Opening the dossier…
Opening the dossier…
Contractor dossier
290 projects on file, including joint ventures this contractor is part of.
Total projects
290
Total budget
₱8.7B
Average progress
97.8%
Completion rate
87.6%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
3
1.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 274 | ₱8.4B | 48.5 | 3 | 97.7% |
| Region I | 16 | ₱303.8M | 50.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 110 | ₱4.5B | 47.4 | 0 | 97.3% |
| Bridges | 88 | ₱2.2B | 48.4 | 0 | 98.9% |
| Buildings and Facilities | 49 | ₱273.5M | 38.6 | 0 | 100.0% |
| Flood Control and Drainage | 21 | ₱745.2M | 47.7 | 0 | 99.2% |
| GAA 2025 OO-1 | 6 | ₱271.2M | 93.4 | 1 | 75.7% |
| OTHER | 6 | ₱356.5M | 75.2 | 0 | 99.4% |
| GAA 2025 SSP | 5 | ₱107.6M | 91.6 | 2 | 90.3% |
| Water Provision and Storage | 3 | ₱12.2M | 31.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.2 | 0 | 78.3% |
| Bridges, Roads | 1 | ₱193M | 67.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
| 25DM0014ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326 + 930 - K0327 + 000, K0327 + 500 -K0327 + 800, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱72M | 88% | High risk95 | —-0.006 |
| 25DM0016ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0324+300 - K0324+355, K0326+082 - K0326+194, K0326+319 - K0326+446, K0340+407 - K0340 | Region IV-A | Quezon 3rd DEO | On-Going | ₱63.6M | 90% | High risk95 | —-0.009 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0004ASSET PRESERVATION PROGRAM - REHABILITATION /RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326+656 - K0326+858, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱45.6M | 90% | High risk93 | —-0.012 |
| 25DL0011ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, UMIIK BR. (B02596LZ) ALONG QUIRINO H-WAY | Region IV-A | Quezon 4th DEO | On-Going | ₱22.8M | 60% | High risk92 | —-0.002 |
| 25DL0024ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 98% | High risk92 | —-0.015 |
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DM0058CONSTRUCTION OF ROAD, RIZAL - VILLA MAGSAYSAY, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱14.6M | 100% | High risk91 | —-0.032 |
| 25DM0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER, PACKAGE B, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱47.8M | 78% | High risk90 | —-0.027 |
| 25DM0029CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BATABAT NORTE, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 25DM0020CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIGAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 22DL0175ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD, ATIMONAN SECTION, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱96.5M | 100% | High risk77 | —-0.029 |
| 25DL0012ACCESS ROADS IN SUPPORT OF COCONUT PROCESSING, COFFEE AND OTHER AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.7M | 96% | High risk75 | —-0.014 |
| 17DL0080A. MFO 1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. SECONDARY ROADS B. MSR JCT. LOPEZ-HONDAGUA PORT RD - K0221+-678 - K0221+-078, K0221+000 - K0221 | Region IV-A | Quezon 4th DEO | Completed | ₱53.5M | 100% | High risk75 | —-0.040 |
| 19DL0123A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 4. GUMACA BY-PASS ROAD, (PHASE III), QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.039 |
| 22DL0184ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 2. PAGBILAO BY-PASS ROAD, OVERHEAD BRIDGE AND APPROACHES, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.036 |
| 18DL0190A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD (ATIMONAN SECTION), INCL. ROW QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱78.7M | 100% | High risk75 | —-0.034 |
| 16DK0116ASSET PRESERVATION OF NAT'L ROADS, CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT'L ROADS FAMY-REAL-INF | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.070 |
| 20A00011RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAMUCALAO BRIDGE 2 (B00525LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱14.5M | 100% | High risk69 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19D00025FY 2019 DPWH INFRASTRUCTURE PROGRAMLOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REPLACEMENT OF LAVIDES BRIDGE AND APPROACHES, ATIMONAN | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk68 | —-0.036 |
| 27 | 20DL0036C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 14. HIMBUBULO ESTE DANCALAN CENTRAL COASTAL ECOTOURISM ROAD LEADING TO PRISTINE BEACHES, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.068 |
| 28 | 17DL0067A. MFO-1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS C. REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 3. TERTIARY ROADS B. QUEZON-ALABAT-PEREZ RD - K0042+500 - K0042+700 | Region IV-A | Quezon 4th DEO | Completed | ₱18.8M | 100% | High risk66 | —-0.072 |
| 29 | 19D00031FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS ATIMONAN-MAUBAN ROAD, MAUBAN SECTION, PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱139.9M | 100% | High risk66 | —-0.029 |
| 30 | 22A00050CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS), CONSTRUCTION OF BARRACKS AT CAMP JOSE M LABERINTO, NAGUILLAN, LA UNION | Region I | Region I | Completed | ₱19.3M | 100% | High risk66 | —-0.053 |
| 31 | 17DL0094A. MFO 1 - NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT C. CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW 1. ATIMONAN-MAUBAN ROAD, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱30.2M | 100% | High risk65 | —-0.072 |
| 32 | 18D00044ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ROAD WIDENING/PRIMARY ROADS, DAANG MAHARLIKA (LZ), K0148+482.00-K0149+300.32, K0149+326.26-K0151+549.50, QUEZON | Region IV-A | Region IV-A | Completed | ₱140.4M | 100% | High risk65 | —-0.067 |
| 33 | 18D00049ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING/PRIMARY ROADS, DAANG MAHARLIKA (LZ), K0164+561.00-K0165+512.13, K0165+521.31-K0167+498.10, QUEZON | Region IV-A | Region IV-A | Completed | ₱140.3M | 100% | High risk65 | —-0.070 |
| 34 | 23D00152CONSTRUCTION OF BYPASS ROAD LIPA-PADRE GARCIA BATANGAS - PACKAGE N | Region IV-A | Region IV-A | On-Going | ₱140.4M | 65% | High risk65 | —-0.037 |
| 35 | 17DL0082A. MFO -1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS C. REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE 1. PRIMARY ROADS A. DAANG MAHARLIKA (LZ) - K0161+670 - K0161+690, K0174+000 - K0 | Region IV-A | Quezon 4th DEO | Completed | ₱42.3M | 100% | High risk65 | —-0.072 |
| 36 | 21D00074ENSURE AND SAFE RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS MARILAG - AGOHO ROAD, CALAUAG, QUEZON, PACKAGE A | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk65 | —-0.079 |
| 37 | 24D00151CONSTRUCTION OF WATERWAY ALONG TACUMBRO CREEKS, SEGMENT NO 1, BARANGAY 10, CATANAUAN, QUEZON | Region IV-A | Region IV-A | On-Going | ₱95.5M | 84% | High risk65 | —-0.036 |
| 38 | 17DL0089A. MFO - 1: NATIONAL ROAD NETWORK SERVICES 2. NETWORK DEVELOPMENT C. CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INLCUDING ROW 2. CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱41.5M | 100% | High risk65 | —-0.073 |
| 39 | 18D00009FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM NETWORK DEV'T. CONST. OF BY-PASS & DIVERSION ROADS STAR TOLLWAY-PINAMUCAN BY-PASS ROAD, PACKAGE A, INCL. ROW, BATANGAS | Region IV-A | Region IV-A | Completed | ₱138.1M | 100% | High risk64 | —-0.072 |
| 40 | 18D00005ROAD WIDENING / PRIMARY ROADS MANILA BATANGAS RD | Region IV-A | Region IV-A | Completed | ₱137.7M | 100% | High risk64 | —-0.084 |
| 41 | 19DL0126A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM B. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 1. PAGBILAO BY-PASS ROAD, BRIDGE III (COMPLETION), BRIDGE II (CONSTRUCTION) | Region IV-A | Quezon 4th DEO | Completed | ₱92.1M | 100% | High risk62 | —-0.053 |
| 42 | 18D00003ROAD WIDENING / PRIMARY ROADS DAANG MAHARLIKA (LZ) | Region IV-A | Region IV-A | Completed | ₱127.6M | 100% | High risk61 | —-0.075 |
| 43 | 18D00033FY 2018 DPWH INFRA. PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING/SECONDARY ROADS BATANGAS-LOBO ROAD, BATANGAS PROVINCE | Region IV-A | Region IV-A | Completed | ₱123.7M | 100% | High risk61 | —-0.088 |
| 44 | 22DL0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.094 |
| 45 | 23DL0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES 13. CONSTRUCTION OF ROAD, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱106.2M | 100% | High risk60 | —-0.091 |
| 46 | 24DL0143CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), 14. CONSTRUCTION OF ACCESS ROADS IN SU | Region IV-A | Quezon 4th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.093 |
| 47 | 22D00054FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/ NEW ROADS MARILAG - AGOHO ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱93M | 100% | High risk60 | —-0.086 |
| 48 | 22D00048FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS / NEW ROADSATIMONAN - MAUBAN ROAD, MAUBAN SECTION, QUEZON | Region IV-A | Region IV-A | Completed | ₱93M | 100% | Medium risk60 | —-0.091 |
| 49 | 21DK0119CONCRETING OF INFANTA BY-PASS ROAD, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.096 |
| 50 | 18DL0049A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM B. WIDENING OF PERMANENT BRIDGES 2. MALIGAYA BR. (B02568LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱59.4M | 100% | Medium risk56 | —-0.059 |