Contractor dossier
260 projects on file, including joint ventures this contractor is part of.
Total projects
260
Total budget
₱3.3B
Average progress
94.6%
Completion rate
85.0%
Average risk score
39.5
Medium risk on average, out of 100
Flagged as unusual
14
5.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 260 | ₱3.3B | 39.5 | 14 | 94.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 95 | ₱1.2B | 36.1 | 2 | 93.8% |
| Buildings and Facilities | 81 | ₱599.9M | 34.2 | 2 | 95.7% |
| Flood Control and Drainage | 56 | ₱1B | 43.8 | 0 | 94.8% |
| Bridges | 8 | ₱116.8M | 41.2 | 0 | 100.0% |
| Water Provision and Storage | 7 | ₱58.5M | 27.8 | 0 | 100.0% |
| GAA 2025 SSP | 6 | ₱100.2M | 94.7 | 6 | 82.5% |
| OTHER | 6 | ₱103.4M | 79.6 | 4 | 92.3% |
| Bridges, Roads | 1 | ₱97.8M | 62.4 | 0 | 76.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0118CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LOKEB ESTE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 98% | High risk95 | Flagged0.010 |
| 25AJ0102CONSTRUCTION OF DRAINAGE CANAL, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.008 |
| 25A00487BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER VI (1. CONSTRUCTION OF ROADS AT BRGY. LUMBANG, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. NAGSAING, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.LONGOS, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 59% | High risk95 | Flagged0.026 |
| 25AJ0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BOLAOIT, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 64% | High risk95 | Flagged0.023 |
| 25AJ0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.5M | 75% | High risk94 | Flagged0.018 |
| 25AJ0140CONCRETING OF BRGY. BALITE FMR, BRGY. BALITE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 63% | High risk86 | Flagged0.052 |
| 23AJ0135CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, BOLOSAN - CAINGAL E/S, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱11.8M | 91% | High risk86 | Flagged0.054 |
| 23AJ0137CONSTRUCTION OF ONE (1) STOREY, THREE (3) CLASSROOM SCHOOL BUILDING, TURAC NHS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱5.9M | 100% | High risk85 | Flagged0.010 |
| 23AJ0050CONSTRUCTION OF ADDITIONAL EXTENSION OFFICE BUILDING, DPWH PANGASINAN 4TH DEO, TULIAO, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱12.8M | 100% | High risk74 | Flagged0.006 |
| 24AJ01061. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGNO RIVER, WARDING SECTION, BAYAMBANG, PANGASINAN 2. CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱39.2M | 100% | High risk73 | —-0.033 |
| 23AJ0029CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG SAN JUAN RIVER, AGDAO SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱19.2M | 100% | High risk73 | —-0.030 |
| 22AJ0025CONSTRUCTION OF ROAD, BARANGAY GUEGUESANGEN, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.8M | 100% | High risk68 | —-0.051 |
| 22AJ0029CONSTRUCTION OF ROAD SHOULDER ALONG SAN CARLOS - URBIZTONDO ROAD (MALACAÑANG & CAOAYAN KILING SECTION), SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk65 | —-0.055 |
| 24A00033CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DAGUPAN-MANGALDAN-CALASIAO CIRCUMFERENTIAL ROAD (CALASIAO SECTION), PANGASINAN | Region I | Region I | On-Going | ₱32.8M | 0% | High risk65 | Flagged0.010 |
| 25A00489BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER II (1. CONSTRUCTION OF ROADS AT BRGY. NALSIAN, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. BANAOANG, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.SAN VICENTE, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 20% | High risk65 | —-0.004 |
| 22AJ0035CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY TAMPOG, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.9M | 100% | High risk65 | —-0.046 |
| 22AJ0048CONSTRUCTION OF ROAD, BRGY. NANCAPIAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱12.7M | 100% | High risk65 | —-0.059 |
| 24A00224CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALASIQUI DIVERSION ROAD, MALASIQUI, PANGASINAN | Region I | Region I | On-Going | ₱97.8M | 76% | High risk62 | —-0.022 |
| 24A00223CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BUED RIVER, BARANGAY PIAS, MAPANDAN, PANGASINAN | Region I | Region I | Completed | ₱120.6M | 100% | High risk62 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AJ0135CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, BOLOSAN - CAINGAL E/S, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱11.8M | 91% | High risk86 | Flagged0.054 |
| 25AJ0140CONCRETING OF BRGY. BALITE FMR, BRGY. BALITE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 63% | High risk86 | Flagged0.052 |
| 23AJ0147CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BOGAOAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 0% | Medium risk46 | Flagged0.035 |
| 25AJ0145CONCRETING OF BRGY. MATAGDEM FMR, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱14.4M | 2% | Medium risk45 | Flagged0.031 |
| 24AJ0102CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN MALASIQUI I CENTRAL SCHOOL, BRGY. POBLACION, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱5.9M | 0% | Medium risk46 | Flagged0.027 |
| 25A00487BASIC INFRASTRUCTURE PROGRAM (BIP) - CLUSTER VI (1. CONSTRUCTION OF ROADS AT BRGY. LUMBANG, CALASIAO, PANGASINAN; 2. CONSTRUCTION OF ROADS AT BRGY. NAGSAING, CALASIAO, PANGASINAN; 3. CONSTRUCTION OF ROADS AT BRGY.LONGOS, CALASIAO, PANGASINAN) | Region I | Region I | On-Going | ₱28.8M | 59% | High risk95 | Flagged0.026 |
| 25AJ0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BOLAOIT, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 64% | High risk95 | Flagged0.023 |
| 25AJ0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY SAN GABRIEL 2ND, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱9.5M | 75% | High risk94 | Flagged0.018 |
| 24A00033CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DAGUPAN-MANGALDAN-CALASIAO CIRCUMFERENTIAL ROAD (CALASIAO SECTION), PANGASINAN | Region I | Region I | On-Going | ₱32.8M | 0% | High risk65 | Flagged0.010 |
| 23AJ0137CONSTRUCTION OF ONE (1) STOREY, THREE (3) CLASSROOM SCHOOL BUILDING, TURAC NHS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱5.9M | 100% | High risk85 | Flagged0.010 |
| 25AJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LOKEB ESTE, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.9M | 98% | High risk95 | Flagged0.010 |
| 25AJ0118CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGALERA RIVER, BARANGAY ANO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.2M | 100% | High risk95 | Flagged0.009 |
| 25AJ0102CONSTRUCTION OF DRAINAGE CANAL, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.008 |
| 23AJ0050CONSTRUCTION OF ADDITIONAL EXTENSION OFFICE BUILDING, DPWH PANGASINAN 4TH DEO, TULIAO, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱12.8M | 100% | High risk74 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22AJ0080CONSTRUCTION/REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - RAIN WATER COLLECTOR SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱2.6M | 100% | Low risk27 | —-0.044 |
| 177 | 21AJ0082WIDENING OF PERMANENT BRIDGES-BARANGOBONG BR. 2 (B01992LZ) ALONG VILLASIS-MALASIQUI-SN CARLOS RD, PHASE II, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.4M | 100% | Low risk27 | —-0.050 |
| 178 | 21A00180CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING FACILITY), BONUAN BINLOC, DAGUPAN CITY, PANGASINAN | Region I | Region I | Completed | ₱4M | 100% | Low risk26 | —-0.088 |
| 179 | 21A00245LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MATAGDEM, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk26 | —-0.086 |
| 180 | 19AJ0105CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL GYMNASIUM/COVERED COURT), DOYONG NATIONAL HIGH SCHOOL, BRGY. DOYONG, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk26 | —-0.086 |
| 181 | 18AJ0026CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, TELBANG SECTION, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.7M | 100% | Low risk26 | —-0.070 |
| 182 | 22AJ0097CONCRETING OF FARM TO MARKET ROAD, BRGY. AMANOAOAC, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk26 | —-0.032 |
| 183 | 22AJ0098CONCRETING OF FARM TO MARKET ROAD, BRGY. PRIMICIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk26 | —-0.032 |
| 184 | 21AJ0068CONCRETING OF LOCAL ROAD, SITIO CENTRO, BARANGAY LUYAN, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.089 |
| 185 | 19AJ0104CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL GYMNASIUM/COVERED COURT), PALAMING ELEMENTARY SCHOOL, BRGY. PALAMING, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.087 |
| 186 | 22AJ0095CONCRETING OF FARM TO MARKET ROAD, BRGY. ANANDO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱3M | 100% | Low risk25 | —-0.033 |
| 187 | 23AJ0134CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAINWATER COLLECTOR SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱2.3M | 100% | Low risk25 | —-0.043 |
| 188 | 23AJ0065CONSTRUCTION OF SINOCALAN RIVER IRRIGATION SYSTEM SERVICE ROAD, BARANGAY BUED, CALASIAO, PANGASINAN (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN) | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.089 |
| 189 | 24AJ0098CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAIN WATER COLLECTOR SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.044 |
| 190 | 20AJ0069CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. POLO, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.084 |
| 191 | 20AJ0096CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAINWATER COLLECTOR SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱4M | 100% | Low risk25 | —-0.044 |
| 192 | 20AJ0063CONCRETING OF ROAD, PUROK IV, BRGY. LILIMASAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4M | 100% | Low risk25 | —-0.088 |
| 193 | 22AJ0015CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (HEALTH CENTER) BRGY. TALOSPATANG, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2M | 100% | Low risk24 | —-0.089 |
| 194 | 21AI0102CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY FLORES, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱1.9M | 100% | Low risk24 | —-0.090 |
| 195 | 20AJ0051CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ON SECONDARY ROADS ALONG SN CARLOS-CALASIAO RD, K0208+863-K0208+956, K0211+178-K0211+268 LS, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.5M | 100% | Low risk24 | —-0.089 |
| 196 | 21AJ0076CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYM), BARANGAY SAPANG, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2M | 100% | Low risk24 | —-0.086 |
| 197 | 21AJ0114CONSTRUCTION/REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAINWATER COLLECTOR SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱4.3M | 100% | Low risk24 | —-0.043 |
| 198 | 20AJ0060CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, BRGY. BOGAOAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.068 |
| 199 | 19AJ0136CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAINWATER COLLECTORE SYSTEM | Region I | Pangasinan 4th DEO | Completed | ₱3.7M | 100% | Low risk24 | —-0.044 |
| 200 | 20AJ0074CONCRETING OF LOCAL ROAD OF PHASE 2, BRGY. AMBUETEL, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.085 |