Contractor dossier
9 projects on file, including joint ventures this contractor is part of.
Total projects
9
Total budget
₱244.8M
Average progress
95.7%
Completion rate
88.9%
Average risk score
34.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 6 | ₱145.1M | 29.8 | 0 | 100.0% |
| Region VIII | 2 | ₱6.1M | 35.3 | 0 | 100.0% |
| Negros Island Region | 1 | ₱93.6M | 62.1 | 0 | 61.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 7 | ₱238.7M | 34.5 | 0 | 94.5% |
| Buildings and Facilities | 1 | ₱5M | 48.0 | 0 | 100.0% |
| Bridges | 1 | ₱1.1M | 22.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HK0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF LOOC SHORE PROTECTION, LOOC, SIBULAN | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱93.6M | 61% | High risk62 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24HK0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF LOOC SHORE PROTECTION, LOOC, SIBULAN | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱93.6M | 61% | High risk62 | —-0.012 |
| 2 | 23IA0150CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, TWO (2) CLASSROOMS SCHOOL BUILDING, LO-OK ELEMENTARY SCHOOL, BRGY. LO-OK, ALMERIA, BILIRAN | Region VIII | Biliran DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.055 |
| 3 | 22CC0013CONSTRUCTION OF RIVER PROTECTION, BAGUMBAYAN, BULACAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱26.5M | 100% | Medium risk33 | —-0.092 |
| 4 | 20CC0141CONSTRUCTION OF REVETMENT, BRGY. STO. NINO, PAOMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19.4M | 100% | Low risk30 | —-0.093 |
| 5 | 20CC0140CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY IBA ESTE, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱22.9M | 100% | Low risk29 | —-0.093 |
| 6 | 21CC0270CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY DAMPOL II-B, PULILAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.7M | 100% | Low risk29 | —-0.092 |
| 7 | 19CC0169CONSTRUCTION OF REVETMENT MEYSULAO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱23.7M | 100% | Low risk29 | —-0.093 |
| 8 | 18CC0155CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG ANGAT RIVER CALIZON, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱27.9M | 100% | Low risk29 | —-0.092 |
| 9 | 17IC0018REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, BAGAHUPI BRIDGE (B00051LT) ALONG LEYTE-SAMAR INTER-PROVINCIAL ROAD, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱1.1M | 100% | Low risk23 | —-0.030 |