Opening the dossier…
Opening the dossier…
Contractor dossier
216 projects on file, including joint ventures this contractor is part of.
Total projects
216
Total budget
₱8.4B
Average progress
95.3%
Completion rate
92.6%
Average risk score
48.5
Medium risk on average, out of 100
Flagged as unusual
15
6.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 205 | ₱7.7B | 48.1 | 14 | 95.0% |
| Region I | 9 | ₱614.5M | 55.5 | 0 | 100.0% |
| Cordillera Administrative Region | 2 | ₱125.8M | 55.1 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 98 | ₱2.9B | 45.8 | 12 | 91.6% |
| Roads | 80 | ₱3.7B | 49.7 | 1 | 97.5% |
| Flood Control and Drainage | 27 | ₱1.1B | 50.0 | 2 | 100.0% |
| Bridges, Roads | 5 | ₱435.3M | 56.3 | 0 | 100.0% |
| OTHER | 3 | ₱141.6M | 76.1 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱66.2M | 51.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19B00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, TUGUEGARAO-SOLANA DIVERSION ROAD, CAGAYAN | Region II | Region II | Completed | ₱96.1M | 100% | High risk84 | —-0.001 |
| 22BE0014ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (LZ) - KO406+342-KO408+000, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱25M | 100% | High risk77 | —-0.025 |
| 17B00020MFO 1: NATIONAL ROAD NETWORK SERVICES: NETWORK DEVELOPMENT: IMPROVEMENT/WIDENING OF NATIONAL ROAD-OTHER PRIMARY ROADS ALONG SANTIAGO-TUGUEGARAO ROAD, K0423+845.8- K0429+192.70=STA. 423+816.6-STA. 429+226, STA. MARIA, ISABELA | Region II | Region II | Completed | ₱182.6M | 100% | High risk69 | —-0.019 |
| 17BC0080MFO 3 MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES-CONST./IMPRV'T OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS & DECLARED TOURISM DESTINATIONS-OUR LADY OF PIAT DIVERSION ROAD INCLUDING BRIDGE AND APPROACHES, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱46.5M | 100% | High risk68 | —-0.040 |
| 17B00017MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L RD. PRIMARY ALONG PRIMARY ROADS N1 CAGAYAN VALLEY RD, K0471+120 TO K0473+520,K0485+000 TO K0485+300, K0487+660 TO K0488+700, K0488+900 TO K0489+016.70, TUGUEGARAO AND IGUIG, CAGAY | Region II | Region II | Completed | ₱113.9M | 100% | High risk68 | —-0.029 |
| 20B00026ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, ALCALA-STO. NIÑO-LASAM ROAD (NAMUCCAYAN BRIDGE), STO NIÑO, CAGAYAN | Region II | Region II | On-Going | ₱353M | 91% | High risk67 | Flagged0.043 |
| 17BD0065MFO1: NAT'L. ROAD NETWORK SERVICES: NETWORK DEVT.: WIDENING OF NAT'L. ROAD ALONG TERTIARY ROADS ALONG CAR,K0498+000-K0500+500,K0502+800-K0503+887, BRGY. GEN. BALAO, SAMPAGUITA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱90.9M | 100% | High risk67 | —-0.029 |
| 17BD0066MF01: NAT'L. ROAD NETWORK SERVICES: NETWORK DEV'T.: WIDENING OF NAT'L. ROAD ALONG TERTIARY ROADS ALONG CAR, K0503+887-K0506+800, BRGY. SAMPAGUITA, VILLA REY, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱63.6M | 100% | High risk67 | —-0.035 |
| 17BC0003MFO-1 NATIONAL ROAD NETWORK SERVICES (UNPAVED TO PAVED)BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK TO UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) CADCADIR-KABUGAO ROAD, K0605+699- K0606+440 | Region II | Cagayan 2nd DEO | Completed | ₱20.5M | 100% | High risk67 | —-0.022 |
| 23B00038OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NAGANTATAPIAN BRIDGE (B01094LZ) ALONG CAGAYAN VALLEY ROAD | Region II | Region II | On-Going | ₱119.7M | 98% | High risk66 | Flagged0.003 |
| 23B00065OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS; ALCALA-STO. NIÑO-LASAM ROAD, CAGAYAN, CAGAYAN-PACKAGE 2, CAGAYAN | Region II | Region II | On-Going | ₱113.3M | 33% | High risk65 | Flagged0.018 |
| 17BC0079MFO 1 NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING GAPS CONNECTING ROADS, INCLUDING ROW AYAGA-STA MARCELA-FLORA-LASAM-ROAD, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱92.6M | 100% | High risk65 | —-0.032 |
| 17BC0224CONSTRUCTION OF CAGAYAN RIVER CONTROL PROJECT STA 0+000 - STA 0+220, CALLAO SUR, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱43M | 100% | High risk65 | —-0.039 |
| 20BC0023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGAYAN RIVER CONTROL, CALLAO SUR, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱24.5M | 100% | High risk64 | —-0.031 |
| 17BC0017MFO-1: NATIONAL ROAD NETWORK SERVICES NETWORK DEVELOPMENT OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CAGAYAN-APAYAO ROAD, K0513+000 - K0517+819, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱47.7M | 100% | High risk64 | —-0.044 |
| 17BC0021MFO 2. FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG CHICO RIVER, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱33.8M | 100% | High risk64 | —-0.037 |
| 18BD0143ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, PINACANAUAN BRIDGE (B01910LZ) ALONG CAGAYAN VALLEY ROAD, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱95.5M | 100% | High risk64 | —-0.018 |
| 17BC0004MFO 1 NATIONAL ROAD NETWORK SERVICES: ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK TO UPGRADING TO PAVED ROAD STANDARDS ( HDM-4 PROJECT ANALYSIS) ALONG SAMPAGUITA-WARAT LA SUERTE-CATARAUAN-AFUSING ROAD, PAIT, CAG. | Region II | Cagayan 2nd DEO | Completed | ₱14.4M | 100% | High risk63 | —-0.054 |
| 20BC0054CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-ACCESS ROAD CONNECTING VILLAREY SUGAR CANE AREA AND FACTORY SITE IN SUPPORT OF SUGAR MILLING INDUSTRY, VILLAREY AND STO. DOMINGO, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱14.7M | 100% | High risk63 | —-0.054 |
| 18B00056CONVERGENCE AND SUPPORT PROGRAM: CONST'N/IMPV'T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROADS LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD) - BRIDGE CONSTRUCTION, BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN | Region II | Region II | Completed | ₱250.9M | 100% | High risk63 | —-0.018 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20B00026ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, ALCALA-STO. NIÑO-LASAM ROAD (NAMUCCAYAN BRIDGE), STO NIÑO, CAGAYAN | Region II | Region II | On-Going | ₱353M | 91% | High risk67 | Flagged0.043 |
| 19B00036OO 1: CONST'N OF MISSING LINKS/NEW ROADS SAN JOSE-QUIBAL ROAD INCLUDING ROW AND SLOPE PROTECTION, CAGAYAN, SECT. 1 : STA. 0+000-STA. 0+067.73; SECT 2: STA. 0+000-STA. 0+542.50; SECT 3 : STA. 0+000-STA. 0+963.74, PEÑABLANCA, CAGAYAN | Region II | Region II | On-Going | ₱96.7M | 0% | Medium risk58 | Flagged0.022 |
| 25B00135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - NAMAMPARAN BR. (B01241LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱3.8M | 0% | Medium risk32 | Flagged0.019 |
| 23B00065OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS; ALCALA-STO. NIÑO-LASAM ROAD, CAGAYAN, CAGAYAN-PACKAGE 2, CAGAYAN | Region II | Region II | On-Going | ₱113.3M | 33% | High risk65 | Flagged0.018 |
| 17PL0221PACKAGE 7: A) BRGY LUCOG FLOOD CONTROL ALONG CHICO RIVER, BRGY. LUCOG, TABUK CITY B) SUYANG FLOOD CONTROL ALONG CHICO RIVER, SUYANG, TABUK CITY | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱75.2M | 100% | Medium risk58 | Flagged0.014 |
| 16BC0073RESTORATION/PROVISION FOR SLOPE PROTECTION(LANDSLIDE SECTION) ALONG CADCADIR KABUGAO ROAD (LEFT SIDE),K0604+160-K0604+600, STA PRAXEDES, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱29.3M | 100% | Medium risk51 | Flagged0.012 |
| 18BD0101RECONSTRUCTION OF CABBO-CABASAN BRIDGE, CABBO, PEÑA. CAGAYAN VALLEY, CABBO, PEÑA. CAGAYAN VALLEY | Region II | Cagayan 3rd DEO | Completed | ₱73.9M | 100% | Medium risk53 | Flagged0.009 |
| 23B00050OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: PINGKIAN BR. (B01862LZ) ALONG NUEVA VIZCAYA - BENGUET RD | Region II | Region II | On-Going | ₱156.4M | 92% | High risk63 | Flagged0.007 |
| 24BC0129ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALCALA-SANTO NIÑO-LASAM ROAD (TAMUCCO BRIDGE), SANTO NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱42.9M | 21% | Medium risk50 | Flagged0.006 |
| 23B00038OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NAGANTATAPIAN BRIDGE (B01094LZ) ALONG CAGAYAN VALLEY ROAD | Region II | Region II | On-Going | ₱119.7M | 98% | High risk66 | Flagged0.003 |
| 25B00099OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - APAD BR. 1 (B01233LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱1.8M | 8% | Low risk23 | Flagged0.002 |
| 25B00136OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CALITLITAN BR. (B01220LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱4.3M | 0% | Low risk30 | Flagged0.002 |
| 25B00137OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CONSUELO BR. (B01216LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱4.3M | 0% | Low risk30 | Flagged0.002 |
| 25B00114OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ABIAN BR. (B01226LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱9.3M | 0% | Medium risk46 | Flagged0.001 |
| 25B00134OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BALILING BR. (B01217LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱11.3M | 0% | Medium risk46 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19BC0182BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES BAGU BR. (B01021LZ) ALONG MANILA NORTH ROAD, PAMPLONA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.038 |
| 127 | 18BC0105WIDENING OF PERMANENT BRIDGES-LANGAGAN BR. (B01011LZ) ALONG MANILA NORTH RD AT SANCHEZ MIRA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱15.2M | 100% | Medium risk47 | —-0.036 |
| 128 | 22BB0128CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER, BRGY. CENTRO, LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱49.4M | 100% | Medium risk47 | —-0.060 |
| 129 | 21BC0073CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADE INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-CENTRO 2-NAGBARANGANAN-CAGAYAN STATE UNIVERSITY ROAD CONNECTING TO CACAO PLANTATION AREA IN SUPPORT OF CACAO INDUSTRY, CENTRO 2, SANCHEZ MIRA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱28.7M | 100% | Medium risk47 | —-0.039 |
| 130 | 22BB0126CSSP - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF WATERWAY STRUCTURE ALONG RIVERBANKS, BARANGAY CATAYAUAN (DOWNSTREAM), LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱47.8M | 100% | Medium risk46 | —-0.047 |
| 131 | 22BB0125CSSP - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF WATERWAY STRUCTURE ALONG RIVERBANKS, BARANGAY CATAYAUAN (UPSTREAM), LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱47.8M | 100% | Medium risk46 | —-0.047 |
| 132 | 23BJ0039NETWORK DEVELOPMENT PROGRAM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES BENAY BRIDGE (B01253LZ) ALONG ARITAO-QUIRINO ROAD, BAGUMBAYAN, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱38.3M | 100% | Medium risk46 | —-0.047 |
| 133 | 23BI0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-BRIDGE PROGRAM- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-INDIANA BR.(B01225LZ) ALONG DAANG MAHARLIKA (LZ) | Region II | Nueva Vizcaya DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.047 |
| 134 | 19BC0029CSSP-CONST./IMPVT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES-ACCESS ROAD CONNECTING TO VILLAREY SUGAR CANE AREA AND FACTORY SITE IN SUPPORT OF SUGAR MILLING INDUSTRY, VILLAREY AND STO. DOMINGO, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.082 |
| 135 | 18BC0104WIDENING OF PERMANENT BRIDGES-NAGRANGTAYAN BR. (B01009LZ) ALONG MANILA NORTH RD AT SANCHEZ MIRA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.036 |
| 136 | 18BC0062CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES-ACCESS ROAD CONNECTING VILLAREY SUGAR CANE AREA AND FACTORY SITE IN SUPPORT OF SUGAR MILLING INDUSTRY | Region II | Cagayan 2nd DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.082 |
| 137 | 22BC0032OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF STO. TOMAS FLOOD CONTROL ALONG ABULUG RIVER (STA. 15+162-STA. 15+412 L/S), ABU | Region II | Cagayan 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.062 |
| 138 | 24BC0086OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF SIMAYUNG FLOOD CONTROL ALONG ABULUG RIVER,ABULUG,CAGAY | Region II | Cagayan 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.063 |
| 139 | 18BC0034REHABILITATION/MAJOR AREA OF PERMANENT BRIDGES-ALANNAY BR (B01061LZ) ALONG JCT.LOGAC-LASAM-GAGABUTAN ROAD. | Region II | Cagayan 2nd DEO | Completed | ₱7.6M | 100% | Medium risk46 | —-0.042 |
| 140 | 19BC0027CONST./IMPVT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-ACCESS ROAD CONNECTING INFRONT OF CSU ROAD AND MAGUILLING SUGARCANE AREA AND FACTORY SITE IN SUPPORT OF SUGAR MILLING INDUSTRY, MAGUILLING & STO. DOMINGO, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.082 |
| 141 | 21BC0086LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF BOX CULVERT, BARANGAY NAMUCCAYAN, STO. NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.057 |
| 142 | 25B00114OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ABIAN BR. (B01226LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱9.3M | 0% | Medium risk46 | Flagged0.001 |
| 143 | 25B00134OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BALILING BR. (B01217LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱11.3M | 0% | Medium risk46 | Flagged0.001 |
| 144 | 18BC0054NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-MANILA NORTH ROAD K0657+000-K0660+600 | Region II | Cagayan 2nd DEO | Completed | ₱68.3M | 100% | Medium risk46 | —-0.069 |
| 145 | 23BC0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF CENTRO LASAM FLOOD CONTROL ALONG ZINUNDUNGAN RIVER, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱48.9M | 100% | Medium risk46 | —-0.064 |
| 146 | 21BC0046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - PRIMARY ROADS- MANILA NORTH ROAD, K0660+620-K0662+069, PAMPLONA-ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱57.1M | 100% | Medium risk46 | —-0.069 |
| 147 | 18BC0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CHICO RIVER FLOOD CONTROL MAQUILLING PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.067 |
| 148 | 18BC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ACCESS ROAD FROM SHRINE OF OUR LADY OF PIAT TO AQUIB-DUGAYONG BRIDGE TO GUMARUENG CAGAYAN APAYAO NATIONAL ROAD | Region II | Cagayan 2nd DEO | Completed | ₱38M | 100% | Medium risk46 | —-0.080 |
| 149 | 19BC0170ASSET PRESERVATION-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS- PAVING OF UNPAVED ROADS-JCT. AYAGA ( ABULUG)-BALLESTEROS-APARRI ROAD K0683+842-K0688+404, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱57.9M | 100% | Medium risk45 | —-0.073 |
| 150 | 19BC0167CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF SANCHEZ MIRA FLOOD CONTROL, SANCHEZ MIRA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱50.3M | 100% | Medium risk45 | —-0.055 |