Contractor dossier
317 projects on file, including joint ventures this contractor is part of.
Total projects
317
Total budget
₱22.3B
Average progress
95.3%
Completion rate
80.8%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
14
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 265 | ₱19.2B | 53.0 | 14 | 95.5% |
| Region XI | 19 | ₱1B | 52.3 | 0 | 90.7% |
| Region IV-A | 15 | ₱502.3M | 50.7 | 0 | 97.1% |
| Region VI | 4 | ₱374.7M | 64.2 | 0 | 81.2% |
| Cordillera Administrative Region | 3 | ₱287.8M | 53.5 | 0 | 100.0% |
| Region IV-B | 3 | ₱289.5M | 52.4 | 0 | 100.0% |
| Negros Island Region | 3 | ₱191.1M | 51.0 | 0 | 100.0% |
| Region I | 2 | ₱175.1M | 50.0 | 0 | 100.0% |
| Region VII | 1 | ₱96.5M | 59.6 | 0 | 100.0% |
| Region XIII | 1 | ₱139.9M | 51.6 | 0 | 100.0% |
| Region II | 1 | ₱55.8M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱8.2B | 50.7 | 0 | 98.5% |
| Buildings and Facilities | 65 | ₱5.9B | 49.2 | 5 | 91.4% |
| Bridges | 55 | ₱2.6B | 48.6 | 0 | 97.1% |
| Flood Control and Drainage | 46 | ₱3.4B | 53.0 | 0 | 97.7% |
| OTHER | 16 | ₱1.3B | 74.1 | 2 | 97.8% |
| GAA 2025 SSP | 6 | ₱313.8M | 94.8 | 6 | 54.1% |
| GAA 2025 OO-1 | 4 | ₱196.3M | 92.6 | 1 | 82.4% |
| Water Provision and Storage | 4 | ₱320.8M | 52.8 | 0 | 87.7% |
| Bridges, Roads | 2 | ₱163.4M | 57.3 | 0 | 75.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 25KE0007REPLACEMENT OF PERMANENT WEAK BRIDGES MAUBOG BR.2 (B00005CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | On-Going | ₱57.6M | 95% | High risk94 | —-0.011 |
| 25KE0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0012 + 687 - K0012 + 784, K0024 + 463 - K0024 + 796, K0025 + 350 - K0025 + 910, K0026 + 160 - K0026 + 617 | Region X | Camiguin DEO | On-Going | ₱40.4M | 99% | High risk92 | —-0.014 |
| 25KE0002ROAD WIDENING - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0024 + 464.15 - K0025 + 463 | Region X | Camiguin DEO | On-Going | ₱24.4M | 92% | High risk91 | —-0.012 |
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 24K00069COMPLETION OF DPWH REGIONAL OFFICE X MULTI-STOREY BUILDING (PHASE V), BULUA, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱95.5M | 100% | High risk78 | —-0.028 |
| 17K00176WIDENING OF PERM BR TO MORE THAN 2 LANES,CABULIG BR 1 ALONG BCIR,MIS. OR 2ND LD | Region X | Region X | Completed | ₱116.7M | 100% | High risk78 | —-0.005 |
| 17K00087WIDENING OF PERMANENT BR TO MORE THAN 2 LANES, NAAWAN BR ALONG BCIR(PH II),MIS.OR.2ND LD | Region X | Region X | Completed | ₱57.6M | 100% | High risk76 | —-0.039 |
| 23K00281CONSTRUCTION OF ROAD LEADING TO SCIENCE AND TECHNOLOGY PARK, LIBERTAD SECTION, MISAMIS ORIENTAL, PACKAGE 1 | Region X | Region X | On-Going | ₱47.8M | 100% | High risk76 | —-0.004 |
| 24KE0069CONSTRUCTION OF SAN ROQUE SEAWALL, MAHINOG, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱28.8M | 100% | High risk73 | —-0.011 |
| 18KE0012CONSTRUCTION/IMPROVEMENT OF CROSS -COUNTRY ROAD FROM MAINIT CATARMAN TO MAMBAJAO | Region X | Camiguin DEO | Completed | ₱46.5M | 100% | High risk73 | —-0.041 |
| 23K00096CONST. OF BY-PASS AND DIVERSION ROADS, CLAVERIA-BALINGOAN BY-PASS ROAD, PACKAGE 7, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱42.5M | 100% | High risk73 | —-0.030 |
| 23KB0136CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (MARAMAG GYMNASIUM SITE DEVELOPMENT), BRGY. PANADTALAN, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱47M | 100% | High risk73 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 24K00497LGU HOSPITALS - CATARMAN DISTRICT HOSPITAL, CAMIGUIN | Region X | Region X | On-Going | ₱74M | 39% | Medium risk52 | Flagged0.019 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 23KE0066CONSTRUCTION OF NEW CATARMAN DISTRICT HOSPITAL BUILDING AND COMPLEX (PHASEI) CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.5M | 100% | Medium risk51 | Flagged0.006 |
| 24K00335CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 2) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 19K00433PROPOSED CONSTRUCTION OF NORTHERN MINDANAO CULTURE AND ARTS CENTER, BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱139.9M | 100% | Medium risk51 | Flagged0.003 |
| 24K00334CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 1) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21K00069CONST.(COMPLETION) OF DPWH REGIONAL OFFICE X MULTI-STOREY BUILDING WITH 4 LEVEL PARKING, BULUA, CDOC | Region X | Region X | Completed | ₱187.2M | 100% | Medium risk58 | —-0.062 |
| 77 | 24KB0190CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON CARLOS SPORTS COMPLEX, DON CARLOS, BUKIDNON (PHASE 1) | Region X | Bukidnon 2nd DEO | On-Going | ₱96.3M | 95% | Medium risk58 | —-0.037 |
| 78 | 21K00308CONSTRUCTION OF MULTI-PURPOSE BUILDING (AQUATIC CENTER), BRGY. LAGUITAS, MALAYBALAY BUKIDNON | Region X | Region X | Completed | ₱144M | 100% | Medium risk58 | —-0.066 |
| 79 | 22K00232CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GRANDSTAND 2), BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱140.7M | 100% | Medium risk57 | —-0.054 |
| 80 | 25K00412CONSTRUCTION OF MULTI-PURPOSE BUILDING (AQUATIC CENTER), BUKIDNON SPORTS COMPLEX, BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON PACKAGE 2 | Region X | Region X | On-Going | ₱153.6M | 44% | Medium risk57 | —-0.017 |
| 81 | 21K00278CLUSTER RO-O2 CONSTRUCTION OF BUILDING PROJECTS IN BUKIDNON | Region X | Region X | Completed | ₱278.7M | 100% | Medium risk57 | —-0.038 |
| 82 | 18K00340CONSTRUCTION OF MULTI-PURPOSE FACILITY (GRANDSTAND - 1) | Region X | Region X | Completed | ₱227.3M | 100% | Medium risk57 | —-0.045 |
| 83 | 22K00231CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GRANDSTAND 1), BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱187.6M | 100% | Medium risk57 | —-0.048 |
| 84 | 21K00094CONST. OF ROAD,FROM COURT OF APPEALS TO CDO CONVENTION CENTER, BRGY.INDAHAG,CDOC, MIS OR | Region X | Region X | Completed | ₱94M | 100% | Medium risk57 | —-0.075 |
| 85 | 19K00047ROAD WIDENING, CAMIGUIN CIRCUMFERENTIAL ROAD, K0005+250 - K0005+862, K0008+000 - K0009+597, K0009+812 - K0011+116, CAMIGUIN | Region X | Region X | Completed | ₱128M | 100% | Medium risk57 | —-0.064 |
| 86 | 20K00046ROAD WIDENING, CAMIGUIN CIRCUMFERENTIAL RD - K0002+732 - K0002+817, K0002+827 - K0002+927, K0004+649 - K0004+850, K0004+918 - K0004+961, K0009+597 - K0009+697, K0009+716 - K0009+812, K0011+848 - K0012+177, K0012+218 - K0012+310, K0013+797 - K0014+358, ... | Region X | Region X | Completed | ₱128.3M | 100% | Medium risk57 | —-0.071 |
| 87 | 23K00052CONST. OF BY-PASS AND DIVERSION ROADS ,PUERTO-CLAVERIA BY-PASS ROAD, PACKAGE 8, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱95M | 100% | Medium risk57 | —-0.076 |
| 88 | 18K00123CONST. OF BYPASS/DIVERSION ROADS,CLAVERIA-BALINGOAN BYPASS ROAD,PACKAGE 3, INCL. ROW, MIS OR. | Region X | Region X | Completed | ₱117.9M | 100% | Medium risk57 | —-0.080 |
| 89 | 22KB0161CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. PANADTALAN, MARAMAG, BUKIDNON (PHASE 2), BRGY. PANADTALAN, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.066 |
| 90 | 20K00191CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CLAVERIA - BALINGOAN BY-PASS ROAD, (MAPUA - DAHILIG SECTION), MISAMIS ORIENTAL | Region X | Region X | Completed | ₱128.2M | 100% | Medium risk57 | —-0.071 |
| 91 | 20K00192CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CLAVERIA - BALINGOAN BY-PASS ROAD, (KABANGASAN - MAPUA SECTION), MISAMIS ORIENTAL | Region X | Region X | Completed | ₱128.3M | 100% | Medium risk57 | —-0.074 |
| 92 | 21K00014CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CLAVERIA-BALINGOAN BYPASS ROAD, PACKAGE 12, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱96.2M | 100% | Medium risk57 | —-0.082 |
| 93 | 19KA0048CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ON SPECIFIC LOCATIONS ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD (S00641MN) K1540 + 741.06 TO K1570 + 827SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |
| 94 | 24KA0145CONSTRUCTION OF WATER SYSTEM-LEVEL III, BARANGAY IMBAYAO, MALAYBALAY CITY, BUKIDNON (PHASE 2)BARANGAY IMBAYAO, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.040 |
| 95 | 25K00104CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAGAYAN DE ORO CONVENTION CENTER, BARANGAY INDAHAG, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱98M | 60% | Medium risk57 | —-0.034 |
| 96 | 21K00296CONSTRUCTION/ IMPROVEMENT OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱113.9M | 100% | Medium risk56 | —-0.062 |
| 97 | 25KA0088CONSTRUCTION OF WATER SYSTEM - LEVEL III, BARANGAY IMBAYAO, MALAYBALAY CITY, BUKIDNON (PHASE 3), BARANGAY IMBAYAO, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱99M | 51% | Medium risk56 | —-0.008 |
| 98 | 20K00047CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CROSS COUNTRY ROAD FROM MAINIT, CATARMAN TO MAMBAJAO, CAMIGUIN | Region X | Region X | Completed | ₱97.7M | 100% | Medium risk56 | —-0.078 |
| 99 | 22L00153CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE H, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱76.7M | 98% | Medium risk56 | —-0.023 |
| 100 | 23K00038CONST. OF BY-PASS AND DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 10, LANAO DEL NORTE | Region X | Region X | Completed | ₱104.6M | 100% | Medium risk56 | —-0.081 |