Contractor dossier
256 projects on file, including joint ventures this contractor is part of.
Total projects
256
Total budget
₱6.2B
Average progress
95.2%
Completion rate
82.4%
Average risk score
43.7
Medium risk on average, out of 100
Flagged as unusual
10
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 252 | ₱6.2B | 44.1 | 10 | 95.1% |
| Region IV-B | 3 | ₱5.5M | 11.4 | 0 | 100.0% |
| National Capital Region | 1 | ₱4.9M | 47.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 95 | ₱1.2B | 32.6 | 2 | 97.5% |
| Roads | 89 | ₱2.6B | 48.2 | 1 | 93.1% |
| Flood Control and Drainage | 56 | ₱1.8B | 46.6 | 0 | 98.0% |
| OTHER | 7 | ₱460.9M | 81.1 | 5 | 81.8% |
| GAA 2025 OO-1 | 4 | ₱115.2M | 93.0 | 2 | 73.9% |
| Water Provision and Storage | 4 | ₱13.1M | 40.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱62.7M | 92.3 | 0 | 74.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IK0004NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, BASEY - MARABUT - PINAMITINAN RD., K0910+000 - K0910+470, K0910+494 - K0911+000 | Region VIII | Samar 2nd DEO | On-Going | ₱52.5M | 92% | High risk94 | —-0.004 |
| 25I00097ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0699+071 - K0700+000, K0697+535 - K0697+663, K0698+032 - K0698+163 | Region VIII | Region VIII | On-Going | ₱33.8M | 50% | High risk93 | Flagged0.007 |
| 25I00095ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OD ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) K0698+541 - K0968+613 | Region VIII | Region VIII | On-Going | ₱14.5M | 61% | High risk92 | Flagged0.006 |
| 25I00114ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0692+684 - K0692+761 | Region VIII | Region VIII | On-Going | ₱14.5M | 92% | High risk92 | —-0.005 |
| 25IK0051CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD CONTROL STRUCTURE, ANTIAO BRIDGE IV (CATBALOGAN DIVERSION BRIDGE), STA. 0+926.31-STA. 1+040.00, BRGY, SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱62.7M | 74% | High risk92 | —-0.008 |
| 23IK0073CONSTRUCTION OF CATBALOGAN DRAINAGE SYSTEM (ANTIAO CREEK AND OUTFALLS), CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱101.3M | 98% | High risk83 | Flagged0.017 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IK0099CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONST. OF DPWH SAMAR 2ND DEO NEW BUILDING, CATBALOGAN CITY, | Region VIII | Samar 2nd DEO | On-Going | ₱77.2M | 69% | High risk81 | Flagged0.009 |
| 24IC0149ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, K0918+000 - K0920+000, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱49M | 100% | High risk81 | —-0.036 |
| 23IK0078CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAGUNDI, CATBALOGAN CITY, SAMAR (PHASE I) | Region VIII | Samar 2nd DEO | On-Going | ₱48.2M | 85% | High risk81 | Flagged0.013 |
| 24IJ0075CSSP: CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING), GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱49.2M | 28% | High risk81 | Flagged0.018 |
| 24IJ0067CSSP: CONSTRUCTION OF ROAD, BRGY. QUEZON - CANTAGUIC ROAD, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱39.5M | 100% | High risk78 | —-0.039 |
| 22I00107CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱123.3M | 93% | High risk67 | —-0.021 |
| 24IK0041CONSTRUCTION OF CATBALOGAN DRAINAGE SYSTEM, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱95.4M | 77% | High risk64 | —-0.017 |
| 24IM0104CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR PHASE II, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 25% | High risk64 | Flagged0.031 |
| 24IK0033CONST. OF FLOOD CONTROL BUCALAN BRIDGE, BARANGAY CANDUYOCAN, SAN SEBASTIAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.4M | 99% | High risk64 | —-0.025 |
| 22IJ0082OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULID RIVER, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱93.9M | 100% | High risk63 | —-0.056 |
| 23IK0077CONSTRUCTION OF MULTI-PURPOSE BUILDING AT EASTERN VISAYAS REGIONAL SCIENCE HIGH SCHOOL BUILDING, GUINDAPUNAN, CATBALOGAN CITY | Region VIII | Samar 2nd DEO | Completed | ₱77.5M | 100% | High risk62 | —-0.082 |
| 24IK0089CONST. OF MULTI-PURPOSE BUILDING, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱58.8M | 1% | High risk62 | —-0.016 |
| 24IK0095CONSTRUCTION OF PHASE III OF THE NEW PROVINCIAL HOSPITAL PROJECT, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱66.8M | 48% | High risk62 | —-0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IM0104CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR PHASE II, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 25% | High risk64 | Flagged0.031 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IJ0075CSSP: CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEGISLATIVE BUILDING), GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱49.2M | 28% | High risk81 | Flagged0.018 |
| 23IK0073CONSTRUCTION OF CATBALOGAN DRAINAGE SYSTEM (ANTIAO CREEK AND OUTFALLS), CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱101.3M | 98% | High risk83 | Flagged0.017 |
| 23IM0121CONSTRUCTION OF 4STY20CL, ST. FRANCIS INTEGRATED SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱60M | 67% | High risk61 | Flagged0.015 |
| 23IK0078CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAGUNDI, CATBALOGAN CITY, SAMAR (PHASE I) | Region VIII | Samar 2nd DEO | On-Going | ₱48.2M | 85% | High risk81 | Flagged0.013 |
| 24IK0099CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONST. OF DPWH SAMAR 2ND DEO NEW BUILDING, CATBALOGAN CITY, | Region VIII | Samar 2nd DEO | On-Going | ₱77.2M | 69% | High risk81 | Flagged0.009 |
| 25I00097ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0699+071 - K0700+000, K0697+535 - K0697+663, K0698+032 - K0698+163 | Region VIII | Region VIII | On-Going | ₱33.8M | 50% | High risk93 | Flagged0.007 |
| 23IM0119CONSTRUCTION OF 4STY20CL, ANIBONG DREAMVILLE ELEMENTARY SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱60M | 83% | High risk61 | Flagged0.007 |
| 25I00095ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OD ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) K0698+541 - K0968+613 | Region VIII | Region VIII | On-Going | ₱14.5M | 61% | High risk92 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17IJ0010REPAIR/REHAB OF DRAINAGE ALONG GANDARA OLD ROUTE, CHAINAGE 000 - CHAINAGE 506, GANDARA, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱5.5M | 100% | Medium risk57 | —-0.060 |
| 27 | 25IK0040CSSP-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF ROAD. POB. 1-POB. 3-BRGY. BUENAVISTA-BRGY. SOONG, DARAM, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 33% | Medium risk57 | —-0.008 |
| 28 | 17IJ0042REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS,WITH SLIPS,SLOPE COLLAPSE, AND LANDSLIDE ALONG CALBAYOG -DIVERSION ROAD K0741+280-K0741+380, CALBAYOG CITY, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱7.6M | 100% | Medium risk57 | —-0.058 |
| 29 | 23IK0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (TERMINAL BUILDING) AND SITE DEVELOPMENT, BRGY. BURAY, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱38.8M | 74% | Medium risk57 | —-0.033 |
| 30 | 24I00369NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0732+710, SAMAR 1ST LD | Region VIII | Region VIII | On-Going | ₱13.4M | 1% | Medium risk57 | —-0.001 |
| 31 | 24IK0034CONSTRUCTION OF CONCEPTION - TAPUL - NAWI - PAGSANGHAN - ANAGASE - STO. NIÑO - MAYLOBE - SARAO CANVAIS - CARANAS ROAD, PARANAS - MOTIONG, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱86.8M | 99% | Medium risk57 | —-0.044 |
| 32 | 25IK0008NETWORK DEVELOPMENT- ROAD WIDENING-SECONDARY ROADS- WRIGHT-TAFT-BORONGAN RD.- K0834+037-K0835+000, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱59.8M | 62% | Medium risk57 | —-0.044 |
| 33 | 25IK0009NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROADS- BASEY-MARABUT-PINAMITINAN RD- K0909+(-784.20)-K0910+000, BASEY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱77.1M | 78% | Medium risk57 | —-0.049 |
| 34 | 25IK0016SUSTAINABLE INFRASTRUCTURE PROJ ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL RDS AND/OR BRIDGES (RDS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST OF ACCESS RD, LITERON ANTOL IN CALBIGA TO CANLOBO-LAYO-MAGDAWAT-PELAON OF PINABACDAO TO MABINI, BASEY, S | Region VIII | Samar 2nd DEO | On-Going | ₱72.4M | 33% | Medium risk56 | —-0.036 |
| 35 | 23IC0099CONSTRUCTION OF TWO-STOREY MUNICIPAL EVACUATION CENTER, BARANGAY LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱44.1M | 100% | Medium risk56 | —-0.095 |
| 36 | 24I00243ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0707+108 - K0707+808, K0734+137 - K0734+539, K0777+389 - K0778+000, K0781+240 - K0781+780, | Region VIII | Region VIII | On-Going | ₱76.5M | 100% | Medium risk56 | —-0.054 |
| 37 | 23IK0061CONSTRUCTION OF NEW POLICE PROVINCIAL BUILDING, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.1M | 99% | Medium risk55 | —-0.045 |
| 38 | 21IK0038CONST. OF LIBRARY BUILDING, SAMAR STATE UNIVERSITY, BRGY. MERCEDES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱33.7M | 100% | Medium risk55 | —-0.092 |
| 39 | 24IJ0014OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG AIRPORT BY-PASS ROAD , SAMAR | Region VIII | Samar 1st DEO | Completed | ₱88.2M | 100% | Medium risk55 | —-0.085 |
| 40 | 23IJ0071OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, STA. MARGARITA, DIVERSION ROAD, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱69.1M | 100% | Medium risk55 | —-0.089 |
| 41 | 23IJ0013OO1: (RE-ADVERTISD) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG AIRPORT BY-PASS ROAD, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱70M | 100% | Medium risk55 | —-0.090 |
| 42 | 24IJ0022OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0798+134 - K0798+381 | Region VIII | Samar 1st DEO | Completed | ₱67.5M | 100% | Medium risk55 | —-0.090 |
| 43 | 24IK0086BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONST. OF MULTI-PURPOSE BLDG. (MUNICIPAL POLICE STATION), BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱24.5M | 100% | Medium risk54 | —-0.093 |
| 44 | 22IC0062CONSTRUCTION OF VETERANS WELFARE CENTER - VETERANS FEDERATION OF THE PHILIPPINES (EASTERN VISAYAS), PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱24.3M | 100% | Medium risk54 | —-0.093 |
| 45 | 23IK0036CONSTRUCTION OF ROAD, BONGA - PAMAMAS-AN - LINONOBAN - MARARANGSI - CALUYAHAN, MOTIONG, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱48.2M | 63% | Medium risk54 | —-0.032 |
| 46 | 22IK0059ASSET PRESERVATION-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS - BASEY-MARABUT-PINAMITINAN ROAD, K0912+193 -K0912+530; K0916+900 - K0917+000; K0917+500 - K0917+743, K0917+757 - K0917+800, K0918+400 - K0918+550, K0920+1360 - K0920+1420 | Region VIII | Samar 2nd DEO | On-Going | ₱49M | 100% | Medium risk54 | —-0.034 |
| 47 | 23IC0012ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, PAWING-CAMPETIC ROAD, K0917+(-297) - K0917+173, K0917+418 - K0917+986, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.094 |
| 48 | 23IJ0012OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) K0782+342 - K0782+497, K0783+(-196) - K0783+(-130) | Region VIII | Samar 1st DEO | Completed | ₱50.1M | 100% | Medium risk53 | —-0.095 |
| 49 | 25IJ0007OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱67.5M | 85% | Medium risk53 | —-0.034 |
| 50 | 24IJ0019OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY CALIROCAN, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.080 |