Opening the dossier…
Opening the dossier…
Contractor dossier
35 projects on file, including joint ventures this contractor is part of.
Total projects
35
Total budget
₱772.7M
Average progress
98.6%
Completion rate
77.1%
Average risk score
53.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 34 | ₱764.3M | 52.5 | 0 | 98.9% |
| Region IV-B | 1 | ₱8.5M | 91.7 | 0 | 87.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 10 | ₱88.9M | 45.0 | 0 | 99.5% |
| Bridges | 8 | ₱106.8M | 43.8 | 0 | 100.0% |
| Roads | 7 | ₱255.5M | 50.0 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱64.4M | 94.7 | 0 | 97.8% |
| Water Provision and Storage | 3 | ₱68.6M | 48.4 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱165.5M | 58.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱8.5M | 91.7 | 0 | 87.4% |
| GAA 2025 OO-2 | 1 | ₱14.6M | 87.9 | 0 | 75.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BARANGAY CASTAÑAS AND BARANGAY LIMBON, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱28.5M | 100% | High risk95 | —-0.010 |
| 25DJ0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BARANGAY BULAKIN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱28.5M | 100% | High risk95 | —-0.010 |
| 25DJ0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NIING, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 93% | High risk94 | —-0.003 |
| 25EA0006ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROAD-MARINDUQUE CIRCUMFERENTIAL RD - K0015+888-K0015+929 | Region IV-B | Marinduque DEO | On-Going | ₱8.5M | 87% | High risk92 | —-0.006 |
| 25DJ0002OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT MAABO DAM, DUMACAA RIS, LUCENA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.6M | 76% | High risk88 | —-0.028 |
| 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22DM0101SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD ALONG LATANGAN - BUENAVISTA, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DJ0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BARANGAY CASTAÑAS AND BARANGAY LIMBON, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱28.5M | 100% | High risk95 | —-0.010 |
| 2 | 25DJ0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BARANGAY BULAKIN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱28.5M | 100% | High risk95 | —-0.010 |
| 3 | 25DJ0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NIING, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 93% | High risk94 | —-0.003 |
| 4 | 25EA0006ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROAD-MARINDUQUE CIRCUMFERENTIAL RD - K0015+888-K0015+929 | Region IV-B | Marinduque DEO | On-Going | ₱8.5M | 87% | High risk92 | —-0.006 |
| 5 | 25DJ0002OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT MAABO DAM, DUMACAA RIS, LUCENA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.6M | 76% | High risk88 | —-0.028 |
| 6 | 23DJ0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 8), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 7 | 22DM0101SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD ALONG LATANGAN - BUENAVISTA, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
| 8 | 22DM0103CONSTRUCTION OF ROAD ALONG PATABOG - ILAYANG YUNI, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.085 |
| 9 | 22DM0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER (STA. 3+625 - STA. 4+000), CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱69M | 100% | Medium risk53 | —-0.077 |
| 10 | 23DM0074CONSTRUCTION OF PUBLIC WATER SUPPLY SYSTEM LEVEL III, (POBLACION), MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk51 | —-0.067 |
| 11 | 25DJ0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN JOSE, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 96% | Medium risk49 | —-0.068 |
| 12 | 25DJ0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULIHAN, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 99% | Medium risk49 | —-0.072 |
| 13 | 23DM0090CONSTRUCTION OF MULTI-PURPOSE FACILITY AT PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱13.9M | 100% | Medium risk48 | —-0.103 |
| 14 | 23DM0091CONSTRUCTION OF MULTI-PURPOSE FACILITY AT AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱13.9M | 100% | Medium risk48 | —-0.101 |
| 15 | 23DM0111CONSTRUCTION OF MACALELON WATER SYSTEM LEVEL III PHASE 2, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.061 |
| 16 | 23DJ0007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE-WIDENING OF PERMANENT BRIDGES-DUMUKLONG BR. (B03071LZ) ALONG LUCENA-DALAHICAN PORT RD | Region IV-A | Quezon 2nd DEO | Completed | ₱29M | 100% | Medium risk48 | —-0.055 |
| 17 | 22DJ0040OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (BRIONES BRIDGE), QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.068 |
| 18 | 23DJ0005OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-WIDENING OF PERMANENT BRIDGES, LALIG BR. (B03081LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 2nd DEO | On-Going | ₱18M | 100% | Medium risk47 | —-0.023 |
| 19 | 22DJ0034OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, STO. CRISTO BR. (B03087LZ) ALONG DAANG MAHARLIKA (LZ) SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.067 |
| 20 | 23DJ0055OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, QUIAPO BR. (B03086LZ) ALONG DAANG MAHARLIKA (LZ) CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱7.8M | 100% | Medium risk47 | —-0.066 |
| 21 | 23DJ0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY CONCEPCION BANAHAW, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.107 |
| 22 | 22DJ0032OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MAMALA BR. (B03092LZ) ALONG DAANG MAHARLIKA (LZ) SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.067 |
| 23 | 23DM0107CONSTRUCTION OF PUBLIC WATER SUPPLY SYSTEM LEVEL III, BARANGAY POBLACION, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.065 |
| 24 | 23DJ0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRIDGE, BARANGAY MAMALA 2, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.068 |
| 25 | 23DJ0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION 3, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.106 |