Contractor dossier
53 projects on file, including joint ventures this contractor is part of.
Total projects
53
Total budget
₱6B
Average progress
77.7%
Completion rate
54.7%
Below 70%
Average risk score
62.1
High risk on average, out of 100
Flagged as unusual
7
13.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 41 | ₱3.3B | 62.0 | 7 | 76.8% |
| Region IV-B | 12 | ₱2.7B | 62.4 | 0 | 80.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 21 | ₱2.9B | 58.2 | 0 | 80.2% |
| Flood Control and Drainage | 18 | ₱2.3B | 62.7 | 0 | 78.1% |
| GAA 2025 SSP | 7 | ₱630.3M | 94.8 | 7 | 47.2% |
| Buildings and Facilities | 3 | ₱31.2M | 38.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.9M | 24.8 | 0 | 100.0% |
| OTHER | 1 | ₱96.5M | 63.9 | 0 | 100.0% |
| Bridges | 1 | ₱21.4M | 46.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OE0077INSTALLATION OF SOLAR LED STREETLIGHTS AT A. RIVERA ST. - C000.00 TO C945.45, TAYUMAN ST. - K0007 + (-562.60) TO K0007 + 282 AND HERMOSA ST. - C000.00 TO C622.83, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.6M | 52% | High risk95 | Flagged0.023 |
| 25OE0068REHABILITATION OF DELPAN (MUELLE) PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.6M | 100% | High risk95 | Flagged0.007 |
| 25OE0083INSTALLATION OF SOLAR LED STREETLIGHTS ALONG NAGTAHAN FLYOVER (B03338LZ) AND MABINI BRIDGE (B01733LZ) INCLUDING APPROACHES, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱105.9M | 15% | High risk95 | Flagged0.037 |
| 25OH0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREETLIGHT WITHIN BRGY. 649 TO 828, RAILROAD ST (CHAINAGE 0 - 855), MURALLA ST (CHAINAGE 0 - 1355), GEN LUNA S | National Capital Region | South Manila DEO | On-Going | ₱143.1M | 49% | High risk95 | Flagged0.030 |
| 25OH0112INSTALLATION OF SOLAR LED STREETLIGHTS ALONG DOMESTIC ROAD, PASAY | National Capital Region | South Manila DEO | On-Going | ₱95.9M | 0% | High risk95 | Flagged0.038 |
| 25OH0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF SOLAR LED STREETLIGHTS ALONG TM KALAW ST., ROXAS BLVD, TO MARIA OROSA ST., MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱48.4M | 52% | High risk95 | Flagged0.016 |
| 25OH0114INSTALLATION OF SOLAR LED STREETLIGHTS ALONG ANDREW AVE, PASAY | National Capital Region | South Manila DEO | On-Going | ₱47.9M | 62% | High risk94 | Flagged0.015 |
| 25OE0172CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱141.1M | 35% | High risk68 | —-0.024 |
| 25OH0090CONSTRUCTION OF PUMPING STATION ALONG ESTERO DE BUHANGIN PACKAGE 1B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱143.1M | 26% | High risk68 | —-0.018 |
| 24OE0006INSTALLATION OF BOOSTER PUMP AT ESTERO DE QUIAPO (PACKAGE 1B), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.9M | 100% | High risk68 | —-0.064 |
| 25OE0171CONSTRUCTION OF RETARDING BASIN AT ESTERO DE MAGDALENA (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱141.8M | 0% | High risk67 | —-0.012 |
| 24OE0033INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAYPAJO (PNR SECTION) (PACKAGE 1B), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱141.7M | 100% | High risk67 | —-0.067 |
| 24OE0004INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAYPAJO (PNR SECTION) (PACKAGE 1A), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.1M | 100% | High risk67 | —-0.067 |
| 25E00164CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (DOWNSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 43% | High risk67 | —-0.000 |
| 25E00163CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 78% | High risk67 | —-0.010 |
| 24OE0005INSTALLATION OF BOOSTER PUMP AT ESTERO DE QUIAPO (PACKAGE 1A), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.064 |
| 25E00269FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (DOWNSTREAM), STA. 000+680-STA. 000+995.85, BONGABONG, O. | Region IV-B | Region IV-B | On-Going | ₱231.1M | 45% | High risk67 | —-0.000 |
| 25OE0024REHABILITATION OF ESTEROS WITHIN ZONE 13 - 24, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.9M | 79% | High risk65 | —-0.044 |
| 25OH0120IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM WITHIN ZONE 9 -10, PASAY CITY | National Capital Region | South Manila DEO | On-Going | ₱141.6M | 40% | High risk65 | —-0.036 |
| 23OE0060CONSTRUCTION OF PUMPING STATION AT BARANGAY 182, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0112INSTALLATION OF SOLAR LED STREETLIGHTS ALONG DOMESTIC ROAD, PASAY | National Capital Region | South Manila DEO | On-Going | ₱95.9M | 0% | High risk95 | Flagged0.038 |
| 25OE0083INSTALLATION OF SOLAR LED STREETLIGHTS ALONG NAGTAHAN FLYOVER (B03338LZ) AND MABINI BRIDGE (B01733LZ) INCLUDING APPROACHES, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱105.9M | 15% | High risk95 | Flagged0.037 |
| 25OH0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREETLIGHT WITHIN BRGY. 649 TO 828, RAILROAD ST (CHAINAGE 0 - 855), MURALLA ST (CHAINAGE 0 - 1355), GEN LUNA S | National Capital Region | South Manila DEO | On-Going | ₱143.1M | 49% | High risk95 | Flagged0.030 |
| 25OE0077INSTALLATION OF SOLAR LED STREETLIGHTS AT A. RIVERA ST. - C000.00 TO C945.45, TAYUMAN ST. - K0007 + (-562.60) TO K0007 + 282 AND HERMOSA ST. - C000.00 TO C622.83, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.6M | 52% | High risk95 | Flagged0.023 |
| 25OH0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF SOLAR LED STREETLIGHTS ALONG TM KALAW ST., ROXAS BLVD, TO MARIA OROSA ST., MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱48.4M | 52% | High risk95 | Flagged0.016 |
| 25OH0114INSTALLATION OF SOLAR LED STREETLIGHTS ALONG ANDREW AVE, PASAY | National Capital Region | South Manila DEO | On-Going | ₱47.9M | 62% | High risk94 | Flagged0.015 |
| 25OE0068REHABILITATION OF DELPAN (MUELLE) PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.6M | 100% | High risk95 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24E00013SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHANGE AS PER R.A. 11239- MINDORO WEST COASTAL ROAD, K0278+000-K0296+666 (INTERMITTENT SECTIONS), OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk63 | —-0.048 |
| 27 | 24E00075ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFFERENTIAL ROAD, K0052+448-K0052+581, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱289.5M | 80% | High risk63 | —-0.019 |
| 28 | 24E00026SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG MINDORO WEST COASTAL ROAD, K0324+300-K0340+000 (INTERMITTENT SECTIONS), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk63 | —-0.053 |
| 29 | 25OH0098IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM WITHIN ZONE 20, PASAY CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 41% | High risk62 | —-0.046 |
| 30 | 25OG0129REHABILITATION OF ROAD, BARANGAY BAGUMBAYAN, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 20% | High risk62 | —-0.035 |
| 31 | 24E00108ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE), K0016+200-K0016+556, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk61 | —-0.047 |
| 32 | 24E00114ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITHSLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE), K0021+250-K0021+500, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk61 | —-0.053 |
| 33 | 24E00113ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE), K0021+000-K0021+250, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk61 | —-0.054 |
| 34 | 25OE0015PREVENTIVE MAINTENANCE - SECONDARY ROADS - J. RIZAL AVE. (S02407LZ) K0004 + (268.1) - K0006 + 644.0 | National Capital Region | North Manila DEO | On-Going | ₱105.7M | 90% | High risk61 | —-0.057 |
| 35 | 24EB0100CONSTRUCTION OF FLOOD PROTECTION STRUCTURE ALONG BARANGAYS LUMANGBAYAN AND MARIKIT, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.060 |
| 36 | 25OG0128REHABILITATION OF ROAD, BARANGAY WHITE PLAINS, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱56.7M | 53% | Medium risk55 | —-0.054 |
| 37 | 25OG0092REHABILITATION OF ROAD, BARANGAY MARILAG, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱56.7M | 89% | Medium risk55 | —-0.064 |
| 38 | 25OE0001REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE IMPROVEMENT ALONG PACHECO STREET, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱68.1M | 100% | Medium risk55 | —-0.090 |
| 39 | 25OE0011PREVENTIVE MAINTENANCE - SECONDARY ROADS - QUEZON BOULEVARD (S02554LZ) K0003 + (-243.00) - K0003 + 069.80, K0003 + 069.80 - K0003 + 545.71 | National Capital Region | North Manila DEO | On-Going | ₱62.9M | 84% | Medium risk55 | —-0.061 |
| 40 | 25OE0009PREVENTIVE MAINTENANCE - SECONDARY ROADS -JA SANTOS AVE. (S02287LZ) K0006 + 659.70 - K0005 + 158.00, K0005 + 319.00 - K0005 + 515.10, K0004 + 168.00 - K0004 + 354.00 AND (S02299LZ) K0006 + 301.10 - K0006 + 330.10 | National Capital Region | North Manila DEO | Completed | ₱73.1M | 100% | Medium risk55 | —-0.091 |
| 41 | 23E00138SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES /FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, LUCUTAN SECTION (PHASE 1), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 42 | 25OG0102REHABILITATION OF ROAD AT BARANGAY TEACHER'S VILLAGE EAST, QUEZON CITY (PACKAGE 1) | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 63% | Medium risk51 | —-0.057 |
| 43 | 25OE0002REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE ALONG KAGITINGAN STREET, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48.6M | 100% | Medium risk51 | —-0.092 |
| 44 | 23OE0146CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAYCARE CENTER) PHASE 2, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱19.6M | 100% | Medium risk49 | —-0.101 |
| 45 | 22OE0165BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE MAGDALENA, STA. 0+000.00 TO STA. 0+76.00 BOTH SIDE, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 46 | 23OE0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 166 ZONE 15, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.103 |
| 47 | 25OE0008PREVENTIVE MAINTENANCE - SECONDARY ROADS - J RIZAL AVE - K0006 + (-153) - K0006 + (-662) | National Capital Region | North Manila DEO | Completed | ₱30.9M | 100% | Medium risk47 | —-0.099 |
| 48 | 23OB0064REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - PASIG BLVD-C5 FLYOVER (B01876LZ) ALONG C-5 ROAD | National Capital Region | Metro Manila 1st DEO | Completed | ₱21.4M | 100% | Medium risk47 | —-0.064 |
| 49 | 24OH0018ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM/CONST. OF DRAINAGE SYSTEM (BOX CULVERT) NEW PANADEROS ST. (LAMBINGAN BRIDGE TO AGLIPAY ST.), | National Capital Region | South Manila DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.088 |
| 50 | 23OE0171REHABILITATION OF DRAINAGE SYSTEM ALONG JUAN LUNA ST. TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.088 |