Contractor dossier
10 projects on file, including joint ventures this contractor is part of.
Total projects
10
Total budget
₱447.2M
Average progress
100.0%
Completion rate
100.0%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 10 | ₱447.2M | 42.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 5 | ₱321.3M | 43.2 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱6.6M | 23.2 | 0 | 100.0% |
| OTHER | 1 | ₱37M | 73.8 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱67.6M | 42.7 | 0 | 100.0% |
| Bridges | 1 | ₱14.7M | 41.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24ND0027TUNGAO PARALLEL BR. ALONG BUTUAN CITY-MALAYBALAY RD | Region XIII | Butuan City DEO | Completed | ₱37M | 100% | High risk74 | —-0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24ND0027TUNGAO PARALLEL BR. ALONG BUTUAN CITY-MALAYBALAY RD | Region XIII | Butuan City DEO | Completed | ₱37M | 100% | High risk74 | —-0.025 |
| 2 | 23N00022ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱72.4M | 100% | Medium risk46 | —-0.085 |
| 3 | 24ND0127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE, BILAY-DULAG SECTION (AGUSAN BRIDGE), CONNECTING DAANG MAHARLIKA (ALTERNATE ROUTE), AFGA-EL RIO SECTION (PHASE-1), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱96.5M | 100% | Medium risk46 | —-0.079 |
| 4 | 24N00048NRJ DAANG MAHARLIKA (TAGUIBO SECTION) - MASAO PORT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱88.8M | 100% | Medium risk44 | —-0.080 |
| 5 | 24NC0029CONSTRUCTION OF SIMULAO RIVER BANK PROTECTION, NEAR STA. MARIA BRIDGE APPROACH BUPSTREAM, PHASE II, TRENTO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱67.6M | 100% | Medium risk43 | —-0.055 |
| 6 | 18ND0032RETROFITTING/STRENGTHENING OF MAGSAYSAY BRIDGE (B01723MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN MISAMIS OR RD), BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱14.7M | 100% | Medium risk41 | —-0.050 |
| 7 | 23NA0052CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-ACCESS ROAD LEADING TO NASIPIT AGUSAN DEL NORTEINDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE SEZ), NASIPIT, AGUSAN DEL NORTE PACKAGE II | Region XIII | Agusan del Norte DEO | Completed | ₱44.1M | 100% | Medium risk41 | —-0.088 |
| 8 | 20ND0041CONSTRUCTION OF NRJ AGUSAN-MALAYBALAY ROAD - BRGY. AMBACON - BRGY. MALICATO - NRJ DAANG MAHARLIKA, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.086 |
| 9 | 17N00160CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) CONSUELO ES, BUGABOS ES, F.S. OMAYANA ES, DULAG ES, MABUHAY ES, SAN MATEO ES, BANCASI ES, FRANCISCO T. MAGNO SR. ES, AMBAGO CENTRAL ES, LUMBOCAN ES, LUMBOCAN NHS, MASAO ES, PEDRO D. DUNCANO NHS, CABCABO | Region XIII | Region XIII | Completed | ₱3M | 100% | Low risk29 | —-0.027 |
| 10 | 19N00147CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM 2019, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱3.5M | 100% | Low risk17 | —-0.045 |