Contractor dossier
317 projects on file, including joint ventures this contractor is part of.
Total projects
317
Total budget
₱22.3B
Average progress
95.3%
Completion rate
80.8%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
14
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 265 | ₱19.2B | 53.0 | 14 | 95.5% |
| Region XI | 19 | ₱1B | 52.3 | 0 | 90.7% |
| Region IV-A | 15 | ₱502.3M | 50.7 | 0 | 97.1% |
| Region VI | 4 | ₱374.7M | 64.2 | 0 | 81.2% |
| Cordillera Administrative Region | 3 | ₱287.8M | 53.5 | 0 | 100.0% |
| Region IV-B | 3 | ₱289.5M | 52.4 | 0 | 100.0% |
| Negros Island Region | 3 | ₱191.1M | 51.0 | 0 | 100.0% |
| Region I | 2 | ₱175.1M | 50.0 | 0 | 100.0% |
| Region VII | 1 | ₱96.5M | 59.6 | 0 | 100.0% |
| Region XIII | 1 | ₱139.9M | 51.6 | 0 | 100.0% |
| Region II | 1 | ₱55.8M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱8.2B | 50.7 | 0 | 98.5% |
| Buildings and Facilities | 65 | ₱5.9B | 49.2 | 5 | 91.4% |
| Bridges | 55 | ₱2.6B | 48.6 | 0 | 97.1% |
| Flood Control and Drainage | 46 | ₱3.4B | 53.0 | 0 | 97.7% |
| OTHER | 16 | ₱1.3B | 74.1 | 2 | 97.8% |
| GAA 2025 SSP | 6 | ₱313.8M | 94.8 | 6 | 54.1% |
| GAA 2025 OO-1 | 4 | ₱196.3M | 92.6 | 1 | 82.4% |
| Water Provision and Storage | 4 | ₱320.8M | 52.8 | 0 | 87.7% |
| Bridges, Roads | 2 | ₱163.4M | 57.3 | 0 | 75.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 25KE0007REPLACEMENT OF PERMANENT WEAK BRIDGES MAUBOG BR.2 (B00005CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | On-Going | ₱57.6M | 95% | High risk94 | —-0.011 |
| 25KE0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0012 + 687 - K0012 + 784, K0024 + 463 - K0024 + 796, K0025 + 350 - K0025 + 910, K0026 + 160 - K0026 + 617 | Region X | Camiguin DEO | On-Going | ₱40.4M | 99% | High risk92 | —-0.014 |
| 25KE0002ROAD WIDENING - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0024 + 464.15 - K0025 + 463 | Region X | Camiguin DEO | On-Going | ₱24.4M | 92% | High risk91 | —-0.012 |
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 24K00069COMPLETION OF DPWH REGIONAL OFFICE X MULTI-STOREY BUILDING (PHASE V), BULUA, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱95.5M | 100% | High risk78 | —-0.028 |
| 17K00176WIDENING OF PERM BR TO MORE THAN 2 LANES,CABULIG BR 1 ALONG BCIR,MIS. OR 2ND LD | Region X | Region X | Completed | ₱116.7M | 100% | High risk78 | —-0.005 |
| 17K00087WIDENING OF PERMANENT BR TO MORE THAN 2 LANES, NAAWAN BR ALONG BCIR(PH II),MIS.OR.2ND LD | Region X | Region X | Completed | ₱57.6M | 100% | High risk76 | —-0.039 |
| 23K00281CONSTRUCTION OF ROAD LEADING TO SCIENCE AND TECHNOLOGY PARK, LIBERTAD SECTION, MISAMIS ORIENTAL, PACKAGE 1 | Region X | Region X | On-Going | ₱47.8M | 100% | High risk76 | —-0.004 |
| 24KE0069CONSTRUCTION OF SAN ROQUE SEAWALL, MAHINOG, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱28.8M | 100% | High risk73 | —-0.011 |
| 18KE0012CONSTRUCTION/IMPROVEMENT OF CROSS -COUNTRY ROAD FROM MAINIT CATARMAN TO MAMBAJAO | Region X | Camiguin DEO | Completed | ₱46.5M | 100% | High risk73 | —-0.041 |
| 23K00096CONST. OF BY-PASS AND DIVERSION ROADS, CLAVERIA-BALINGOAN BY-PASS ROAD, PACKAGE 7, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱42.5M | 100% | High risk73 | —-0.030 |
| 23KB0136CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (MARAMAG GYMNASIUM SITE DEVELOPMENT), BRGY. PANADTALAN, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱47M | 100% | High risk73 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 24K00497LGU HOSPITALS - CATARMAN DISTRICT HOSPITAL, CAMIGUIN | Region X | Region X | On-Going | ₱74M | 39% | Medium risk52 | Flagged0.019 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 23KE0066CONSTRUCTION OF NEW CATARMAN DISTRICT HOSPITAL BUILDING AND COMPLEX (PHASEI) CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.5M | 100% | Medium risk51 | Flagged0.006 |
| 24K00335CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 2) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 19K00433PROPOSED CONSTRUCTION OF NORTHERN MINDANAO CULTURE AND ARTS CENTER, BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱139.9M | 100% | Medium risk51 | Flagged0.003 |
| 24K00334CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 1) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18KD0016CONST OF BITAN-AG BRIDGE II & APPROACHES (6 LANES REPLACEMENT OF OLD BOX CULVERT) INCL ROW, LKKS, | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱32.6M | 100% | High risk71 | —-0.024 |
| 27 | 24GH0081CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BARRIDO, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱29.4M | 100% | High risk69 | —-0.046 |
| 28 | 25GH0142CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANGOROCORO, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱143.6M | 29% | High risk68 | —-0.004 |
| 29 | 17DQ0029MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM ALONG DASMARIÑAS-CARMONA ROAD DRAINAGE OUTFALL (JUNCTION MINDANAO AVE. TO EMBARKADERO RIVER), CAVI | Region IV-A | Cavite 3rd DEO | Completed | ₱18.5M | 100% | High risk67 | —-0.060 |
| 30 | 24GH0082CONSTRUCTION OF SEAWALL, BARANGAY POBLACION, SAN DIONISIO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱144.8M | 96% | High risk67 | —-0.014 |
| 31 | 24DF0117CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/FACILITIES CONST OF RD AT ALAPAN IIB RD LEADING TO BRGY HALL BRGY ALAPAN IIB | Region IV-A | Cavite 1st DEO | Completed | ₱9.8M | 100% | High risk67 | —-0.072 |
| 32 | 24L00106REPLACEMENT OF BRIDGE - JCT MATTI (ALONG DAVAO-COT. ROAD) - JCT AURORA (ALONG DIGOS - MAKAR ROAD) BYPASS ROAD, PACKAGE 3, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱114.4M | 50% | High risk67 | —-0.012 |
| 33 | 17DQ0043LOCALLY FUNDED PROJECTS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROADS AND BRIDGES - LOCAL ROADS ASPHALT OVERLAY INCLUDING CONSTRUCTION OF DRAINAGE SYSTEM WITH PAVING OF SHOULDER OF DASMAR | Region IV-A | Cavite 3rd DEO | Completed | ₱18.8M | 100% | High risk66 | —-0.075 |
| 34 | 20L00086CONSTRUCTION OF CONCRETE ROAD-MATANAO-KIBLAWAN-PADADA ROAD, PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱178.3M | 100% | High risk66 | —-0.057 |
| 35 | 23K00072CONST. OF BY-PASS AND DIVERSION ROADS, CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱144.7M | 100% | High risk63 | —-0.027 |
| 36 | 20K00203CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDO - NEW WESTERN DIVERSION ROAD, (CANITO-AN - CAGAYAN DE ORO COASTAL ROAD), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱137.5M | 100% | High risk62 | —-0.037 |
| 37 | 18L00046CONC. OF BRGY. POBLACION-BRGY. DALAWINON RD CONNECTING TO BRGY. KASUGA IN SUPPORT OF MEAT PROCESSING | Region XI | Region XI | Completed | ₱113.3M | 100% | High risk62 | —-0.074 |
| 38 | 18K00234CLUSTER 33 ROAD WIDENING IN MISAMIS ORIENTAL | Region X | Region X | Completed | ₱242.9M | 100% | High risk62 | —-0.050 |
| 39 | 19K00008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGWA RIVER, BARANGAY HALAPITAN (POBLACION), SAN FERNANDO, BUKIDNON | Region X | Region X | Completed | ₱96.2M | 100% | High risk61 | —-0.062 |
| 40 | 18L00011WIDENING (4 INTO 6 LANES) OF DAVAO-COT. RD(DAVAO CITY-DIGOS SECT.) INCLUDING RROW,(SINAWILAN-COGON S | Region XI | Region XI | Completed | ₱114M | 100% | High risk61 | —-0.066 |
| 41 | 24K00116CONSTRUCTION OF FLOOD CONTROL ALONG GINGOOG RIVER (BARANGAY 20 AT PUROK 4 TO 6), GINGOOG CITY, MISAMIS ORIENTAL (PHASE 2) | Region X | Region X | On-Going | ₱138.5M | 95% | High risk61 | —-0.018 |
| 42 | 24K00115CONSTRUCTION OF FLOOD CONTROL ALONG GINGOOG RIVER (BARANGAY 20 AT PUROK 4 TO 6), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱138.5M | 95% | High risk61 | —-0.018 |
| 43 | 23KD0031CONSTRUCTION OF REVETMENT ALONG CAGAYAN DE ORO RIVER BASIN FLOOD CONTROL PROJECT (PUNTOD-MACABALAN) | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱94.6M | 100% | High risk61 | —-0.065 |
| 44 | 24K00012CONST. OF BY-PASS AND DIVERSION ROADS, CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 13, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱95.5M | 96% | High risk60 | —-0.014 |
| 45 | 25K00123CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN (PHASE 2) | Region X | Region X | On-Going | ₱95.5M | 51% | High risk60 | —-0.012 |
| 46 | 23KE0035CONSTRUCTION OF DINANGASAN BRIDGE PHASE 1 ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | Completed | ₱93.6M | 100% | High risk60 | —-0.033 |
| 47 | 19DQ0124LOCAL PROGRAM - CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - WIDENING OF DAANG HARI, BACOOR, CAVITE | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk60 | —-0.091 |
| 48 | 22K00120CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG DANGOAN RIVER (DOWNSTREAM), STA.0+000-STA.0+397.966 & STA.0+767.565-STA.1+101.000, MEDINA, MISAMIS ORIETAL | Region X | Region X | Completed | ₱126.3M | 100% | High risk60 | —-0.057 |
| 49 | 21K00242CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE CHANNEL FROM BCIR TO IPONAN RIVER, PACKAGE 6, BULUA, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱96.2M | 100% | High risk60 | —-0.054 |
| 50 | 21K00239CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SINGLE BARREL DIVERSION DRAINAGE LINE CONNECTING THE EXISTING BITAN-AG CHANNEL AT LKKS TO DIVERSION DRAINAGE LINE ALONG BCIR AND AGORA TERMINAL ROAD, LAPASAN, | Region X | Region X | Completed | ₱114.9M | 100% | High risk60 | —-0.049 |