Contractor dossier
290 projects on file, including joint ventures this contractor is part of.
Total projects
290
Total budget
₱8.7B
Average progress
97.8%
Completion rate
87.6%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
3
1.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 274 | ₱8.4B | 48.5 | 3 | 97.7% |
| Region I | 16 | ₱303.8M | 50.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 110 | ₱4.5B | 47.4 | 0 | 97.3% |
| Bridges | 88 | ₱2.2B | 48.4 | 0 | 98.9% |
| Buildings and Facilities | 49 | ₱273.5M | 38.6 | 0 | 100.0% |
| Flood Control and Drainage | 21 | ₱745.2M | 47.7 | 0 | 99.2% |
| GAA 2025 OO-1 | 6 | ₱271.2M | 93.4 | 1 | 75.7% |
| OTHER | 6 | ₱356.5M | 75.2 | 0 | 99.4% |
| GAA 2025 SSP | 5 | ₱107.6M | 91.6 | 2 | 90.3% |
| Water Provision and Storage | 3 | ₱12.2M | 31.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.2 | 0 | 78.3% |
| Bridges, Roads | 1 | ₱193M | 67.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
| 25DM0014ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326 + 930 - K0327 + 000, K0327 + 500 -K0327 + 800, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱72M | 88% | High risk95 | —-0.006 |
| 25DM0016ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0324+300 - K0324+355, K0326+082 - K0326+194, K0326+319 - K0326+446, K0340+407 - K0340 | Region IV-A | Quezon 3rd DEO | On-Going | ₱63.6M | 90% | High risk95 | —-0.009 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0004ASSET PRESERVATION PROGRAM - REHABILITATION /RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326+656 - K0326+858, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱45.6M | 90% | High risk93 | —-0.012 |
| 25DL0011ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, UMIIK BR. (B02596LZ) ALONG QUIRINO H-WAY | Region IV-A | Quezon 4th DEO | On-Going | ₱22.8M | 60% | High risk92 | —-0.002 |
| 25DL0024ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 98% | High risk92 | —-0.015 |
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DM0058CONSTRUCTION OF ROAD, RIZAL - VILLA MAGSAYSAY, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱14.6M | 100% | High risk91 | —-0.032 |
| 25DM0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER, PACKAGE B, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱47.8M | 78% | High risk90 | —-0.027 |
| 25DM0029CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BATABAT NORTE, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 25DM0020CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIGAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 22DL0175ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD, ATIMONAN SECTION, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱96.5M | 100% | High risk77 | —-0.029 |
| 25DL0012ACCESS ROADS IN SUPPORT OF COCONUT PROCESSING, COFFEE AND OTHER AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.7M | 96% | High risk75 | —-0.014 |
| 17DL0080A. MFO 1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. SECONDARY ROADS B. MSR JCT. LOPEZ-HONDAGUA PORT RD - K0221+-678 - K0221+-078, K0221+000 - K0221 | Region IV-A | Quezon 4th DEO | Completed | ₱53.5M | 100% | High risk75 | —-0.040 |
| 19DL0123A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 4. GUMACA BY-PASS ROAD, (PHASE III), QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.039 |
| 22DL0184ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 2. PAGBILAO BY-PASS ROAD, OVERHEAD BRIDGE AND APPROACHES, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.036 |
| 18DL0190A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD (ATIMONAN SECTION), INCL. ROW QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱78.7M | 100% | High risk75 | —-0.034 |
| 16DK0116ASSET PRESERVATION OF NAT'L ROADS, CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT'L ROADS FAMY-REAL-INF | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.070 |
| 20A00011RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAMUCALAO BRIDGE 2 (B00525LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱14.5M | 100% | High risk69 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20DL0133A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM B. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 1. PAGBILAO BY-PASS ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱28.5M | 100% | Medium risk47 | —-0.065 |
| 127 | 19DL0032A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3.BRIDGE PROGRAM A.RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES 2.IRINGAN BR. (B02562LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.064 |
| 128 | 20DL0228ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 6. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALING RIVER, ATIMONAN, | Region IV-A | Quezon 4th DEO | Completed | ₱46.6M | 100% | Medium risk47 | —-0.086 |
| 129 | 20DL0101A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES KAGUISI BR. 1 (B00037AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱5.8M | 100% | Medium risk47 | —-0.064 |
| 130 | 18DL0211D. LOCAL PROGRAM 1. CONSTRUCTION / REPAIR/ REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS 2. LOCAL BRIDGES 5. REPLACEMENT OF TACONG BRIDGE AND APPROACHES, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱21.9M | 100% | Medium risk47 | —-0.066 |
| 131 | 24DL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 38. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GUITES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.100 |
| 132 | 20DK0062WIDENING OF PERMANENT BRIDGES, AMATIAN BRIDGE (B02423LZ) ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD | Region IV-A | Quezon 1st DEO | Completed | ₱25.5M | 100% | Medium risk47 | —-0.062 |
| 133 | 18DL0210D. LOCAL PROGRAM 1. CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS 2. LOCAL BRIDGES 4. REPLACEMENT OF PAMBILAN BRIDGE AND APPROACHES, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱20.6M | 100% | Medium risk47 | —-0.066 |
| 134 | 22DL0119ORGANIZATIONAL OUTCOME 1: BRIDGE PROGRAM, REPLACEMENT OF PERMANENT WEAK BRIDGES, LUMUTAN BR. (B02571LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱20.6M | 100% | Medium risk47 | —-0.066 |
| 135 | 18DL0048A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM B. WIDENING OF PERMANENT BRIDGES 3. MALICBOY BR. (B02564LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱26.9M | 100% | Medium risk47 | —-0.067 |
| 136 | 21D00047ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT RPOGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TAYABAS BYPASS ROAD, QUEZON | Region IV-A | Region IV-A | Completed | ₱46.1M | 100% | Medium risk47 | —-0.104 |
| 137 | 20DL0121A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM B. WIDENING OF PERMANENT BRIDGES 1. INAGBUHAN BR. (B02574LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱27.7M | 100% | Medium risk47 | —-0.063 |
| 138 | 18DL0001I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 11. TAÑADA BR. (B02577LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱27.5M | 100% | Medium risk47 | —-0.063 |
| 139 | 22DL0137SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. PANIKIHAN-LABNIG-MALABTOG BRIDGE AND APPROACHES, GUMACA, QUEZ | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.065 |
| 140 | 18DL0011I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 4. CAMAGONG BR. (B00009AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱23.6M | 100% | Medium risk47 | —-0.065 |
| 141 | 19DK0023RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE @ NAPO BRIDGE ALONG LUCBAN-LUISIANA ROAD, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.068 |
| 142 | 18DO0051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROEVMENT-TERTIARY ROADS-PILILLAJCT.-JALAJALA RD. KO063+212-KO064+150, KO072+500-KO073+000 | Region IV-A | Rizal 2nd DEO | Completed | ₱38.2M | 100% | Medium risk47 | —-0.107 |
| 143 | 22DL0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF BANTAD BRIDGE AND APPROACHES, GUMACA, QUEZON, PHASEII | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.064 |
| 144 | 18DL0010I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 3. BUENAVISTA BR. (B00006AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱14.2M | 100% | Medium risk47 | —-0.066 |
| 145 | 19DL0031A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A.RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES 1. BINAHAAN BR. (B02563LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱14.3M | 100% | Medium risk47 | —-0.066 |
| 146 | 25DL0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE, BARANGAY | Region IV-A | Quezon 4th DEO | On-Going | ₱9.6M | 92% | Medium risk47 | —-0.035 |
| 147 | 19DL0034A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3.BRIDGE PROGRAM B.RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES 2.CAGALIMANGO BR. (B00032AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱7.2M | 100% | Medium risk47 | —-0.065 |
| 148 | 24DK0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - LUBAYAT BR. (B03412LZ) ALONG MAUBAN-TIGNOAN RD | Region IV-A | Quezon 1st DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.066 |
| 149 | 19DL0158A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT A. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 1. GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱45.1M | 100% | Medium risk47 | —-0.103 |
| 150 | 21DL0157LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES 2. CONSTRUCTION OF LOCAL BRIDGE AND APPROACHES, BARANGAY SALVACION, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱7.4M | 100% | Medium risk47 | —-0.063 |