Contractor dossier
317 projects on file, including joint ventures this contractor is part of.
Total projects
317
Total budget
₱22.3B
Average progress
95.3%
Completion rate
80.8%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
14
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 265 | ₱19.2B | 53.0 | 14 | 95.5% |
| Region XI | 19 | ₱1B | 52.3 | 0 | 90.7% |
| Region IV-A | 15 | ₱502.3M | 50.7 | 0 | 97.1% |
| Region VI | 4 | ₱374.7M | 64.2 | 0 | 81.2% |
| Cordillera Administrative Region | 3 | ₱287.8M | 53.5 | 0 | 100.0% |
| Region IV-B | 3 | ₱289.5M | 52.4 | 0 | 100.0% |
| Negros Island Region | 3 | ₱191.1M | 51.0 | 0 | 100.0% |
| Region I | 2 | ₱175.1M | 50.0 | 0 | 100.0% |
| Region VII | 1 | ₱96.5M | 59.6 | 0 | 100.0% |
| Region XIII | 1 | ₱139.9M | 51.6 | 0 | 100.0% |
| Region II | 1 | ₱55.8M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱8.2B | 50.7 | 0 | 98.5% |
| Buildings and Facilities | 65 | ₱5.9B | 49.2 | 5 | 91.4% |
| Bridges | 55 | ₱2.6B | 48.6 | 0 | 97.1% |
| Flood Control and Drainage | 46 | ₱3.4B | 53.0 | 0 | 97.7% |
| OTHER | 16 | ₱1.3B | 74.1 | 2 | 97.8% |
| GAA 2025 SSP | 6 | ₱313.8M | 94.8 | 6 | 54.1% |
| GAA 2025 OO-1 | 4 | ₱196.3M | 92.6 | 1 | 82.4% |
| Water Provision and Storage | 4 | ₱320.8M | 52.8 | 0 | 87.7% |
| Bridges, Roads | 2 | ₱163.4M | 57.3 | 0 | 75.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 25KE0007REPLACEMENT OF PERMANENT WEAK BRIDGES MAUBOG BR.2 (B00005CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | On-Going | ₱57.6M | 95% | High risk94 | —-0.011 |
| 25KE0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0012 + 687 - K0012 + 784, K0024 + 463 - K0024 + 796, K0025 + 350 - K0025 + 910, K0026 + 160 - K0026 + 617 | Region X | Camiguin DEO | On-Going | ₱40.4M | 99% | High risk92 | —-0.014 |
| 25KE0002ROAD WIDENING - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0024 + 464.15 - K0025 + 463 | Region X | Camiguin DEO | On-Going | ₱24.4M | 92% | High risk91 | —-0.012 |
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 24K00069COMPLETION OF DPWH REGIONAL OFFICE X MULTI-STOREY BUILDING (PHASE V), BULUA, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱95.5M | 100% | High risk78 | —-0.028 |
| 17K00176WIDENING OF PERM BR TO MORE THAN 2 LANES,CABULIG BR 1 ALONG BCIR,MIS. OR 2ND LD | Region X | Region X | Completed | ₱116.7M | 100% | High risk78 | —-0.005 |
| 17K00087WIDENING OF PERMANENT BR TO MORE THAN 2 LANES, NAAWAN BR ALONG BCIR(PH II),MIS.OR.2ND LD | Region X | Region X | Completed | ₱57.6M | 100% | High risk76 | —-0.039 |
| 23K00281CONSTRUCTION OF ROAD LEADING TO SCIENCE AND TECHNOLOGY PARK, LIBERTAD SECTION, MISAMIS ORIENTAL, PACKAGE 1 | Region X | Region X | On-Going | ₱47.8M | 100% | High risk76 | —-0.004 |
| 24KE0069CONSTRUCTION OF SAN ROQUE SEAWALL, MAHINOG, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱28.8M | 100% | High risk73 | —-0.011 |
| 18KE0012CONSTRUCTION/IMPROVEMENT OF CROSS -COUNTRY ROAD FROM MAINIT CATARMAN TO MAMBAJAO | Region X | Camiguin DEO | Completed | ₱46.5M | 100% | High risk73 | —-0.041 |
| 23K00096CONST. OF BY-PASS AND DIVERSION ROADS, CLAVERIA-BALINGOAN BY-PASS ROAD, PACKAGE 7, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱42.5M | 100% | High risk73 | —-0.030 |
| 23KB0136CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (MARAMAG GYMNASIUM SITE DEVELOPMENT), BRGY. PANADTALAN, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱47M | 100% | High risk73 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 24K00497LGU HOSPITALS - CATARMAN DISTRICT HOSPITAL, CAMIGUIN | Region X | Region X | On-Going | ₱74M | 39% | Medium risk52 | Flagged0.019 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 23KE0066CONSTRUCTION OF NEW CATARMAN DISTRICT HOSPITAL BUILDING AND COMPLEX (PHASEI) CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.5M | 100% | Medium risk51 | Flagged0.006 |
| 24K00335CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 2) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 19K00433PROPOSED CONSTRUCTION OF NORTHERN MINDANAO CULTURE AND ARTS CENTER, BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱139.9M | 100% | Medium risk51 | Flagged0.003 |
| 24K00334CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 1) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 23KE0006WIDENING OF PERMANENT BRIDGES MAUBOG BRIDGE II (B00005CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.061 |
| 252 | 20KE0070CONSTRUCTION OF CAMPANA-BINUNSARAN BRIDGE | Region X | Camiguin DEO | Completed | ₱17.8M | 100% | Medium risk46 | —-0.061 |
| 253 | 23K00153CONSTRUCTION OF ROAD LEADING TO SCIENCE AND TECHNOLOGY PARK, GITAGUM SECTION, MISAMIS ORIENTAL, PACKAGE 1 | Region X | Region X | Completed | ₱46.6M | 100% | Medium risk46 | —-0.088 |
| 254 | 17K00169IMPRVT./WIDENING OF NATL ROADS,BCIR, MIS.OR 2ND LD | Region X | Region X | Completed | ₱91.3M | 100% | Medium risk46 | —-0.053 |
| 255 | 19KE0027WIDENING OF TUPSAN BRIDGE (B00008CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.061 |
| 256 | 20KE0047WIDENING OF PERMANENT BRIDGES ALGA BRIDGE (B00017CG) ALONG CCR | Region X | Camiguin DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.058 |
| 257 | 23KE0005WIDENING OF PERMANENT BRIDGES MAAC BRIDGE (BOOO26CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD,GUINSILIBAN,CAMIGUIN | Region X | Camiguin DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.060 |
| 258 | 20KE0036WIDENING OF PERMANENT BRIDGES PUTI BRIDGE (B00018CG) ALONG CCR | Region X | Camiguin DEO | Completed | ₱16.3M | 100% | Medium risk46 | —-0.062 |
| 259 | 21KA0097REHABILITATION /RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE ALONG KAPALONG -TALAINGOD -VALENCIA (BUKIDNON) RD K1545 + 860 - K1546 + 160 | Region X | Bukidnon 1st DEO | Completed | ₱40.8M | 100% | Medium risk46 | —-0.090 |
| 260 | 23KE0004WIDENING OF PERMANENT BRIDGES BAYLAO BRIDGE (B00029CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.061 |
| 261 | 23KL0028ACCESS ROAD LEADING TO MALANANG OSTRICH FARM, BRGY. MALANANG, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.093 |
| 262 | 19KE0026WIDENING OF HUBANGON BRIDGE (B00025CG) ALONG CCR | Region X | Camiguin DEO | Completed | ₱11.2M | 100% | Medium risk46 | —-0.061 |
| 263 | 19KE0054WIDENING OF ANITO BRIDGE (B00006CG)ALONG CCR | Region X | Camiguin DEO | Completed | ₱10.2M | 100% | Medium risk46 | —-0.061 |
| 264 | 23K00114ROAD WIDENING-TERTIARY ROADS, JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD(AGLAYAN-BASAK)-K1541+407-K1542+509 | Region X | Region X | Completed | ₱34.6M | 100% | Medium risk46 | —-0.092 |
| 265 | 21KE0047CROSS COUNTRY ROAD FROM MAINIT,CATARMAN TO MAMBAJAO,CAMIGUIN | Region X | Camiguin DEO | Completed | ₱30.6M | 100% | Medium risk46 | —-0.095 |
| 266 | 24KA0014REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES: KALASUNGAY BRIDGE (B01368MN) ALONG SAYRE HIGHWAY, BRGY. KALASUNGAY, MALAYBALAY CITY, BUKIDNON, 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱10.8M | 100% | Medium risk46 | —-0.061 |
| 267 | 19KE0050WIDENING OF TRINING BRIDGE (B00001CG)ALONG CCR | Region X | Camiguin DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.060 |
| 268 | 19KE0048WIDENING OF BALBAGON BRIDGE II (B00003CG)ALONG CCR | Region X | Camiguin DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.061 |
| 269 | 19KE0049WIDENING OF MAUBOG BRIDGE(B00027CG)ALONG CCR | Region X | Camiguin DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.061 |
| 270 | 23KE0054CONSTRUCTION OF MULTI-PURPOSE FACILITY (NEW GRANDSTAND),CONGRESSMAN PEDRO ROMUALDO SPORTS COMPLEX | Region X | Camiguin DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.086 |
| 271 | 22K00080CONSTRUCTION OF BYPASS AND DIVERSION ROADS, PUERTO-CLAVERIA BY-PASS ROAD, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱37.4M | 100% | Medium risk45 | —-0.085 |
| 272 | 21K00120ROAD WIDENING-PRIMARY ROADS,BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD-K1370+493-K1371+501 | Region X | Region X | Completed | ₱36.7M | 100% | Medium risk45 | —-0.089 |
| 273 | 20KC0093CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER PACKAGE 4, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.079 |
| 274 | 20KC0092CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER PACKAGE 3, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.079 |
| 275 | 17K00076IMPRVT./WIDENING OF NATL RDS, BCIR-K1405+189-K1405+706,K1405+886-K1406+414,K1406+522-K1406+1000,K141 | Region X | Region X | Completed | ₱85.9M | 100% | Medium risk45 | —-0.043 |