Contractor dossier
172 projects on file, including joint ventures this contractor is part of.
Total projects
172
Total budget
₱6.7B
Average progress
96.0%
Completion rate
82.0%
Average risk score
46.2
Medium risk on average, out of 100
Flagged as unusual
6
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 172 | ₱6.7B | 46.2 | 6 | 96.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 111 | ₱4.3B | 46.0 | 2 | 99.0% |
| Buildings and Facilities | 32 | ₱458.4M | 29.3 | 0 | 96.0% |
| Flood Control and Drainage | 10 | ₱997.3M | 57.1 | 0 | 77.5% |
| Bridges | 7 | ₱164.9M | 45.6 | 0 | 95.7% |
| OTHER | 6 | ₱478.7M | 74.9 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱173.5M | 95.0 | 2 | 55.0% |
| GAA 2025 OO-1 | 2 | ₱102M | 92.2 | 1 | 81.9% |
| GAA 2025 OO-2 | 1 | ₱91.2M | 91.2 | 0 | 81.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 25KN0038CONSTRUCTION OF ROAD, BARANGAY NINOY AQUINO, KALILANGAN, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱19.2M | 95% | High risk95 | —-0.000 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
| 25KB0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1573+350-K1573+450, K1603+435-1603+470, K1604+890-K1604+910, KITAOTAO & DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱46.3M | 89% | High risk91 | —-0.006 |
| 25KB0017CONSTRUCTION OF REVETMENT DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 81% | High risk91 | —-0.009 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 23KB0059CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY RD. K1594+056-K1594+340, K1594+390-K1594+440, K1594+440-K1594+593, K1594+593-K1594+729, K1594+858-K1594+944, K1595+073-K1595+129, K1595+129-K1595+340, K1595+340-K1595+415, K1595+4 | Region X | Bukidnon 2nd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.032 |
| 24KB0035CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱91.7M | 100% | High risk75 | —-0.023 |
| 23K00201CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION) BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱85.3M | 100% | High risk75 | —-0.024 |
| 23K00299CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (OLD DAMULOG - MIGCAWAYAN) BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱85.7M | 100% | High risk75 | —-0.026 |
| 23KB0055CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON PACKAGE 2, DOLOGON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱52.5M | 100% | High risk75 | —-0.037 |
| 24KA0069CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, BRGY. MAGKALUNGAY, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱144.8M | 100% | High risk63 | —-0.051 |
| 24KA0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱141.9M | 100% | High risk63 | —-0.052 |
| 25KA0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱124.5M | 65% | High risk62 | —-0.017 |
| 25KA0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.1M | 63% | High risk62 | —-0.014 |
| 25KA0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 1), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 41% | High risk61 | —-0.010 |
| 25KA0041CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 61% | High risk61 | —-0.013 |
| 25KA0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE 2), BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, BRGY. LAGUITAS, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱123.3M | 45% | High risk61 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 24KB0167CONCRETING OF BRGY. SAN MIGUEL FMR, BRGY. SAN MIGUEL, MARAMAG, BUIKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱29.6M | 98% | Medium risk47 | Flagged0.010 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 24KB0198CONSTRUCTION OF FARM-TO-MILL ROAD, BRGY. SAN JOSE (PHASE 3) TO OADI, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱17.4M | 100% | Medium risk46 | Flagged0.003 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 2 | 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 3 | 25KN0038CONSTRUCTION OF ROAD, BARANGAY NINOY AQUINO, KALILANGAN, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱19.2M | 95% | High risk95 | —-0.000 |
| 4 | 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
| 5 | 25KB0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1573+350-K1573+450, K1603+435-1603+470, K1604+890-K1604+910, KITAOTAO & DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱46.3M | 89% | High risk91 | —-0.006 |
| 6 | 25KB0017CONSTRUCTION OF REVETMENT DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 81% | High risk91 | —-0.009 |
| 7 | 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 8 | 23KB0059CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY RD. K1594+056-K1594+340, K1594+390-K1594+440, K1594+440-K1594+593, K1594+593-K1594+729, K1594+858-K1594+944, K1595+073-K1595+129, K1595+129-K1595+340, K1595+340-K1595+415, K1595+4 | Region X | Bukidnon 2nd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.032 |
| 9 | 24KB0035CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱91.7M | 100% | High risk75 | —-0.023 |
| 10 | 23K00201CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION) BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱85.3M | 100% | High risk75 | —-0.024 |
| 11 | 23K00299CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (OLD DAMULOG - MIGCAWAYAN) BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱85.7M | 100% | High risk75 | —-0.026 |
| 12 | 23KB0055CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON PACKAGE 2, DOLOGON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱52.5M | 100% | High risk75 | —-0.037 |
| 13 | 24KA0069CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, BRGY. MAGKALUNGAY, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱144.8M | 100% | High risk63 | —-0.051 |
| 14 | 24KA0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱141.9M | 100% | High risk63 | —-0.052 |
| 15 | 25KA0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱124.5M | 65% | High risk62 | —-0.017 |
| 16 | 25KA0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.1M | 63% | High risk62 | —-0.014 |
| 17 | 25KA0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 1), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 41% | High risk61 | —-0.010 |
| 18 | 25KA0041CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 61% | High risk61 | —-0.013 |
| 19 | 25KA0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE 2), BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, BRGY. LAGUITAS, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱123.3M | 45% | High risk61 | —-0.012 |
| 20 | 22KB0085ROAD WIDENING ALONG SAYRE HIGHWAY, K1551+143-K1551+203(LS), K1553+109-K1554+000(BS), K1554+000-K1554+077 (RS), K1554+109-K1554+077 (RS), K1554+109-K1554+281 (LS), K1554+281-K1554+317 (BS), K1554+317-K15564+563 (LS), K1558+333-K1558+378 (BS), K1558+959-K1 | Region X | Bukidnon 2nd DEO | Completed | ₱94.3M | 100% | Medium risk58 | —-0.080 |
| 21 | 24KB0163CONSTRUCTION OF JCT. BYPASS ROAD (JCT MARAMAG-MARADUGAO ROAD TO JCT. LAMPANUSAN ROAD EXTENSION), BRGY. SAN ANDRES-BRGY. CABADIANGAN-SITIO TALAGUBA-SITIO BACBACON ROAD, KADINGILAN, BUKIDNON (SAN ANDRES SECTION AND CABADIANGAN SECTION, PACKAGE 1) | Region X | Bukidnon 2nd DEO | Completed | ₱98M | 100% | Medium risk57 | —-0.078 |
| 22 | 18K00128PAVING OF UNPAVED ROADS, KIBAWE-KADINGILAN-KALILANGAN RD-K1619+423-K1621+141,K1621+165-K1622+285,BUK | Region X | Region X | Completed | ₱99.5M | 100% | Medium risk57 | —-0.080 |
| 23 | 24KB0032ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1569+240-K1571+000, K1572+000-K1573+000, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱107.4M | 100% | Medium risk57 | —-0.039 |
| 24 | 20KB0065ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1566+000-K1568+000, K1574+000-K1575+000, DON CARLOS-KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.075 |
| 25 | 19KB0027ROAD WIDENING ON SPECIFIC LOCATION ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1565+500-K1566+000, K1569+240-K1572+000, DON CARLOS NORTE & PINAMALOY, POBLACION, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |