Contractor dossier
290 projects on file, including joint ventures this contractor is part of.
Total projects
290
Total budget
₱8.7B
Average progress
97.8%
Completion rate
87.6%
Average risk score
48.6
Medium risk on average, out of 100
Flagged as unusual
3
1.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 274 | ₱8.4B | 48.5 | 3 | 97.7% |
| Region I | 16 | ₱303.8M | 50.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 110 | ₱4.5B | 47.4 | 0 | 97.3% |
| Bridges | 88 | ₱2.2B | 48.4 | 0 | 98.9% |
| Buildings and Facilities | 49 | ₱273.5M | 38.6 | 0 | 100.0% |
| Flood Control and Drainage | 21 | ₱745.2M | 47.7 | 0 | 99.2% |
| GAA 2025 OO-1 | 6 | ₱271.2M | 93.4 | 1 | 75.7% |
| OTHER | 6 | ₱356.5M | 75.2 | 0 | 99.4% |
| GAA 2025 SSP | 5 | ₱107.6M | 91.6 | 2 | 90.3% |
| Water Provision and Storage | 3 | ₱12.2M | 31.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 90.2 | 0 | 78.3% |
| Bridges, Roads | 1 | ₱193M | 67.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
| 25DM0014ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326 + 930 - K0327 + 000, K0327 + 500 -K0327 + 800, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱72M | 88% | High risk95 | —-0.006 |
| 25DM0016ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0324+300 - K0324+355, K0326+082 - K0326+194, K0326+319 - K0326+446, K0340+407 - K0340 | Region IV-A | Quezon 3rd DEO | On-Going | ₱63.6M | 90% | High risk95 | —-0.009 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0004ASSET PRESERVATION PROGRAM - REHABILITATION /RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0326+656 - K0326+858, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱45.6M | 90% | High risk93 | —-0.012 |
| 25DL0011ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, UMIIK BR. (B02596LZ) ALONG QUIRINO H-WAY | Region IV-A | Quezon 4th DEO | On-Going | ₱22.8M | 60% | High risk92 | —-0.002 |
| 25DL0024ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 98% | High risk92 | —-0.015 |
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DM0058CONSTRUCTION OF ROAD, RIZAL - VILLA MAGSAYSAY, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱14.6M | 100% | High risk91 | —-0.032 |
| 25DM0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER, PACKAGE B, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱47.8M | 78% | High risk90 | —-0.027 |
| 25DM0029CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BATABAT NORTE, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 25DM0020CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIGAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.3M | 100% | High risk90 | —-0.032 |
| 22DL0175ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD, ATIMONAN SECTION, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱96.5M | 100% | High risk77 | —-0.029 |
| 25DL0012ACCESS ROADS IN SUPPORT OF COCONUT PROCESSING, COFFEE AND OTHER AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱9.7M | 96% | High risk75 | —-0.014 |
| 17DL0080A. MFO 1: NATIONAL ROAD NETWORK SERVICES 1. ASSET PRESERVATION OF NATIONAL ROADS D. CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. SECONDARY ROADS B. MSR JCT. LOPEZ-HONDAGUA PORT RD - K0221+-678 - K0221+-078, K0221+000 - K0221 | Region IV-A | Quezon 4th DEO | Completed | ₱53.5M | 100% | High risk75 | —-0.040 |
| 19DL0123A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM A. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 4. GUMACA BY-PASS ROAD, (PHASE III), QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱45.8M | 100% | High risk75 | —-0.039 |
| 22DL0184ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 2. PAGBILAO BY-PASS ROAD, OVERHEAD BRIDGE AND APPROACHES, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.036 |
| 18DL0190A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 1. ATIMONAN-MAUBAN ROAD (ATIMONAN SECTION), INCL. ROW QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱78.7M | 100% | High risk75 | —-0.034 |
| 16DK0116ASSET PRESERVATION OF NAT'L ROADS, CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT'L ROADS FAMY-REAL-INF | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.070 |
| 20A00011RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAMUCALAO BRIDGE 2 (B00525LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱14.5M | 100% | High risk69 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ISIDRO ILAYA, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱7.3M | 60% | High risk92 | Flagged0.007 |
| 25DL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱38.5M | 29% | High risk93 | Flagged0.003 |
| 25DM0028CONSTRUCTION OF ROAD, SAN ANDRES - SAN FRANCISCO, PACKAGE 1, QUEZON, SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱71.2M | 91% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 21DL0156LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES 1. COMPLETION OF LOCAL BRIDGE AND APPROACHES, BARANGAY PANDANAN-TIKIWAN, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱7.5M | 100% | Medium risk47 | —-0.063 |
| 152 | 19DL0036A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3.BRIDGE PROGRAM B.RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES 5.VILLA HERMOSA BR. (B02554LZ) ALONG MSR JCT-LOPEZ-CATANAUAN RD | Region IV-A | Quezon 4th DEO | Completed | ₱7.1M | 100% | Medium risk47 | —-0.064 |
| 153 | 18DL0004I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 10. SILANG BR. (B02555LZ) ALONG MSR JCT. LOPEZ-CATANAUAN RD | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.064 |
| 154 | 18DL0005I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 1. BAMBAN BR. (B02579LZ) ALONG DAANG MAHARLIKA(LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱6.7M | 100% | Medium risk47 | —-0.064 |
| 155 | 19DL0035A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3.BRIDGE PROGRAM B.RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES 4.TAN-AG BR. (B02761LZ) ALONG MSR JCT-LOPEZ-BUENAVISTA RD | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.064 |
| 156 | 19DL0033A.ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3.BRIDGE PROGRAM B.RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES 1.BUENAVISTA BR. (B00006AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱5.8M | 100% | Medium risk47 | —-0.064 |
| 157 | 20DL0120A. ORGANIZATIONAL OUTCOME 1. ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM B. WIDENING OF PERMANENT BRIDGES 2. LUMUTAN BR. (B02571LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱13.8M | 100% | Medium risk47 | —-0.065 |
| 158 | 18DL0188I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES 12. BOLO BR. 2 (B02598LZ) ALONG QUIRINO H-WAY | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.065 |
| 159 | 18DL0130A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM B. WIDENING OF PERMANENT BRIDGES 1. BALOGOHIN BR. (B02567LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Quezon 4th DEO | Completed | ₱13.3M | 100% | Medium risk47 | —-0.067 |
| 160 | 24DL0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, 46. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY VILLA NACAOB, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.099 |
| 161 | 19DK0024RETROFITTING/STRENGTHENING OF TIGNOAN BRIDGE ALONG FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱22.5M | 100% | Medium risk47 | —-0.065 |
| 162 | 19A00075RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, OLO BR. (B00675LZ) ALONG PANGASINAN-TARLAC RD | Region I | Region I | Completed | ₱23.2M | 100% | Medium risk47 | —-0.051 |
| 163 | 25D00170ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY - K0235 + 580 - K0236 + 051 | Region IV-A | Region IV-A | On-Going | ₱31.7M | 0% | Medium risk47 | —-0.046 |
| 164 | 25D00077CONSTRUCTION OF MISSING LINKS/ NEW ROADS ATIMONAN - MAUBAN ROAD, MAUBAN SECTION, QUEZON, PACKAGE B | Region IV-A | Region IV-A | On-Going | ₱38.2M | 47% | Medium risk47 | —-0.061 |
| 165 | 25DL0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ATIMONAN-MAUBAN ROAD, ATIMONAN SECTION, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.8M | 93% | Medium risk47 | —-0.074 |
| 166 | 21DL0158ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING , PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0171+805 - K0172+580 | Region IV-A | Quezon 4th DEO | Completed | ₱40.2M | 100% | Medium risk47 | —-0.105 |
| 167 | 24DL0133CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 49. CONSTRUCTION OF MULTI-PURPOSE BUILDING, VILLA BOTA ELEMENTARY SCHOOL, BARANGAY VILLA BOTA, GUMACA, QUEZO | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 168 | 18DL0148A. ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM C. CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS 1. PRIMARY ROADS 1. DAANG MAHARLIKA (LZ) - K0194+065 - K0194+714, K0194 | Region IV-A | Quezon 4th DEO | Completed | ₱37.8M | 100% | Medium risk47 | —-0.105 |
| 169 | 24DL0132CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 50. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY HABINGAN, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.099 |
| 170 | 20DL0251REPAIR/REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MSR, JCT LOPEZ-CATANAUAN ROAD - K0226+100 - K0226+200, BOTH LANES, LOPEZ, QUEZON, DAMAGED BY TYPHOONS KRISTINE, LEON, MARCE, NIKA, OFEL AND PEPITO | Region IV-A | Quezon 4th DEO | Completed | ₱42.5M | 100% | Medium risk47 | —-0.103 |
| 171 | 23DM0036NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - UNISAN DIVERSION ROAD, QUEZON, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.104 |
| 172 | 24DL0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 10. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CAMOHAGUIN, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.102 |
| 173 | 24DL0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES 53. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY VILLA JESUS WESTE, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.098 |
| 174 | 18DL0009I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 9. SAN RAFAEL BR. (B03101) ALONG TALABA-SUMMIT-PANAON RD | Region IV-A | Quezon 4th DEO | Completed | ₱5.7M | 100% | Medium risk47 | —-0.064 |
| 175 | 18DL0008I. OPERATIONS A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 3. BRIDGE PROGRAM A. RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES 8. KAGUISI BR. 2 (B00038AB) ALONG QUEZON-ALABAT-PEREZ RD | Region IV-A | Quezon 4th DEO | Completed | ₱5.7M | 100% | Medium risk47 | —-0.064 |