3B | 71.8 | 3 | 93.6% |
| Water Provision and Storage | 13 | ₱84.6M | 32.0 | 0 | 98.7% |
| Bridges, Roads | 10 | ₱1.1B | 63.0 | 0 | 92.1% |
| GAA 2025 SSP | 4 | ₱249.4M | 94.8 | 4 | 36.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF IBAAN - LIPA ROAD INCLUDING | Region IV-A | Batangas 4th DEO | On-Going | ₱72.4M | 90% | High risk95 | Flagged0.003 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25EE0074CONSTRUCTION OF TARANDUNGAN BRIDGE ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.4M | 16% | High risk94 | Flagged0.047 |
| 25DE0181CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING (AMPITHEATER) BRGY. TINGA, LABAC, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.8M | 18% | High risk94 | Flagged0.019 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 24EE0137PACKAGE-CONSTRUCTION/CONCRETING OF ROADS:1. CONCRETING OF ROAD-ABONGAN ALACALIAN LEADING TO BINGA LONG BEACH2. CONSTRUCTION OF ABONGAN-ALACALIAN ROAD, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱132.7M | 100% | High risk78 | —-0.001 |
| 24EE0130PACKAGE V-CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM PROJECTS:1. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, CASIAN, TAYTAY2. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, LIMINANGCONG, TAYTAY3. CONSTR | Region IV-B | Palawan 1st DEO | On-Going | ₱32.6M | 84% | High risk75 | Flagged0.015 |
| 18DL0257A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT B. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 4. PAGBILAO BYPASS, INCL. ROW AND BRIDGE, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱81.5M | 100% | High risk75 | —-0.035 |
| 23DD0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk74 | —-0.032 |
| 20DD0059ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS, SN JUAN-LAIYA RD - K0160+530 - K0161+340, K0164+635 - K0165+530 | Region IV-A | Batangas 4th DEO | Completed | ₱70M | 100% | High risk73 | —-0.038 |
| 20DD0037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS, SN JUAN- LAIYA RD - K0158 +636 - K0160+530 | Region IV-A | Batangas 4th DEO | Completed | ₱79.1M | 100% | High risk73 | —-0.036 |
| 17DD0021OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, TERTIARY ROADS, SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱90.7M | 100% | High risk72 | —-0.032 |
| 22DD0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, SN JUAN-LAIYA RD - K0154 + 394 - K0155 + 846 | Region IV-A | Batangas 4th DEO | Completed | ₱77.2M | 100% | High risk72 | —-0.038 |
| 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 18DD0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, BATANGAS - LOBO RD - K0121+169 - K0123+042, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱69.7M | 100% | High risk70 | —-0.039 |
| 18DD0252ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, OFF- CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, LIPA- BALETE RD (K0079 + 725.00 TO K0080 + 583.00; K0080 + 796.00 TO K0081 + 930.00) | Region IV-A | Batangas 4th DEO | Completed | ₱66.9M | 100% | High risk70 | —-0.039 |
| 17D00019PALICO-BALAYAN-BATANGAS RD K0141+(-735.00)-K0142+142.00 | Region IV-A | Region IV-A | Completed | ₱97.2M | 100% | High risk70 | —-0.029 |
| 21DD0293LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF DRAIANGE SYSTEM AT POBLACION, BARANGAY SAMPAGUITA, BOLBOK, MABINI, SABANG, SAN ISIDRO, TANGOB, LIPA CITY, BAT | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | High risk70 | —-0.043 |
| 22DD0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BATANGAS-LOBO RD - K0125 + 783 - K0127 + 190 | Region IV-A | Batangas 4th DEO | Completed | ₱57.9M | 100% | High risk70 | —-0.040 |
| 24D00038CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PADRE GARCIA - ROSARIO DIVERSION ROAD, PACKAGE 1, BATANGAS | Region IV-A | Region IV-A | Completed | ₱34.7M | 100% | High risk70 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EE0137CONSTRUCTION OF BUSUANG TO CARAMAY FMR, CARAMAY, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | Medium risk59 | Flagged0.074 |
| 23EE0138CONSTRUCTION OF SITIO NALBOT TO ARADO FMR, POBLACION, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | High risk60 | Flagged0.071 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 23EE0139CONSTRUCTION OF SAN NICOLAS TO SITIO CANIOGAN FMR, CORON, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱14.9M | 0% | Medium risk58 | Flagged0.064 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25EE0074CONSTRUCTION OF TARANDUNGAN BRIDGE ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱49.4M | 16% | High risk94 | Flagged0.047 |
| 23D00048CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSTAR TOLLWAY - PINAMUCAN BYPASS PACKAGE M, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱79.9M | 0% | High risk69 | Flagged0.033 |
| 24DE0243CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION FACILITIES STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TABANGA | Region IV-A | Batangas 2nd DEO | On-Going | ₱48.3M | 0% | Medium risk58 | Flagged0.031 |
| 24DD0282ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG NA PULO - STAR TOLLWAY INTERCHANGE, PACKAGE H, BUGTONG NA PULO, L | Region IV-A | Batangas 4th DEO | On-Going | ₱84.2M | 0% | Medium risk58 | Flagged0.022 |
| 25DE0181CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING (AMPITHEATER) BRGY. TINGA, LABAC, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.8M | 18% | High risk94 | Flagged0.019 |
| 24EE0130PACKAGE V-CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM PROJECTS:1. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, CASIAN, TAYTAY2. CONSTRUCTION OF WATER SUPPLY SYSTEM PROJECT (LEVEL II), PHASE II, LIMINANGCONG, TAYTAY3. CONSTR | Region IV-B | Palawan 1st DEO | On-Going | ₱32.6M | 84% | High risk75 | Flagged0.015 |
| 25DD0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF IBAAN - LIPA ROAD INCLUDING | Region IV-A | Batangas 4th DEO | On-Going | ₱72.4M | 90% | High risk95 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24DD0157CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING IN IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱33.6M | 100% | Medium risk52 | —-0.061 |
| 152 | 20DE0144CONSTRUCTION OF EVACUATION CENTER IN BOLBOK, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱34.7M | 100% | Medium risk52 | —-0.101 |
| 153 | 20DJ0117CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM ACADEMIC SCHOOL BUILDING AT DOLORES MACASAET NATIONAL HIGH SCHOOL, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49.7M | 100% | Medium risk52 | —-0.046 |
| 154 | 19DE0036ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, MANILA-BATANGAS RD, K0096+(-120) - K0096+066, K0096+340 - K0098+739, K0104+643 - K0104+798 | Region IV-A | Batangas 2nd DEO | Completed | ₱52.9M | 100% | Medium risk52 | —-0.105 |
| 155 | 23DD0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF PALINDAN- TALAIBON BRIDGE | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.067 |
| 156 | 25DE0180CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING (SEN RAMON REVILLA SR. AMPITHEATER) TINGA, LABAC, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.8M | 2% | Medium risk52 | —-0.032 |
| 157 | 20DD0200LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, IBAAN - SAN JOSE ROAD (PALINDAN - MALAININ SECTION) CONJOINING THE STAR TOLLWAY ENTRY/EXIT, MALAININ, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.106 |
| 158 | 23DD0318CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱28.5M | 100% | Medium risk51 | —-0.103 |
| 159 | 23D00014CONSTRUCTION OF BY-PASS AND DIVERSION ROADSPADRE GARCIA-ROSARIO DIVERSION ROAD, BATANGAS | Region IV-A | Region IV-A | Completed | ₱48.2M | 100% | Medium risk51 | —-0.097 |
| 160 | 23DD0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE AND APPROACHES AT | Region IV-A | Batangas 4th DEO | Completed | ₱9.5M | 100% | Medium risk51 | —-0.069 |
| 161 | 23DE0116OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, BATANGAS-LOBO RD - K0105+(-469) - K0105+555, K0110+082 - K0110+295, K0113+515 - K0113+929 | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 162 | 24DD0195CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF IBAAN - LIPA ROAD, BRGY. | Region IV-A | Batangas 4th DEO | On-Going | ₱46.8M | 100% | Medium risk51 | —-0.071 |
| 163 | 23DD0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE WITH ROA | Region IV-A | Batangas 4th DEO | Completed | ₱19.3M | 100% | Medium risk50 | —-0.068 |
| 164 | 22DD0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BIGAIN SOUTH, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.105 |
| 165 | 24DD0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW GOVERNMENT CENTER), IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱19.2M | 100% | Medium risk50 | —-0.064 |
| 166 | 21DD0062LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY MALAININ, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.105 |
| 167 | 19DD0366LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF DRAINAGE SYSTEM ALONG POBLACION, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.089 |
| 168 | 20DD0326LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF DRAINAGE SYSTEM ALONG POBLACION, LIP | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | Medium risk50 | —-0.089 |
| 169 | 20DE0167CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND RIPRAPPING, BRGY. PAGKILATAN, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱14.5M | 100% | Medium risk50 | —-0.035 |
| 170 | 18DE0146CONSTRUCTION OF EVACUATION CENTER, BARANGAY BANALO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.104 |
| 171 | 24DD0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, BARANGAY TAYSAN, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱17.3M | 100% | Medium risk50 | —-0.064 |
| 172 | 25E00107FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE (KIWIT BR. 1), BUSUANGA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱72.5M | 65% | Medium risk50 | —-0.019 |
| 173 | 20DD0263LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, REHABILITATION/ IMPROVEMENT OF M.B. MEDRANO PLAZA, BRGY. POBLACION, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱19.2M | 100% | Medium risk50 | —-0.104 |
| 174 | 22DD0253CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱14.4M | 100% | Medium risk50 | —-0.105 |
| 175 | 21DD0243LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTIPURPOSE BUILDING INCLUDING FACILITIES AT BARANGAY TAMBO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | Medium risk49 | —-0.107 |