Contractor dossier
172 projects on file, including joint ventures this contractor is part of.
Total projects
172
Total budget
₱6.7B
Average progress
96.0%
Completion rate
82.0%
Average risk score
46.2
Medium risk on average, out of 100
Flagged as unusual
6
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 172 | ₱6.7B | 46.2 | 6 | 96.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 111 | ₱4.3B | 46.0 | 2 | 99.0% |
| Buildings and Facilities | 32 | ₱458.4M | 29.3 | 0 | 96.0% |
| Flood Control and Drainage | 10 | ₱997.3M | 57.1 | 0 | 77.5% |
| Bridges | 7 | ₱164.9M | 45.6 | 0 | 95.7% |
| OTHER | 6 | ₱478.7M | 74.9 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱173.5M | 95.0 | 2 | 55.0% |
| GAA 2025 OO-1 | 2 | ₱102M | 92.2 | 1 | 81.9% |
| GAA 2025 OO-2 | 1 | ₱91.2M | 91.2 | 0 | 81.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 25KN0038CONSTRUCTION OF ROAD, BARANGAY NINOY AQUINO, KALILANGAN, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱19.2M | 95% | High risk95 | —-0.000 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
| 25KB0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1573+350-K1573+450, K1603+435-1603+470, K1604+890-K1604+910, KITAOTAO & DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱46.3M | 89% | High risk91 | —-0.006 |
| 25KB0017CONSTRUCTION OF REVETMENT DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 81% | High risk91 | —-0.009 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 23KB0059CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY RD. K1594+056-K1594+340, K1594+390-K1594+440, K1594+440-K1594+593, K1594+593-K1594+729, K1594+858-K1594+944, K1595+073-K1595+129, K1595+129-K1595+340, K1595+340-K1595+415, K1595+4 | Region X | Bukidnon 2nd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.032 |
| 24KB0035CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱91.7M | 100% | High risk75 | —-0.023 |
| 23K00201CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION) BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱85.3M | 100% | High risk75 | —-0.024 |
| 23K00299CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (OLD DAMULOG - MIGCAWAYAN) BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱85.7M | 100% | High risk75 | —-0.026 |
| 23KB0055CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON PACKAGE 2, DOLOGON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱52.5M | 100% | High risk75 | —-0.037 |
| 24KA0069CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, BRGY. MAGKALUNGAY, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱144.8M | 100% | High risk63 | —-0.051 |
| 24KA0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱141.9M | 100% | High risk63 | —-0.052 |
| 25KA0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱124.5M | 65% | High risk62 | —-0.017 |
| 25KA0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.1M | 63% | High risk62 | —-0.014 |
| 25KA0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 1), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 41% | High risk61 | —-0.010 |
| 25KA0041CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 61% | High risk61 | —-0.013 |
| 25KA0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE 2), BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, BRGY. LAGUITAS, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱123.3M | 45% | High risk61 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 24KB0167CONCRETING OF BRGY. SAN MIGUEL FMR, BRGY. SAN MIGUEL, MARAMAG, BUIKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱29.6M | 98% | Medium risk47 | Flagged0.010 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 24KB0198CONSTRUCTION OF FARM-TO-MILL ROAD, BRGY. SAN JOSE (PHASE 3) TO OADI, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱17.4M | 100% | Medium risk46 | Flagged0.003 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20KA0105CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. IBA, CABANGLASAN, BUKIDNONCABANGLASAN, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱14.8M | 100% | Medium risk43 | —-0.090 |
| 127 | 17KC0005IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG SAYRE HIGHWAY K1473+539-K1474+090, K1474+536-K1474+1013, K1471+864-K1472+130, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱36.8M | 100% | Medium risk43 | —-0.066 |
| 128 | 17KC0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG SAYRE HIGHWAY K1441+906-K1442+000, K1446+081-K1446+181, K1453+180-K1453+475, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | Medium risk43 | —-0.068 |
| 129 | 17KB0018CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS, SAYRE HIGHWAY, POBLACION KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱18.6M | 100% | Medium risk43 | —-0.065 |
| 130 | 17KA0019IMPROVEMENT/WIDENING OF JCT. SAYRE HIGHWAY AGLAYAN-ALANIB-TICALAAN(AGLAYAN-BASAK) K1533 + 1117 - K1534 + 460LANTAPAN, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱16M | 100% | Medium risk43 | —-0.066 |
| 131 | 24KB0052CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY WEST KIBAWE, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱11.8M | 100% | Medium risk43 | —-0.093 |
| 132 | 17KB0025CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS, MARAMAG-MARADUGAO ROAD AND SAYRE HIGHWAY | Region X | Bukidnon 2nd DEO | Completed | ₱7.7M | 100% | Medium risk43 | —-0.066 |
| 133 | 17KA0028REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPECOLLAPSE AND LANDSLIDE ALONG JCT SH AGLAYAN-ZAMBOANGUITA RDK1530+700 - K1530+730, K1560+000 - K1560+040MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱19.2M | 100% | Medium risk43 | —-0.058 |
| 134 | 17KA0008FLARING OF INTERSECTION ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) AND JCT SH AGLAYAN- ZAMBOANGUITA RDINTERSECTION - K1518 + -223MALAYBALAY CITY | Region X | Bukidnon 1st DEO | Completed | ₱18.4M | 100% | Medium risk43 | —-0.058 |
| 135 | 17KA0041CONSTRUCTION OF DPWH OFFICIALS AND EMPLOYEES' QUARTERS, MULTI-PURPOSE BUILDING AND PARKING OF BUKIDNON 1ST DEO, MALAYBALAY CITY | Region X | Bukidnon 1st DEO | Completed | ₱19.6M | 100% | Medium risk43 | —-0.066 |
| 136 | 19KA0069CONSTRUCTION OF MULTI-PURPOSE BUILDING -CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. LUMBO, VALENCIA CITY, BUKIDNONVALENCIA CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.093 |
| 137 | 17KA0005REHABILITATION/RECONSTRUCTION/UPGRADING OF SAYRE HIGHWAY - K1523+376 - K1524+157 MALAYBALAY CITY | Region X | Bukidnon 1st DEO | Completed | ₱23.9M | 100% | Medium risk43 | —-0.066 |
| 138 | 22K00218CONSTRUCTION OF IMPASU-ONG MUNICIPAL POLICE STATION BUILDING, IMPASUG-ONG, BUKIDNON | Region X | Region X | Completed | ₱10.1M | 100% | Medium risk42 | —-0.094 |
| 139 | 24K00371CONSTRUCTION OF 3-STOREY 12-CLASSROOM SCHOOL BUILDING IN GUINUYORAN NATIONAL HIGH SCHOOL, BARANGAY GUINUYORAN, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱32.7M | 100% | Medium risk42 | —-0.005 |
| 140 | 17KA0040CONSTRUCTION OF BANGCUD BRIDGE ALONG JCT. SH-BANGCUD MAILAG RD (BY-PASS RD) MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱32.3M | 100% | Medium risk42 | —-0.037 |
| 141 | 22KB0172CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BOLOCAON, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.093 |
| 142 | 17KB0108CVONSTRUCTION OF FARM TO MILL ROAD, MARAMAG TO BRGY DOLOGON VIA SAN ROQUE, K1557+179.9-K1559+100, NORTH POBLACION MARAMAG TO BRGY ANAHAWON ROAD | Region X | Bukidnon 2nd DEO | Completed | ₱30.1M | 100% | Medium risk41 | —-0.006 |
| 143 | 23K00326CONCRETING OF BRGY. MALINAO TO SITIO IMBARIZ, BRGY. MALINAO FMR, BRGY. MALINAO, KALILANGAN, BUKIDNON | Region X | Region X | Completed | ₱12.8M | 100% | Medium risk40 | —-0.042 |
| 144 | 18K00318CONST. OF PUROK 21-PUROK 20 FMR, BRGY. POBLACION, VALENCIA CITY, BUKIDNON | Region X | Region X | Completed | ₱5.2M | 100% | Medium risk40 | —-0.038 |
| 145 | 17K00419CONCRETING OF BRGY. LALIGAN TO SINAYAWAN FARM TO MARKET ROAD, BRGY. LALIGAN, VALENCIA CITY, BUKIDNON | Region X | Region X | Completed | ₱16.1M | 100% | Medium risk40 | —-0.011 |
| 146 | 22KB0207REHABILITATION AND CONCRETING OF CROSSING BRGY. SAN MIGUEL TO SITIO DAGUIWAAS FMR, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱10M | 100% | Medium risk40 | —-0.040 |
| 147 | 22KB0203REHABILITATION AND CONCRETING OF PUROK 1 BRGY.DANGGAWAN TO BRGY. KUYA FMR, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱10M | 100% | Medium risk40 | —-0.041 |
| 148 | 20KB0156CONCRETING OF SUGAR CANE FARM-TO-MILL ROAD (FMR), CALAO-CALAO, DON CARLOS - BERSHIBA, KITAOTAO, DON CARLOS - KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱13.8M | 100% | Medium risk40 | —-0.039 |
| 149 | 21KC0107CONCRETING OF SITIO SAN ISIDRO TO SITIO AP-AP FMR BRGY. ADTUYON, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱11.9M | 100% | Medium risk40 | —-0.042 |
| 150 | 21KC0108CONCRETING OF SITIO SAN ROQUE TO SITIO TAGULILONG, BRGY. CONCEPCION FMR, BRGY. CONCEPCION, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.042 |