Contractor dossier
317 projects on file, including joint ventures this contractor is part of.
Total projects
317
Total budget
₱22.3B
Average progress
95.3%
Completion rate
80.8%
Average risk score
53.0
Medium risk on average, out of 100
Flagged as unusual
14
4.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 265 | ₱19.2B | 53.0 | 14 | 95.5% |
| Region XI | 19 | ₱1B | 52.3 | 0 | 90.7% |
| Region IV-A | 15 | ₱502.3M | 50.7 | 0 | 97.1% |
| Region VI | 4 | ₱374.7M | 64.2 | 0 | 81.2% |
| Cordillera Administrative Region | 3 | ₱287.8M | 53.5 | 0 | 100.0% |
| Region IV-B | 3 | ₱289.5M | 52.4 | 0 | 100.0% |
| Negros Island Region | 3 | ₱191.1M | 51.0 | 0 | 100.0% |
| Region I | 2 | ₱175.1M | 50.0 | 0 | 100.0% |
| Region VII | 1 | ₱96.5M | 59.6 | 0 | 100.0% |
| Region XIII | 1 | ₱139.9M | 51.6 | 0 | 100.0% |
| Region II | 1 | ₱55.8M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱8.2B | 50.7 | 0 | 98.5% |
| Buildings and Facilities | 65 | ₱5.9B | 49.2 | 5 | 91.4% |
| Bridges | 55 | ₱2.6B | 48.6 | 0 | 97.1% |
| Flood Control and Drainage | 46 | ₱3.4B | 53.0 | 0 | 97.7% |
| OTHER | 16 | ₱1.3B | 74.1 | 2 | 97.8% |
| GAA 2025 SSP | 6 | ₱313.8M | 94.8 | 6 | 54.1% |
| GAA 2025 OO-1 | 4 | ₱196.3M | 92.6 | 1 | 82.4% |
| Water Provision and Storage | 4 | ₱320.8M | 52.8 | 0 | 87.7% |
| Bridges, Roads | 2 | ₱163.4M | 57.3 | 0 | 75.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 25KE0007REPLACEMENT OF PERMANENT WEAK BRIDGES MAUBOG BR.2 (B00005CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD | Region X | Camiguin DEO | On-Going | ₱57.6M | 95% | High risk94 | —-0.011 |
| 25KE0001CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0012 + 687 - K0012 + 784, K0024 + 463 - K0024 + 796, K0025 + 350 - K0025 + 910, K0026 + 160 - K0026 + 617 | Region X | Camiguin DEO | On-Going | ₱40.4M | 99% | High risk92 | —-0.014 |
| 25KE0002ROAD WIDENING - SECONDARY ROADS CAMIGUIN CIRCUMFERENTIAL RD - K0024 + 464.15 - K0025 + 463 | Region X | Camiguin DEO | On-Going | ₱24.4M | 92% | High risk91 | —-0.012 |
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 24K00069COMPLETION OF DPWH REGIONAL OFFICE X MULTI-STOREY BUILDING (PHASE V), BULUA, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱95.5M | 100% | High risk78 | —-0.028 |
| 17K00176WIDENING OF PERM BR TO MORE THAN 2 LANES,CABULIG BR 1 ALONG BCIR,MIS. OR 2ND LD | Region X | Region X | Completed | ₱116.7M | 100% | High risk78 | —-0.005 |
| 17K00087WIDENING OF PERMANENT BR TO MORE THAN 2 LANES, NAAWAN BR ALONG BCIR(PH II),MIS.OR.2ND LD | Region X | Region X | Completed | ₱57.6M | 100% | High risk76 | —-0.039 |
| 23K00281CONSTRUCTION OF ROAD LEADING TO SCIENCE AND TECHNOLOGY PARK, LIBERTAD SECTION, MISAMIS ORIENTAL, PACKAGE 1 | Region X | Region X | On-Going | ₱47.8M | 100% | High risk76 | —-0.004 |
| 24KE0069CONSTRUCTION OF SAN ROQUE SEAWALL, MAHINOG, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱28.8M | 100% | High risk73 | —-0.011 |
| 18KE0012CONSTRUCTION/IMPROVEMENT OF CROSS -COUNTRY ROAD FROM MAINIT CATARMAN TO MAMBAJAO | Region X | Camiguin DEO | Completed | ₱46.5M | 100% | High risk73 | —-0.041 |
| 23K00096CONST. OF BY-PASS AND DIVERSION ROADS, CLAVERIA-BALINGOAN BY-PASS ROAD, PACKAGE 7, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱42.5M | 100% | High risk73 | —-0.030 |
| 23KB0136CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (MARAMAG GYMNASIUM SITE DEVELOPMENT), BRGY. PANADTALAN, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱47M | 100% | High risk73 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00415CONSTRUCTION OF BRIDGE FROM BARANGAY BENONI, MAHINOG TO BARANGAY MAAC, GUINSILIBAN, CAMIGUIN | Region X | Region X | On-Going | ₱382.1M | 65% | High risk79 | Flagged0.034 |
| 24K00497LGU HOSPITALS - CATARMAN DISTRICT HOSPITAL, CAMIGUIN | Region X | Region X | On-Going | ₱74M | 39% | Medium risk52 | Flagged0.019 |
| 25KL0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL PUBLIC MARKET) AT MIGBANDAY, POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱69.2M | 37% | High risk94 | Flagged0.017 |
| 25KL0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (NAAWAN PUBLIC MARKET), NAAWAN, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 2nd DEO | On-Going | ₱24.6M | 32% | High risk95 | Flagged0.012 |
| 25KK0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (MEDINA MUNICIPAL HALL), BARANGAY NORTH POBLACION, MEDINA, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱58.2M | 54% | High risk95 | Flagged0.012 |
| 25KL0103CONSTRUCTION OF MULTI PURPOSE BUILDING (PUBLIC MARKET) POBLACION, MANTICAO, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱26.6M | 41% | High risk95 | Flagged0.012 |
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Region X | Misamis Oriental 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25KK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), BARANGAY POBLACION, TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱39.6M | 70% | High risk94 | Flagged0.008 |
| 23KE0066CONSTRUCTION OF NEW CATARMAN DISTRICT HOSPITAL BUILDING AND COMPLEX (PHASEI) CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.5M | 100% | Medium risk51 | Flagged0.006 |
| 24K00335CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 2) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 25K00140WIDENING OF PERMANENT BRIDGES AGUS PARALLEL BR. ALONG OVERTON-BURU-UN BDRY RD | Region X | Region X | On-Going | ₱73.9M | 44% | High risk94 | Flagged0.003 |
| 19K00433PROPOSED CONSTRUCTION OF NORTHERN MINDANAO CULTURE AND ARTS CENTER, BRGY. LAGUITAS, MALAYBALAY, BUKIDNON | Region X | Region X | Completed | ₱139.9M | 100% | Medium risk51 | Flagged0.003 |
| 24K00334CONSTRUCTION OF AIRPORT FACILITY (CAMIGUIN AIRPORT RUNWAY), BARANGAY LUMAD, MAMBAJAO, CAMIGUIN (PHASE 1) | Region X | Region X | On-Going | ₱238.8M | 21% | Medium risk60 | Flagged0.003 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 17K00164IMPRVT./WIDENING OF NATL RDS BCIR, MIS. OR. 1ST LD | Region X | Region X | Completed | ₱110.6M | 100% | Medium risk48 | —-0.053 |
| 202 | 23L00051ROAD WIDENING - JCT. MATTI (ALONG DAVAO-COT. ROAD) - JCT. AURORA (ALONG DIGOS-MAKAR ROAD) BYPASS ROAD PACKAGE 2, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱42.2M | 40% | Medium risk48 | —-0.025 |
| 203 | 24KE0087CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALBAGON, MAMBAJAO, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱29.5M | 99% | Medium risk48 | —-0.055 |
| 204 | 18K00051CONST. OF AGORA BRIDGE & APPROACHES(6-LANES REPLACEMENT OF OLD BOX CULVERT)OVER BITAN-AG CREEK INCL. | Region X | Region X | Completed | ₱53.9M | 100% | Medium risk48 | —-0.059 |
| 205 | 21KA0116CONCRETING OF ROAD WITH BRIDGE ALONG S.H. MALAYBALAY CITY BYPASS ROAD (KALASUNGAY SECTION), BRGY. KALASUNGAY, MALAYBALAY CITY, BUKIDNONMALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.068 |
| 206 | 23KM0025CONSTRUCTION OF CONCRETE ROAD ALONG ILIGAN CITY CIRCUMFERENTIAL ROAD (C3), PHASE II, PACKAGE 4, LANAO DEL NORTE | Region X | Iligan City DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.086 |
| 207 | 23KM0001PREVENTIVE MAINTENANCE ALONG MISAMIS ORIENTAL-MA CRISTINA BDRY. ROAD - K1515 + 000 - K1516 + 635 | Region X | Iligan City DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.093 |
| 208 | 23LD0087REHABILITATION OF MULTI-PURPOSE BUILDING(EXECUTIVE BUILDING-PROVINCIAL CAPITOL), BRGY. MATTI, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱14.9M | 100% | Medium risk48 | —-0.089 |
| 209 | 20LD0006CONSTRUCTION OF CONCRETE ROAD-BRGY. POBLACION-BRGY. DALAWINON CONNECTING TO BRGY. KASUGA IN SUPPORT OF MEAT PROCESSING, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱34.3M | 100% | Medium risk48 | —-0.090 |
| 210 | 21LD0082ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS - COTABATO SECT) - K1566+000 - K1566+740, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱36.2M | 77% | Medium risk48 | —-0.019 |
| 211 | 20DQ0093LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF BRIDGE CROSSING IMUS RIVER, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Terminated | ₱27M | 100% | Medium risk47 | —-0.029 |
| 212 | 23KA0156CONSTRUCTION OF WATER SYSTEM - LEVEL III (PHASE 1), BRGY. IMBAYAO, MALAYBALAY CITY, BUKIDNON,BRGY. IMBAYAO, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱49.5M | 100% | Medium risk47 | —-0.047 |
| 213 | 22DQ0089CONSTRUCTION (COMPLETION) OF BRIDGE CROSSING IMUS RIVER, BACOOR CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.061 |
| 214 | 23LD0064ROAD WIDENING- DAVAO- COTABATO RD(DAVAO CITY-JCT DIGOS SECT)-K1537+761-K1538+002, K1538+002-K1538+028, K1538+028- K1538+294, K1538+924-K1538+952, K1538+960-K1538+966, K1538+975- K1539+011, K1539+042- K1538+087, K1539+240-K1539+256, K1539+274-K1539+381, | Region XI | Davao del Sur DEO | Completed | ₱30.9M | 100% | Medium risk47 | —-0.091 |
| 215 | 22KA0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE @ BRGY. KALAGANGANSTA. 0+200 - STA. 0+500 (RS) AND STA 0+400 - STA.0+600 (LS)SAN FERNANDO, BUKIDNONBRGY. KALAGANGAN,SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.076 |
| 216 | 23KE0046CONSTRUCTION OF BALBAGON SEAWALL INCLUDING WAVE BREAKER,MAMBAJAO,CAMIGUIN | Region X | Camiguin DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.073 |
| 217 | 23KE0051CONSTRUCTION OF BENONI SEAWALL INCLUDING WAVE BREAKER,MAHINOG,CAMIGUIN | Region X | Camiguin DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.072 |
| 218 | 17K00172CONST. OF BY PASSES/DIVERSION ROADS,CLAVERIA-BALINGOAN BY-PASS RD INCL. ROW,PACKAGE 2,MIS.OR 2ND LD | Region X | Region X | Completed | ₱99M | 100% | Medium risk47 | —-0.054 |
| 219 | 20KA0063WIDENING OF BRIDGE - MAMPILO BR. (B01649MN) ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.055 |
| 220 | 23K00053CONSTRUCTION OF DRAINAGE SYSTEM, ILIGAN CITY, PACKAGE 2, LANAO DEL NORTE | Region X | Region X | On-Going | ₱47.3M | 90% | Medium risk47 | —-0.029 |
| 221 | 23KK0150CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GINGOOG DORMITORY), BARANGAY 26, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱39.6M | 100% | Medium risk47 | —-0.088 |
| 222 | 22KE0004CONSTRUCTION OF RIVER CONTROL ALONG TIMAYOG BRIDGE II | Region X | Camiguin DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.080 |
| 223 | 23LD0003CONSTRUCTION OF CONCRETE ROAD-BRGY. POBLACION-BRGY. DALAWINON CONNECTING TO BRGY. KASUGA IN SUPPORT OF MEAT PROCESSING, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.090 |
| 224 | 22LD0025ROAD WIDENING - ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) (S00163MN) - K1578+107 - K1578+482, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.091 |
| 225 | 25DQ0095CONSTRUCTION OF ROAD NETWORK FROM HOSTEL TO ACADEMICS BUILDING, PNPA, CAMP GENERAL MARIANO N. CASTAÑEDA, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱20.8M | 57% | Medium risk47 | —-0.063 |