Contractor dossier
7 projects on file, including joint ventures this contractor is part of.
Total projects
7
Total budget
₱407.9M
Average progress
99.1%
Completion rate
71.4%
Average risk score
41.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 5 | ₱308.9M | 37.5 | 0 | 98.8% |
| Region XI | 2 | ₱99M | 52.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4 | ₱320.4M | 47.6 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱82.5M | 40.4 | 0 | 96.9% |
| Buildings and Facilities | 1 | ₱5M | 20.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24M00223CONSTRUCTIONS OF RIVER BANK PROTECTION WITH ESPLANADE ALONG ALTAYAN RIVER, STA 0+000 - STA 0+200; STA 0+000 - STA 0+160.473, BRGY. PULABATO, PULABATO, TAMPAKAN, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱48.3M | 94% | Medium risk56 | —-0.013 |
| 2 | 24M002271. ASPHALT OVERLAY - FROM JUNCTION OF MARBEL MAKAR ROAD STA K1708+270 (0+000-2+000) TO COLUMBIO BYPASS ROAD, KORONADAL CITY;2. ASPHALT OVERLAY - FROM JUNCTION OF MARBEL MAKAR ROAD STA K1708+270 (2+000-4+000) TO COLUMBIO BYPASS, KORONADAL CITY | Region XII | Region XII | On-Going | ₱163.6M | 100% | Medium risk54 | —-0.036 |
| 3 | 24LD0096CONSTRUCTION OF ROAD, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.088 |
| 4 | 24LD0098CONSTRUCTION OF ROAD, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.088 |
| 5 | 24MG0098CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1762+460-K1762+848,K1762+860-K1762+980,K1763+060-K1763+600,K1764+375-K1764+454,K1764+582-K1764+689,K1764+945-K1765+018,K1766+140-K1766+211,K1766+255-K1766+295,K1766+360-K1766+67 | Region XII | South Cotabato 2nd DEO | Completed | ₱57.9M | 100% | Medium risk33 | —-0.085 |
| 6 | 25MG0084CONSTRUCTION OF RIVERBANK PROTECTION ALONG MARBEL RIVER, BRGY. SARAVIA, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱34.2M | 100% | Low risk24 | —-0.072 |
| 7 | 24MG0125CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. KUSAN, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱5M | 100% | Low risk20 | —-0.087 |