Contractor dossier
94 projects on file, including joint ventures this contractor is part of.
Total projects
94
Total budget
₱1.6B
Average progress
96.5%
Completion rate
85.1%
Average risk score
44.9
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 82 | ₱746.1M | 40.2 | 0 | 100.0% |
| Region III | 12 | ₱859.6M | 77.2 | 0 | 72.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 37 | ₱249.9M | 40.1 | 0 | 100.0% |
| Roads | 28 | ₱468.2M | 45.9 | 0 | 100.0% |
| Water Provision and Storage | 15 | ₱48.4M | 30.0 | 0 | 100.0% |
| Flood Control and Drainage | 11 | ₱810.7M | 77.7 | 0 | 69.8% |
| Bridges | 2 | ₱25.9M | 40.3 | 0 | 100.0% |
| OTHER | 1 | ₱2.5M | 66.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25C00362FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (UPSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 76% | High risk81 | —-0.019 |
| 25C00372FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (DOWNSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 97% | High risk81 | —-0.026 |
| 25CP0092CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25CP0093CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. CAMACHILE, DONA REMEDIO | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 88% | High risk81 | —-0.022 |
| 25CP0098CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS .PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEG. A (SIOJO ST. SEC.), | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 25CP0099CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTS. PRTOTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT B (SIOJO ST. SEC.) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 25CP0097CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONS. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER (DOWNSTREAM), SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.6M | 64% | High risk74 | —-0.020 |
| 25CP0096CONVERG. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 73% | High risk74 | —-0.024 |
| 25CP0030FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BULO RIVER, BRGY. KING KABAYO, MIGUEL, BULACAN, PHASE I | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 77% | High risk73 | —-0.027 |
| 25CP0146CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT. | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 20% | High risk73 | —-0.010 |
| 25CP0147CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP- FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS/FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT, PUROK 2, BARANGAY SIBUL, SAN MIGUEL, BULACAN (UPST | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 44% | High risk73 | —-0.018 |
| 24C00509BASIC INFRASTRUCTURE PROGRAM-BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MARONQUILLO-PASONG BANGKAL ROAD, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.9M | 100% | High risk72 | —-0.041 |
| 25FN0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE RAIN WATER COLLECTOR SYSTEM (RWCS) | Region V | Camarines Sur 5th DEO | On-Going | ₱2.5M | 100% | High risk66 | —-0.016 |
| 17FD0029CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CAMBALIDIO, LIBMANAN, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.1M | 100% | High risk62 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25C00362FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (UPSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 76% | High risk81 | —-0.019 |
| 2 | 25C00372FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (DOWNSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 97% | High risk81 | —-0.026 |
| 3 | 25CP0092CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 4 | 25CP0093CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. CAMACHILE, DONA REMEDIO | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 88% | High risk81 | —-0.022 |
| 5 | 25CP0098CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS .PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEG. A (SIOJO ST. SEC.), | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 6 | 25CP0099CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTS. PRTOTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT B (SIOJO ST. SEC.) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 7 | 25CP0097CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONS. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER (DOWNSTREAM), SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.6M | 64% | High risk74 | —-0.020 |
| 8 | 25CP0096CONVERG. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 73% | High risk74 | —-0.024 |
| 9 | 25CP0030FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BULO RIVER, BRGY. KING KABAYO, MIGUEL, BULACAN, PHASE I | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 77% | High risk73 | —-0.027 |
| 10 | 25CP0146CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT. | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 20% | High risk73 | —-0.010 |
| 11 | 25CP0147CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP- FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS/FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT, PUROK 2, BARANGAY SIBUL, SAN MIGUEL, BULACAN (UPST | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 44% | High risk73 | —-0.018 |
| 12 | 24C00509BASIC INFRASTRUCTURE PROGRAM-BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MARONQUILLO-PASONG BANGKAL ROAD, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.9M | 100% | High risk72 | —-0.041 |
| 13 | 25FN0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE RAIN WATER COLLECTOR SYSTEM (RWCS) | Region V | Camarines Sur 5th DEO | On-Going | ₱2.5M | 100% | High risk66 | —-0.016 |
| 14 | 17FD0029CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CAMBALIDIO, LIBMANAN, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.1M | 100% | High risk62 | —-0.066 |
| 15 | 21FE0028LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF PEDESTRIAN REFUGE ALONG DAANG MAHARLIKA (LZ) (S03523LZ), SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk55 | —-0.093 |
| 16 | 21FE0012(CLUSTERED PROJECTS) LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - A. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CAWAYAN, LIBMANAN, CAMARINES SUR, B. CONSTRUCTION OF MULTI-PURPOSE BUI | Region V | Camarines Sur 2nd DEO | Completed | ₱29.5M | 100% | Medium risk55 | —-0.095 |
| 17 | 20FE0083LP:LOCAL ROADS AND BRIDGES -LOCAL ROADS-CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCL. LOCAL PROJECTS-CONST. OF SAN ANTONIO ROAD, MILAOR, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱28.5M | 100% | Medium risk54 | —-0.101 |
| 18 | 20FE0122LP:LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF TANAG ROAD, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱28.8M | 100% | Medium risk53 | —-0.100 |
| 19 | 22FE0048CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CAMAMBUGAN ROAD, BRGY. CAMAMBUGAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱28.8M | 100% | Medium risk53 | —-0.098 |
| 20 | 23FE0054OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0410 + 550 - K0411 + 000 | Region V | Camarines Sur 2nd DEO | Completed | ₱20.4M | 100% | Medium risk52 | —-0.098 |
| 21 | 23FE0041CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk52 | —-0.099 |
| 22 | 23FE0039CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BRGY. PATONG, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱24.3M | 100% | Medium risk52 | —-0.101 |
| 23 | 22FE0059CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱14.4M | 100% | Medium risk52 | —-0.099 |
| 24 | 22FD0002WIDENING OF PERMANENT BRIDGE, PACULAGO BR. 2 (B00442LZ) ALONG ROLANDOA ANDAYA HIGHWAY | Region V | Camarines Sur 1st DEO | Completed | ₱23.5M | 100% | Medium risk52 | —-0.063 |
| 25 | 23FE0027CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SITIO BALID - SITIO CANAMOAN I - SITIO CANAMOAN II ROAD, B | Region V | Camarines Sur 2nd DEO | Completed | ₱24.3M | 100% | Medium risk52 | —-0.100 |