Contractor dossier
79 projects on file, including joint ventures this contractor is part of.
Total projects
79
Total budget
₱4.9B
Average progress
88.9%
Completion rate
72.2%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
5
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 79 | ₱4.9B | 54.0 | 5 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 30 | ₱1.9B | 53.1 | 0 | 94.0% |
| Roads | 25 | ₱1.3B | 48.8 | 2 | 86.7% |
| Buildings and Facilities | 20 | ₱1.3B | 55.1 | 1 | 84.8% |
| GAA 2025 OO-2 | 2 | ₱216.9M | 93.5 | 0 | 91.4% |
| OTHER | 2 | ₱145.4M | 81.9 | 2 | 79.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ID0048CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG HIBUGA RIVER BASIN(DOWNSTREAM),BARANGAY STA. ANA, LA PAZ,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱96.4M | 93% | High risk94 | —-0.007 |
| 25I00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), BARANGAY SANTOL, SAN MIGUEL, LEYTE | Region VIII | Region VIII | On-Going | ₱120.4M | 90% | High risk93 | —-0.006 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IC0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MAINIT - SAN MIGUEL - SANTOL ROAD, K0943+677 - K0944+077, K0944+097 - K0945+000, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49M | 66% | High risk81 | Flagged0.015 |
| 23I00129BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF FOUR (4) STOREY BUILDING WITH ROOF DECK FOR THE PROFESSIONAL REGULATION COMMISSION (PRC) REGIONAL OFFICE VIII - TACLOBAN IN GOVERNMENT CENTER, BRGY. CAND | Region VIII | Region VIII | On-Going | ₱328.9M | 0% | High risk69 | Flagged0.025 |
| 25IM0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 50% | High risk68 | —-0.012 |
| 24IM0003CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGBAO RIVER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 75% | High risk68 | —-0.011 |
| 22I00107CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱123.3M | 93% | High risk67 | —-0.021 |
| 17I00055CONSTRUCTION OF EVACUATION CENTER, CATBALOGAN, SAMAR | Region VIII | Region VIII | Completed | ₱31.5M | 100% | High risk66 | —-0.065 |
| 24IC0107CONSTRUCTION OF TANAUAN BY-PASS ROAD, LEYTE BRGY. CAMIRE, TANAUAN TO BRGY. CABARASAN GUTI, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 51% | High risk65 | —-0.023 |
| 23IC0117CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TANAUAN BYPASS ROAD, BRGY. MARIBI, BRGY. CABALAGNAN, BRGY. BARAS, AND BRGY. CAMIRE, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 73% | High risk65 | —-0.024 |
| 24I00402SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF TOLOSA - DULAG BY-PASS ROAD, LEYTE | Region VIII | Region VIII | On-Going | ₱144.7M | 0% | High risk65 | —-0.012 |
| 23IM0104CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 50% | High risk65 | Flagged0.028 |
| 23IC0118CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TOLOSA - SAN VICTOR - TABONTABON ROAD, BRGY. SAN VICTOR, BRGY. ADA, BRGY. CABONGA-AN AND BRGY. CANBALISARA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 53% | High risk65 | —-0.018 |
| 23IM0102OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 44% | High risk65 | Flagged0.030 |
| 24IC0115CONSTRUCTION OF MULTI-PURPOSE BUILDING (DANIEL Z. ROMUALDEZ MEMORIAL AUDITORIUM), TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱99M | 61% | High risk65 | —-0.028 |
| 20IC0039CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-CONST. OF FLOOD STRUCTURE AND DRAINAGE, BRGY. CAMPETIC AND PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱95.1M | 100% | High risk64 | —-0.067 |
| 23IM0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, CAMANSIHAY, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱96.1M | 100% | High risk64 | —-0.069 |
| 24IC0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (UPSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.9M | 73% | High risk63 | —-0.015 |
| 24IC0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (DOWNSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱97M | 85% | High risk63 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23IM0102OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 44% | High risk65 | Flagged0.030 |
| 23IM0104CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 50% | High risk65 | Flagged0.028 |
| 23I00129BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF FOUR (4) STOREY BUILDING WITH ROOF DECK FOR THE PROFESSIONAL REGULATION COMMISSION (PRC) REGIONAL OFFICE VIII - TACLOBAN IN GOVERNMENT CENTER, BRGY. CAND | Region VIII | Region VIII | On-Going | ₱328.9M | 0% | High risk69 | Flagged0.025 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IC0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MAINIT - SAN MIGUEL - SANTOL ROAD, K0943+677 - K0944+077, K0944+097 - K0945+000, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49M | 66% | High risk81 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25ID0048CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG HIBUGA RIVER BASIN(DOWNSTREAM),BARANGAY STA. ANA, LA PAZ,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱96.4M | 93% | High risk94 | —-0.007 |
| 2 | 25I00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), BARANGAY SANTOL, SAN MIGUEL, LEYTE | Region VIII | Region VIII | On-Going | ₱120.4M | 90% | High risk93 | —-0.006 |
| 3 | 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 4 | 24IC0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MAINIT - SAN MIGUEL - SANTOL ROAD, K0943+677 - K0944+077, K0944+097 - K0945+000, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49M | 66% | High risk81 | Flagged0.015 |
| 5 | 23I00129BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF FOUR (4) STOREY BUILDING WITH ROOF DECK FOR THE PROFESSIONAL REGULATION COMMISSION (PRC) REGIONAL OFFICE VIII - TACLOBAN IN GOVERNMENT CENTER, BRGY. CAND | Region VIII | Region VIII | On-Going | ₱328.9M | 0% | High risk69 | Flagged0.025 |
| 6 | 25IM0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 50% | High risk68 | —-0.012 |
| 7 | 24IM0003CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGBAO RIVER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 75% | High risk68 | —-0.011 |
| 8 | 22I00107CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱123.3M | 93% | High risk67 | —-0.021 |
| 9 | 17I00055CONSTRUCTION OF EVACUATION CENTER, CATBALOGAN, SAMAR | Region VIII | Region VIII | Completed | ₱31.5M | 100% | High risk66 | —-0.065 |
| 10 | 24IC0107CONSTRUCTION OF TANAUAN BY-PASS ROAD, LEYTE BRGY. CAMIRE, TANAUAN TO BRGY. CABARASAN GUTI, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 51% | High risk65 | —-0.023 |
| 11 | 23IC0117CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TANAUAN BYPASS ROAD, BRGY. MARIBI, BRGY. CABALAGNAN, BRGY. BARAS, AND BRGY. CAMIRE, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 73% | High risk65 | —-0.024 |
| 12 | 24I00402SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF TOLOSA - DULAG BY-PASS ROAD, LEYTE | Region VIII | Region VIII | On-Going | ₱144.7M | 0% | High risk65 | —-0.012 |
| 13 | 23IM0104CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 50% | High risk65 | Flagged0.028 |
| 14 | 23IC0118CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TOLOSA - SAN VICTOR - TABONTABON ROAD, BRGY. SAN VICTOR, BRGY. ADA, BRGY. CABONGA-AN AND BRGY. CANBALISARA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 53% | High risk65 | —-0.018 |
| 15 | 23IM0102OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 44% | High risk65 | Flagged0.030 |
| 16 | 24IC0115CONSTRUCTION OF MULTI-PURPOSE BUILDING (DANIEL Z. ROMUALDEZ MEMORIAL AUDITORIUM), TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱99M | 61% | High risk65 | —-0.028 |
| 17 | 20IC0039CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-CONST. OF FLOOD STRUCTURE AND DRAINAGE, BRGY. CAMPETIC AND PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱95.1M | 100% | High risk64 | —-0.067 |
| 18 | 23IM0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, CAMANSIHAY, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱96.1M | 100% | High risk64 | —-0.069 |
| 19 | 24IC0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (UPSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.9M | 73% | High risk63 | —-0.015 |
| 20 | 24IC0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (DOWNSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱97M | 85% | High risk63 | —-0.022 |
| 21 | 24IM0101CONSTRUCTION OF DFCIC BUILDING, NBI EASTERN VISAYAS REGIONAL OFFICE, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱85.9M | 45% | High risk63 | —-0.026 |
| 22 | 24IM0126CONSTRUCTION (COMPLETION) OF DENR OFFICE BUILDING, STO. NINO EXT, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱73.6M | 40% | High risk63 | —-0.028 |
| 23 | 24IC0081CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.070 |
| 24 | 23IC0112FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL ALONG LIBTONG BRIDGE (DOWNSTREAM), BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.070 |
| 25 | 23I00006CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. CAHUMAYHUMAYAN, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱106.1M | 100% | High risk63 | —-0.066 |