124 projects on file, including joint ventures this contractor is part of.
Total projects
124
Total budget
₱4.3B
Average progress
93.5%
Completion rate
76.6%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
15
12.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 122 | ₱4.2B | 49.1 | 15 | 93.4% |
| Region III | 1 | ₱96.5M | 56.0 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱1.7M | 19.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 57 | ₱3.5B | 55.8 | 10 | 93.2% |
| Buildings and Facilities | 40 | ₱502.8M | 41.9 | 2 | 93.6% |
| Roads | 19 | ₱160.4M | 43.9 | 1 | 94.7% |
| Bridges | 6 | ₱59.9M | 41.8 | 0 | 100.0% |
| OTHER | 1 | ₱16.4M | 73.4 | 1 | 91.0% |
| Water Provision and Storage | 1 | ₱9.8M | 49.0 | 1 | 53.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AI0160CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱16.4M | 91% | High risk73 | Flagged0.010 |
| 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23A00439CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 22AI0051CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BARANGAY DIKET-DON JUSTO ABALOS, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.045 |
| 22A00182BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL GROUND, BARANGAY POBLACION, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk70 | Flagged0.024 |
| 22A00211SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱47.8M | 0% | High risk70 | Flagged0.036 |
| 23A00441CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 1) | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 17AI0070CONSTN/REHAB/UPGRADING OF DRAINAGE ALONG NATL RD, BAKIT-BAKIT JCTN-UMINGAN RD, KO 180+167; KO 202+26 | Region I | Pangasinan 3rd DEO | Completed | ₱11.1M | 100% | High risk65 | —-0.058 |
| 22A00303BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF ROAD, NANGUNEG-SAN PEDRO BARANGAY ROAD, NARVACAN, ILOCOS SUR | Region I | Region I | On-Going | ₱19.8M | 0% | High risk64 | Flagged0.025 |
| 25AI0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 25AI0155CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 25AI0032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 25AI0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.3M | 100% | High risk64 | —-0.036 |
| 25AI0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGASIT RIVERS, BALUNGAO-SANTA MARIA, PANGASINAN (PANGASINAN 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.2M | 100% | High risk64 | —-0.036 |
| 25AI0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 22A00211SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱47.8M | 0% | High risk70 | Flagged0.036 |
| 23A00439CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 23A00441CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 1) | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 22A00303BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF ROAD, NANGUNEG-SAN PEDRO BARANGAY ROAD, NARVACAN, ILOCOS SUR | Region I | Region I | On-Going | ₱19.8M | 0% | High risk64 | Flagged0.025 |
| 22A00182BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL GROUND, BARANGAY POBLACION, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk70 | Flagged0.024 |
| 24AI0237CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING FOR JUAN G. MACARAEG NATIONAL HIGH SCHOOL, CANARVACANAN, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱39.2M | 42% | Medium risk49 | Flagged0.020 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23AI0160CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱16.4M | 91% | High risk73 | Flagged0.010 |
| 24AG0185FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION STRUCTURE AT BALINCAGUING RIVER, STA. 18 + 940 - STA. 19+ 340, BARANGAY TAMBACAN, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | Flagged0.006 |
| 23AI0139CONCRETING/IMPROVEMENT OF SOLAR POTABLE WATER SYSTEM AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱9.8M | 53% | Medium risk49 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23AI0160CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱16.4M | 91% | High risk73 | Flagged0.010 |
| 2 | 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 3 | 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 4 | 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 5 | 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 6 | 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 7 | 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 8 | 23A00439CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 9 | 22AI0051CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BARANGAY DIKET-DON JUSTO ABALOS, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.045 |
| 10 | 22A00182BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL GROUND, BARANGAY POBLACION, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk70 | Flagged0.024 |
| 11 | 22A00211SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱47.8M | 0% | High risk70 | Flagged0.036 |
| 12 | 23A00441CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 1) | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 13 | 17AI0070CONSTN/REHAB/UPGRADING OF DRAINAGE ALONG NATL RD, BAKIT-BAKIT JCTN-UMINGAN RD, KO 180+167; KO 202+26 | Region I | Pangasinan 3rd DEO | Completed | ₱11.1M | 100% | High risk65 | —-0.058 |
| 14 | 22A00303BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF ROAD, NANGUNEG-SAN PEDRO BARANGAY ROAD, NARVACAN, ILOCOS SUR | Region I | Region I | On-Going | ₱19.8M | 0% | High risk64 | Flagged0.025 |
| 15 | 25AI0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 16 | 25AI0155CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 17 | 25AI0032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 18 | 25AI0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.3M | 100% | High risk64 | —-0.036 |
| 19 | 25AI0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGASIT RIVERS, BALUNGAO-SANTA MARIA, PANGASINAN (PANGASINAN 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.2M | 100% | High risk64 | —-0.036 |
| 20 | 25AI0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 21 | 25AI0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 22 | 25AI0027CONSTRUCTION OF FLOOD CO0NTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO PANGASINAN (PACKAGE 4) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 23 | 25AI0038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGASIT RIVERS, BALUNGAO-SANTA MARIA, PANGASINAN (PANGASINAN 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.5M | 100% | High risk63 | —-0.036 |
| 24 | 24AI0146CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CABALANCIAN RIVER, PACKAGE B, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.060 |
| 25 | 24AI0147CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGASIT RIVER, PACKAGE A, BALUNGAO - SANTA MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.060 |