Opening the dossier…
Opening the dossier…
Contractor dossier
260 projects on file, including joint ventures this contractor is part of.
Total projects
260
Total budget
₱3.3B
Average progress
94.6%
Completion rate
85.0%
Average risk score
39.5
Medium risk on average, out of 100
Flagged as unusual
14
5.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 260 | ₱3.3B | 39.5 | 14 | 94.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 95 | ₱1.2B | 36.1 | 2 | 93.8% |
| Buildings and Facilities | 81 | ₱599.9M | 34.2 | 2 | 95.7% |
| Flood Control and Drainage | 56 | ₱1B | 43.8 | 0 | 94.8% |
| Bridges | 8 | ₱116.8M | 41.2 | 0 | 100.0% |
| Water Provision and Storage | 7 | ₱58.5M | 27.8 | 0 | 100.0% |
| GAA 2025 SSP | 6 | ₱100.2M | 94.7 | 6 | 82.5% |
| OTHER | 6 | ₱103.4M | 79.6 | 4 | 92.3% |
| Bridges, Roads | 1 | ₱97.8M | 62.4 | 0 | 76.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0118CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LOKEB ESTE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 98% | High risk95 | Flagged0.010 |
| 25AJ0102CONSTRUCTION OF DRAINAGE CANAL, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.008 |
| 25A00487BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER VI (1. CONSTRUCTION OF ROADS AT BRGY. LUMBANG, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. NAGSAING, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.LONGOS, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 59% | High risk95 | Flagged0.026 |
| 25AJ0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BOLAOIT, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 64% | High risk95 | Flagged0.023 |
| 25AJ0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.5M | 75% | High risk94 | Flagged0.018 |
| 25AJ0140CONCRETING OF BRGY. BALITE FMR, BRGY. BALITE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 63% | High risk86 | Flagged0.052 |
| 23AJ0135CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, BOLOSAN - CAINGAL E/S, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱11.8M | 91% | High risk86 | Flagged0.054 |
| 23AJ0137CONSTRUCTION OF ONE (1) STOREY, THREE (3) CLASSROOM SCHOOL BUILDING, TURAC NHS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱5.9M | 100% | High risk85 | Flagged0.010 |
| 23AJ0050CONSTRUCTION OF ADDITIONAL EXTENSION OFFICE BUILDING, DPWH PANGASINAN 4TH DEO, TULIAO, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱12.8M | 100% | High risk74 | Flagged0.006 |
| 24AJ01061. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER, WARDING SECTION, BAYAMBANG, PANGASINAN 2. CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱39.2M | 100% | High risk73 | —-0.033 |
| 23AJ0029CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG SAN JUAN RIVER, AGDAO SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱19.2M | 100% | High risk73 | —-0.030 |
| 22AJ0025CONSTRUCTION OF ROAD, BARANGAY GUEGUESANGEN, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk68 | —-0.051 |
| 22AJ0029CONSTRUCTION OF ROAD SHOULDER ALONG SAN CARLOS - URBIZTONDO ROAD (MALACAÑANG & CAOAYAN KILING SECTION), SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk65 | —-0.055 |
| 24A00033CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DAGUPAN-MANGALDAN-CALASIAO CIRCUMFERENTIAL ROAD (CALASIAO SECTION), PANGASINAN | Region I | Region I | On-Going | ₱32.8M | 0% | High risk65 | Flagged0.010 |
| 25A00489BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER II (1. CONSTRUCTION OF ROADS AT BRGY. NALSIAN, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. BANAOANG, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.SAN VICENTE, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 20% | High risk65 | —-0.004 |
| 22AJ0035CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY TAMPOG, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.9M | 100% | High risk65 | —-0.046 |
| 22AJ0048CONSTRUCTION OF ROAD, BRGY. NANCAPIAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱12.7M | 100% | High risk65 | —-0.059 |
| 24A00224CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALASIQUI DIVERSION ROAD, MALASIQUI, PANGASINAN | Region I | Region I | On-Going | ₱97.8M | 76% | High risk62 | —-0.022 |
| 24A00223CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BUED RIVER, BARANGAY PIAS, MAPANDAN, PANGASINAN | Region I | Region I | Completed | ₱120.6M | 100% | High risk62 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AJ0135CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, BOLOSAN - CAINGAL E/S, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱11.8M | 91% | High risk86 | Flagged0.054 |
| 25AJ0140CONCRETING OF BRGY. BALITE FMR, BRGY. BALITE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 63% | High risk86 | Flagged0.052 |
| 23AJ0147CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BOGAOAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 0% | Medium risk46 | Flagged0.035 |
| 25AJ0145CONCRETING OF BRGY. MATAGDEM FMR, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 2% | Medium risk45 | Flagged0.031 |
| 24AJ0102CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN MALASIQUI I CENTRAL SCHOOL, BRGY. POBLACION, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱5.9M | 0% | Medium risk46 | Flagged0.027 |
| 25A00487BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER VI (1. CONSTRUCTION OF ROADS AT BRGY. LUMBANG, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. NAGSAING, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.LONGOS, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 59% | High risk95 | Flagged0.026 |
| 25AJ0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BOLAOIT, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 64% | High risk95 | Flagged0.023 |
| 25AJ0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.5M | 75% | High risk94 | Flagged0.018 |
| 24A00033CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DAGUPAN-MANGALDAN-CALASIAO CIRCUMFERENTIAL ROAD (CALASIAO SECTION), PANGASINAN | Region I | Region I | On-Going | ₱32.8M | 0% | High risk65 | Flagged0.010 |
| 23AJ0137CONSTRUCTION OF ONE (1) STOREY, THREE (3) CLASSROOM SCHOOL BUILDING, TURAC NHS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱5.9M | 100% | High risk85 | Flagged0.010 |
| 25AJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LOKEB ESTE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 98% | High risk95 | Flagged0.010 |
| 25AJ0118CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AJ0102CONSTRUCTION OF DRAINAGE CANAL, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.008 |
| 23AJ0050CONSTRUCTION OF ADDITIONAL EXTENSION OFFICE BUILDING, DPWH PANGASINAN 4TH DEO, TULIAO, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱12.8M | 100% | High risk74 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24AJ0094REHABILITATION OF LOCAL ROAD, BARANGAY TALIBAEW, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱48.2M | 94% | Medium risk49 | —-0.048 |
| 52 | 24A00239CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG MARUSAY RIVER, BRGY. QUESBAN, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱48.3M | 100% | Medium risk49 | —-0.071 |
| 53 | 23AJ01251. CONSTRUCTION OF SLOPE PROTECTION ALONG AGNO RIVER, BARANGAY TAMPOG, BAYAMBANG, PANGASINAN ; 2. CONSTRUCTION OF SLOPE PROTECTION ALONG AGNO RIVER, BARANGAY ITON, BAYAMBANG, PANGASINAN; 3. CONSTRUCTION OF SLOPE PROTECTION ALONG AGNO RIVER, BARANGAY SAN G | Region I | Pangasinan 4th DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.072 |
| 54 | 25AJ0033CONSTRUCTION OF DRAINAGE STRUCTURE, PUROK 3, BARANGAY BOLOSAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | Medium risk47 | —-0.044 |
| 55 | 21AJ0071CONSTRUCTION OF SLOPE PROTECTION ALONG BINALBALOLONG CREEK, BARANGAY POBLACION, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.072 |
| 56 | 25AJ0100CONSTRUCTION OF FLOOD CONTROL (WATER IMPOUNDING), BRGY. RIZAL, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 1% | Medium risk47 | —-0.010 |
| 57 | 21AJ0014CONSTRUCTION OF SLOPE PROTECTION ALONG INGALERA RIVER, BARANGAY ICAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.069 |
| 58 | 23AJ0069CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY BALOLING PHASE IV, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.070 |
| 59 | 21AJ0061CONSTRUCTION OF SLOPE PROTECTION ALONG SAN JUAN RIVER, BARANGAY CALOMBOYAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.073 |
| 60 | 21AJ0006CONSTRUCTION OF SLOPE PROTECTION ALONG PANAMINDITAAN CREEK, BARANGAY TALANG, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.072 |
| 61 | 24AJ0056CONSTRUCTION OF DRAINAGE, BRGY. CABILOCAAN, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.074 |
| 62 | 19AJ0099CONSTRUCTION (COMPLETION) OF WAIG-TOBOR BRIDGE AND APPROACHES, BARANGAY WAIG, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱19.1M | 100% | Medium risk47 | —-0.053 |
| 63 | 25AJ0073CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO DE VEGA RIVER, BARANGAY TARECE, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.4M | 83% | Medium risk46 | —-0.035 |
| 64 | 25AJ0091CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LIBAS CREEK, BARANGAY LIBAS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.4M | 100% | Medium risk46 | —-0.045 |
| 65 | 23AJ0072REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - CALVO BR. (B02765LZ) ALONG CARMEN JCT - BAYAMBANG - MANAT RD, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱5.8M | 100% | Medium risk46 | —-0.051 |
| 66 | 25AJ0061CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.070 |
| 67 | 25AJ0062CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY INERANGAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱29.3M | 100% | Medium risk46 | —-0.070 |
| 68 | 25AJ0092CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG APONIT RIVER, BARANGAY CAOAYAN KILING, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱33.1M | 90% | Medium risk46 | —-0.038 |
| 69 | 25AJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER, BARANGAY MANAMBONG NORTE, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱42.5M | 100% | Medium risk46 | —-0.070 |
| 70 | 18AJ0072WIDENING OF VILLAMIL BRIDGE 2 (B04564LZ) ALONG SAN CARLOS-CALASIAO ROAD, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱7.5M | 100% | Medium risk46 | —-0.044 |
| 71 | 18AJ0053WIDENING OF TURAC BRIDGE (B00858LZ) ALONG CARMEN JCT.-BAYAMBANG-MANAT ROAD, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.2M | 100% | Medium risk46 | —-0.048 |
| 72 | 23AJ0074REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - SINUCALAN BR. (B04565LZ) ALONG URDANETA JCT - DAGUPAN RD, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.050 |
| 73 | 23AJ0147CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BOGAOAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 0% | Medium risk46 | Flagged0.035 |
| 74 | 23AI0081CONCRETING/IMPROVEMENT OF ROADS AT UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.090 |
| 75 | 24AJ0102CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN MALASIQUI I CENTRAL SCHOOL, BRGY. POBLACION, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱5.9M | 0% | Medium risk46 | Flagged0.027 |