Contractor dossier
21 projects on file, including joint ventures this contractor is part of.
Total projects
21
Total budget
₱628.3M
Average progress
95.9%
Completion rate
81.0%
Average risk score
47.1
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 21 | ₱628.3M | 47.1 | 0 | 95.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 12 | ₱265.8M | 45.3 | 0 | 94.8% |
| Flood Control and Drainage | 4 | ₱268.7M | 54.1 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱7.9M | 29.3 | 0 | 91.7% |
| GAA 2025 SSP | 1 | ₱57.7M | 93.6 | 0 | 100.0% |
| Bridges | 1 | ₱28.3M | 47.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DO0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATIONOF ROAD LEADING TO SANI | Region IV-A | Rizal 2nd DEO | On-Going | ₱57.7M | 100% | High risk94 | —-0.006 |
| 22DO0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PURAY RIVER, .... | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.073 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DO0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATIONOF ROAD LEADING TO SANI | Region IV-A | Rizal 2nd DEO | On-Going | ₱57.7M | 100% | High risk94 | —-0.006 |
| 2 | 22DO0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PURAY RIVER, .... | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.073 |
| 3 | 24DO0037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0046+060 - K0047+000, K0048+000 - K0048 +305, K0051+000 - K0052+000 | Region IV-A | Rizal 2nd DEO | Completed | ₱56.4M | 100% | Medium risk54 | —-0.098 |
| 4 | 25DO0004ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY GUITNANGBAYAN II, SA | Region IV-A | Rizal 2nd DEO | Completed | ₱76.4M | 100% | Medium risk53 | —-0.083 |
| 5 | 22DO0018ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TERESA RIVER, BRGY. SAN | Region IV-A | Rizal 2nd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.074 |
| 6 | 25DO0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PINTONG BUKAWE, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.8M | 75% | Medium risk52 | —-0.060 |
| 7 | 25DO0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD AND DRAINAGE (REI | Region IV-A | Rizal 2nd DEO | On-Going | ₱47M | 45% | Medium risk51 | —-0.058 |
| 8 | 22DO0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS - REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) OF ....... | Region IV-A | Rizal 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.102 |
| 9 | 22DO0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - WIDENING (COMPLETION) OF PERMANENT BRIDGES - TANAY BR. (B02856LZ) SAGBAT-PILILLA DIV. RD | Region IV-A | Rizal 2nd DEO | Completed | ₱28.3M | 100% | Medium risk48 | —-0.064 |
| 10 | 21DO0040LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION /IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) AT MARIKINA-INFANTA ROAD KM 0055+400 - K 0058+400 TANAY RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.103 |
| 11 | 20DN0003CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ILOG PUGAD CREEK TAYTAY, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.089 |
| 12 | 24DO0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY SAN JOSE, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.106 |
| 13 | 21DO0015LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD AT SOUTHVILLE 8B, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.107 |
| 14 | 20DN0008ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, CORAZON C. AQUINO AVE., - K0025+406 - K0025+750, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.108 |
| 15 | 20DN0102REHABILITATION OF ROAD AND DRAINAGE SYSTEM, SAPINIT RD., BRGY. SAN JUAN ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.107 |
| 16 | 22DN0025CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, ROAD LEADING TO CANUMAY NHS, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 93% | Medium risk46 | —-0.045 |
| 17 | 21DO0059LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ASPAHLT OVERLAY AT BRGY. SAN ROQUE, CARDONA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.105 |
| 18 | 19DO0091CONCRETING OF BRGY. MASCAP-PURAY FMR, BRGY. MASCAP RODRIGUEZ RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.052 |
| 19 | 19DO0055LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGAM- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. STA. ANA, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.100 |
| 20 | 19DO0066LOCAL PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF ROAD, BRGY. SAN JOSE, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 21 | 18DO0147COMPLETION OF SCHOOL BUILDING AT BARAS PINUGAY NHS, BARAS, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱657.5K | 100% | Low risk13 | —-0.055 |