Contractor dossier
96 projects on file, including joint ventures this contractor is part of.
Total projects
96
Total budget
₱6.3B
Average progress
87.5%
Completion rate
71.9%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
9
9.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 83 | ₱5.1B | 54.2 | 7 | 87.7% |
| Region IV-B | 11 | ₱1.1B | 58.6 | 2 | 89.5% |
| Region IV-A | 1 | ₱29.8M | 67.1 | 0 | 59.3% |
| Region VI | 1 | ₱56.3M | 53.1 | 0 | 80.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 51 | ₱3.7B | 55.3 | 3 | 91.8% |
| Roads | 22 | ₱1.1B | 51.6 | 0 | 90.5% |
| Buildings and Facilities | 13 | ₱969.2M | 56.2 | 0 | 55.8% |
| OTHER | 8 | ₱384.8M | 61.2 | 6 | 100.0% |
| Bridges | 2 | ₱78.4M | 46.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00046CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱138.1M | 60% | High risk78 | Flagged0.013 |
| 25E00045CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱138M | 59% | High risk78 | Flagged0.013 |
| 24OE0206CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXVI), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱96.5M | 62% | High risk73 | Flagged0.040 |
| 23OE0205RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - R-10 BRIDGE 2 PARALLEL (B05045LZ) (NORTH BOUND) ALONG R-10, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.4M | 100% | High risk68 | Flagged0.015 |
| 25OH0031ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 7 | National Capital Region | South Manila DEO | On-Going | ₱142.9M | 88% | High risk67 | —-0.034 |
| 25OH0029ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE, PHASE 5, BASECO COMPOUND, PORT AREA, MANILA | National Capital Region | South Manila DEO | On-Going | ₱143M | 81% | High risk67 | —-0.034 |
| 25OH0030ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 6 | National Capital Region | South Manila DEO | On-Going | ₱143.1M | 93% | High risk67 | —-0.035 |
| 25DF0011ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM CONST / UPGRADING / REHAB OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0044 + 280 - K0046+120 | Region IV-A | Cavite 1st DEO | On-Going | ₱29.8M | 59% | High risk67 | —-0.034 |
| 25OE0025REHABILITATION OF ESTEROS WITHIN ZONE 1 TO 67, PHASE 2, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.8M | 79% | High risk65 | —-0.044 |
| 25OE0022RETROFITTING OF SCHOOL BUILDING AT G. SANTIAGO ELEMENTARY SCHOOL, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.8M | 92% | High risk65 | —-0.041 |
| 25OH0058ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS / FLOOD MANAGEMENT PROGRAM / CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS/ CONST. OF SLOPE PROTECTION STRUCTURE,PHASE 4, BASECO COMPOUND, PORT AREA,MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95M | 79% | High risk65 | —-0.044 |
| 24OE0039INSTALLATION OF BOOSTER PUMP IN CM RECTO AVE., (PHASE II), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.4M | 100% | High risk65 | —-0.075 |
| 25OE0175CONSTRUCTION OF RETARDING BASIN AT ESTERO DE BINONDO (PHASE IV), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱93.8M | 43% | High risk65 | —-0.036 |
| 25OE0021RETROFITTING OF MULTI-PURPOSE BUILDING, ISABELO DELOS REYES ELEMENTARY SCHOOL, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱145.8M | 55% | High risk65 | —-0.027 |
| 25OE0145CONSTRUCTION OF MULTI-PURPOSE BUILDING, SENTRO KOMUNIUDAD DE SANTA CRUZ, MANILA (PHASE 1) | National Capital Region | North Manila DEO | On-Going | ₱145.5M | 50% | High risk65 | —-0.028 |
| 25OE0184RETROFFITING OF SCHOOL BUILDING AT LEGARDA ELEMENTARY SCHOOL, MANILA | National Capital Region | North Manila DEO | On-Going | ₱145.7M | 6% | High risk64 | —-0.011 |
| 24OE0038INSTALLATION OF BOOSTER PUMP IN CM RECTO AVE., (PHASE I), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.075 |
| 24OE0040CONSTRUCTION OF TAYUMAN PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 24OE0230REHABILITATION OF ROAD ALONG P. NOVAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.2M | 100% | High risk63 | Flagged0.014 |
| 24OE0222REHABILITATION OF ROAD ALONG REYES ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.2M | 100% | High risk63 | Flagged0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OE0206CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXVI), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱96.5M | 62% | High risk73 | Flagged0.040 |
| 23OE0205RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - R-10 BRIDGE 2 PARALLEL (B05045LZ) (NORTH BOUND) ALONG R-10, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.4M | 100% | High risk68 | Flagged0.015 |
| 24OE0227REHABILITATION OF ROAD WITH DRAINAGE ALONG N. ZAMORA ST., TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.2M | 100% | High risk62 | Flagged0.014 |
| 24OE0230REHABILITATION OF ROAD ALONG P. NOVAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.2M | 100% | High risk63 | Flagged0.014 |
| 24OE0222REHABILITATION OF ROAD ALONG REYES ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.2M | 100% | High risk63 | Flagged0.014 |
| 25E00046CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱138.1M | 60% | High risk78 | Flagged0.013 |
| 25E00045CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱138M | 59% | High risk78 | Flagged0.013 |
| 24OE0183CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, SAMPALOC, MANILA | National Capital Region | North Manila DEO | Completed | ₱39.8M | 100% | High risk60 | Flagged0.008 |
| 24OE0185CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN LAKANDULA HIGH SCHOOL, BARANGAY 163, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱39.8M | 100% | High risk61 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23OH0009ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ROXAS BLVD-K0005+150-K0004+675 | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.086 |
| 27 | 24OE0183CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, SAMPALOC, MANILA | National Capital Region | North Manila DEO | Completed | ₱39.8M | 100% | High risk60 | Flagged0.008 |
| 28 | 24OE0023RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - RODRIGUEZ BR. (B01793LZ) ALONG RODRIGUEZ ST | National Capital Region | North Manila DEO | Completed | ₱48.9M | 100% | High risk60 | —-0.039 |
| 29 | 23OE0207INSTALLATION OF BOOSTER PUMP AT SEVERINO DRAINAGE MAIN AT ESTERO DE QUIAPO (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.3M | 100% | Medium risk59 | —-0.025 |
| 30 | 23OE0206INSTALLATION OF BOOSTER PUMP AT SEVERINO DRAINAGE MAIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.2M | 100% | Medium risk59 | —-0.025 |
| 31 | 23EB0087CONSTRUCTION OF DEBRIS FLOW BARRIER ALONG MINDORO WEST COASTAL ROAD (S00095MR), SITIO TURAWAN, BARANGAY SAN FRANCISCO, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱99M | 100% | Medium risk59 | —-0.060 |
| 32 | 23EB0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUMINTAO RIVER FROM BORICOTCOT TO SITIO MARILAO, NEW DAGUPAN, STA. 0+000 - STA. 0+946 CALINTAAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.061 |
| 33 | 23E00034SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVER CONTROL STRUCTURE ALONG NAGAPI RIVER (RS), SITIO BALANGABONG-SITIO SAYCOHAN SECT., CALINTAAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk58 | —-0.061 |
| 34 | 23E00033SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVER CONTROL STRUCTURE ALONG NAGAPI RIVER (LS),SITIO BALANGABONG-SITIO SAYCOHAN SECT., CALINTAAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk58 | —-0.061 |
| 35 | 25OE0116CONSTRUCTION OF MULTI-PURPOSE BUILDING ZONE 25-40, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱73.5M | 8% | Medium risk58 | —-0.029 |
| 36 | 23OE0203INSTALLATION OF BOOSTER PUMP AT ESTERO DE SAMPALOC PHASE II, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱47.8M | 100% | Medium risk57 | —-0.026 |
| 37 | 24OH0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY 737 ZONE 80, MALATE, MANILA | National Capital Region | South Manila DEO | On-Going | ₱48.5M | 31% | Medium risk55 | —-0.035 |
| 38 | 24OE0021CONSTRUCTION OF RETENTION BASIN ALONG ESTERO DE SAMPALOC PHASE VII, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱90.3M | 100% | Medium risk55 | —-0.078 |
| 39 | 23E00136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, UDALO SECTION (PHASE 1), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 40 | 23E00137SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, UDALO SECTION (PHASE 2), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 41 | 25GD0003CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, TALASA RIVER CONTROL, BRGY, TALASA, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱56.3M | 80% | Medium risk53 | —-0.031 |
| 42 | 24OH0039OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT. PROGRAM-CONST./MAINT.OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST.OF DRAINAGE SYSTEM ALONG LIBERTAD MAIN (FROM ROXAS BLVD. TO TAFT AVE. PASAY CITY,STA.0+161 TO STA.0+322),PHASE 4 | National Capital Region | South Manila DEO | Completed | ₱89.1M | 100% | Medium risk53 | —-0.080 |
| 43 | 23OE0039INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.2M | 100% | Medium risk53 | —-0.084 |
| 44 | 24OE0181INSTALLATION OF BOOSTER PUMP AT P. CASAL BRIDGE (PHASE III) AT ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱76.1M | 100% | Medium risk53 | —-0.086 |
| 45 | 21OE0011INSTALLATION OF BOOSTER PUMP INCLUDING RETARDING BASIN AT ESTERO DE KABULUSAN, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱80.5M | 100% | Medium risk53 | —-0.082 |
| 46 | 23OE0192INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE XIV, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱71.7M | 100% | Medium risk53 | —-0.084 |
| 47 | 23OE0196INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE XIII, DISTRICT 1, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.084 |
| 48 | 23OE0032INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱70.5M | 100% | Medium risk53 | —-0.086 |
| 49 | 23OE0028INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO PHASE II, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.3M | 100% | Medium risk53 | —-0.086 |
| 50 | 23OE0003INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO PHASE I, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱71.9M | 100% | Medium risk53 | —-0.086 |