Contractor dossier
148 projects on file, including joint ventures this contractor is part of.
Total projects
148
Total budget
₱6B
Average progress
92.0%
Completion rate
79.7%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
10
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 138 | ₱5.4B | 46.6 | 8 | 93.2% |
| Negros Island Region | 6 | ₱324.4M | 78.9 | 2 | 76.2% |
| National Capital Region | 4 | ₱246M | 55.1 | 0 | 75.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱3B | 44.3 | 0 | 96.6% |
| Buildings and Facilities | 29 | ₱1.3B | 43.9 | 4 | 90.7% |
| Flood Control and Drainage | 13 | ₱852.6M | 49.0 | 0 | 98.0% |
| GAA 2025 OO-1 | 5 | ₱380.5M | 94.8 | 3 | 69.8% |
| OTHER | 4 | ₱156.5M | 63.9 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱64.2M | 92.3 | 3 | 15.0% |
| Bridges | 3 | ₱151M | 53.3 | 0 | 41.3% |
| Water Provision and Storage | 3 | ₱74.5M | 47.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HL0065ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: LITID BR. (B00030NR) ALONG DUMAGUETE SOUTH RD, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱72.3M | 29% | High risk95 | Flagged0.013 |
| 25HL0064ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: GUISOCON BR. (B00049NR) ALONG DUMAGUETE SOUTH RD, BAYAWAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱77.1M | 45% | High risk95 | Flagged0.009 |
| 25HF0069ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - TOLEDO-PINAMUNGAHAN- ALOGUINSAN-MANTALONGON RD - K0085 + 500 - K0086 | Region VII | Cebu 3rd DEO | On-Going | ₱81.8M | 92% | High risk95 | Flagged0.003 |
| 25HL0067ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: MANALONGON BR. (B00029NR) ALONG DUMAGUETE SOUTH RD, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱77.1M | 91% | High risk95 | —-0.005 |
| 25HL0066ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: MALADPAD BR. (B00023NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱72.2M | 91% | High risk95 | —-0.006 |
| 25HF0082CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE), POBLACION, BARILI, CEBU | Region VII | Cebu 3rd DEO | On-Going | ₱49.5M | 5% | High risk95 | Flagged0.038 |
| 25HN0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, BARANGAY CAMBARO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱9.9M | 39% | High risk94 | Flagged0.024 |
| 25HN0109SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE (PHASE 3), BARANGAY CAMBARO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱4.9M | 1% | High risk88 | Flagged0.036 |
| 25H00031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU | Region VII | Region VII | On-Going | ₱183.3M | 73% | High risk67 | —-0.009 |
| 24H00007CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU | Region VII | Region VII | Completed | ₱212.3M | 100% | High risk66 | —-0.047 |
| 19O00032RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MAKATI-MANDALUYONG BRIDGE (B04891LZ) ALONG MAKATI- MANDALUYONG BRIDGE, CITIES OF MAKATI AND MANDALUYONG | National Capital Region | National Capital Region | Completed | ₱127M | 100% | High risk65 | —-0.031 |
| 23HF0005CONSTRUCTION OF BARILI - ALOGUINSAN COASTAL ROAD, PHASE 4, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱46.9M | 100% | High risk65 | —-0.030 |
| 24HF0106REHABILITATION OF FLOOD CONTROL STRUCTURE AT CAMANCHILLES RIVER, BRGY. CAPT. CLAUDIO, TOLEDO CITY | Region VII | Cebu 3rd DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.068 |
| 22H00024CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB | Region VII | Region VII | On-Going | ₱193M | 78% | High risk64 | Flagged0.002 |
| 22HF0103ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON RD K0084+200-K0084+900 | Region VII | Cebu 3rd DEO | Completed | ₱38.4M | 100% | High risk64 | —-0.031 |
| 22HF0104ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE ALONG TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD - K0086+784 - K0087+542 | Region VII | Cebu 3rd DEO | Completed | ₱37.9M | 100% | High risk64 | —-0.031 |
| 18H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO CEBU EXPRESSWAY, INCLUDING ROW, CEBU, STA.00+000 TO 02+500, CEBU PROVINCE | Region VII | Region VII | Completed | ₱276.4M | 100% | High risk64 | —-0.034 |
| 18HN0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MACTAN CIRCUMFERENTIAL ROAD, K0022+000 - K0024+000, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | Completed | ₱33.2M | 100% | High risk63 | —-0.030 |
| 18H00057LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, EXPANSION OF RUNWAY AND ALL OTHER STRUCTURES AT CANG-ALWANG AIRPORT TO INCLUDE THE P | Region VII | Region VII | Completed | ₱424.7M | 100% | High risk63 | —-0.033 |
| 23HF0118REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD K0073+960-K0074+122 | Region VII | Cebu 3rd DEO | Completed | ₱101.3M | 100% | High risk62 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HF0082CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE), POBLACION, BARILI, CEBU | Region VII | Cebu 3rd DEO | On-Going | ₱49.5M | 5% | High risk95 | Flagged0.038 |
| 25HN0109SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE (PHASE 3), BARANGAY CAMBARO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱4.9M | 1% | High risk88 | Flagged0.036 |
| 23H00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, BARILI, CEBU | Region VII | Region VII | On-Going | ₱197.8M | 86% | High risk61 | Flagged0.035 |
| 24H00177CONSTRUCTION OF A THREE STOREY BUILDING FOR PS-DBM REGIONAL DEPOT-CEBU | Region VII | Region VII | On-Going | ₱30.1M | 2% | Medium risk47 | Flagged0.025 |
| 25HN0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, BARANGAY CAMBARO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱9.9M | 39% | High risk94 | Flagged0.024 |
| 25HL0065ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: LITID BR. (B00030NR) ALONG DUMAGUETE SOUTH RD, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱72.3M | 29% | High risk95 | Flagged0.013 |
| 24HH0129CONSTRUCTION OF 4STY8CL, PIT-OS NATIONAL HIGH SCHOOL, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱39.1M | 66% | Medium risk49 | Flagged0.011 |
| 25HL0064ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: GUISOCON BR. (B00049NR) ALONG DUMAGUETE SOUTH RD, BAYAWAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱77.1M | 45% | High risk95 | Flagged0.009 |
| 25HF0069ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - TOLEDO-PINAMUNGAHAN- ALOGUINSAN-MANTALONGON RD - K0085 + 500 - K0086 | Region VII | Cebu 3rd DEO | On-Going | ₱81.8M | 92% | High risk95 | Flagged0.003 |
| 22H00024CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB | Region VII | Region VII | On-Going | ₱193M | 78% | High risk64 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25HF0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY JAGBUAYA | Region VII | Cebu 3rd DEO | On-Going | ₱48.7M | 89% | Medium risk51 | —-0.060 |
| 52 | 20HN0019OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAJO-BASAK-MARIGONDON ROAD - K0012+(-1634) - K0012+067, (S00015LP) CHAINAGE 000 - CHAINAGE 1703, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱48.7M | 100% | Medium risk50 | —-0.096 |
| 53 | 23HF0030CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT SAPANGDAKU RIVER (TRIBUTARY AREA), BARANGAY JUAN CLIMACO SR., TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.077 |
| 54 | 24HF010924HF0109 - REHABILITATION OF FLOOD CONTROL STRUCTURE AT CAMANCHILLES RIVER, BRGY. CARMEN-BRGY. CAPT. CLAUDIO, TOLEDO CITY | Region VII | Cebu 3rd DEO | Completed | ₱48.3M | 100% | Medium risk50 | —-0.078 |
| 55 | 22HD0017CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY TACUP, STA. 0+000-STA. 0+774, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.076 |
| 56 | 23HF0006CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BARANGAY TALAVERA, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.077 |
| 57 | 23HF0072CONSTRUCTION OF SOLAR WATER SYSTEM, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.5M | 100% | Medium risk50 | —-0.050 |
| 58 | 24HH0129CONSTRUCTION OF 4STY8CL, PIT-OS NATIONAL HIGH SCHOOL, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱39.1M | 66% | Medium risk49 | Flagged0.011 |
| 59 | 20HF0076A. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CEBU TECHNOLOGICAL UNIVERSITY, BARANGAY CANTUOD, BALAMBAN, CEBU B. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANTUOD CTU SITE, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱17.8M | 100% | Medium risk49 | —-0.094 |
| 60 | 23HF0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING) TUBURAN, CEBU (PHASE V) | Region VII | Cebu 3rd DEO | Completed | ₱14.8M | 100% | Medium risk49 | —-0.094 |
| 61 | 20H00013CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF BALAMBAN MUNICIPAL POLICE STATION, BALAMBAN, CEBU | Region VII | Region VII | Completed | ₱9.7M | 100% | Medium risk48 | —-0.092 |
| 62 | 25HF0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND P | Region VII | Cebu 3rd DEO | On-Going | ₱4.9M | 23% | Medium risk48 | —-0.007 |
| 63 | 20HN0094LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - IMPROVEMENT OF MULTI-PURPOSE BUILDING, NATIONAL POLICE TRAINING INSTITUTE, CAMP JESSE M. ROBREDO, REGIONAL TRAINING CENTER, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 64 | 20HA0128CONSTRUCTION OF TUBIGON WATER SUPPLY, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱14.8M | 100% | Medium risk48 | —-0.060 |
| 65 | 18HN0034CONSTRUCTION OF MULTI-PURPOSE BUILDING , BRGY. BANKAL, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.085 |
| 66 | 22HF0018NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BARILI-ALOGUINSAN BYPASS RD | Region VII | Cebu 3rd DEO | Completed | ₱44.5M | 100% | Medium risk47 | —-0.093 |
| 67 | 25HF0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY DA | Region VII | Cebu 3rd DEO | Completed | ₱42.5M | 100% | Medium risk47 | —-0.095 |
| 68 | 23HF0070ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SANTANDER-BARILI-TOLEDO RD - K0064+571 - K0064+610, K0065+533 - K0065+621 | Region VII | Cebu 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.096 |
| 69 | 25HF0068ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CEBU-TOLEDO WHARF RD (ULING-TOLEDO WHARF) - K0054 + 525 - K0055 + 00 | Region VII | Cebu 3rd DEO | On-Going | ₱31.1M | 74% | Medium risk47 | —-0.055 |
| 70 | 20HM0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, SIQUIJOR-SAN ANTONIO-CAMPALANAS ROAD LEADING TO RORO PORT, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.089 |
| 71 | 25HH0041OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - TERTIARY ROADS - BORROMEO ST.-(S00079CB) - CHAINAGE 000 - CHAINAGE 645, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱45.4M | 9% | Medium risk47 | —-0.031 |
| 72 | 23HF0023REHABILITATION OF MULTI-PURPOSE BUILDING BARANGAY BALAO, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.093 |
| 73 | 21HN0140LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) IN CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.090 |
| 74 | 22HF0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, STA. 0+449 - STA. 0+698, BRGY. TALAVERA, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱44.3M | 100% | Medium risk47 | —-0.078 |
| 75 | 25O00008RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAKATI-MANDALUYONG BR. (B04891LZ) ALONG MAKATI-MANDALUYONG BR. | National Capital Region | National Capital Region | On-Going | ₱19.1M | 1% | Medium risk47 | —-0.009 |