Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱8.1B
Average progress
94.9%
Completion rate
81.0%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
11
7.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 50 | ₱2.3B | 52.4 | 1 | 98.0% |
| Region III | 38 | ₱3.1B | 59.0 | 9 | 92.6% |
| National Capital Region | 25 | ₱1.2B | 50.4 | 0 | 89.0% |
| Region V | 23 | ₱1.1B | 58.6 | 1 | 97.1% |
| Region VII | 5 | ₱414.8M | 60.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱51.1M | 52.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 77 | ₱3.3B | 52.9 | 0 | 95.7% |
| Flood Control and Drainage | 52 | ₱4.3B | 58.1 | 8 | 93.5% |
| Buildings and Facilities | 8 | ₱70.6M | 38.0 | 0 | 100.0% |
| OTHER | 3 | ₱337.8M | 90.2 | 3 | 79.8% |
| GAA 2025 SSP | 1 | ₱9.7M | 91.3 | 0 | 100.0% |
| Bridges | 1 | ₱96.5M | 63.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 25OB0345CONSTRUCTION/COMPLETION OF MULTI PURPOSE BUILDING (COVERED COURT), MANDALUYONG HIGH SCHOOL, BARANGAY POBLACION, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.7M | 100% | High risk91 | —-0.004 |
| 24CJ0412BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT 0), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.049 |
| 24CJ0413BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 87% | High risk90 | Flagged0.049 |
| 24CC0615CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE E) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 44% | High risk84 | Flagged0.046 |
| 24CC0607CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, PUROK 3, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 60% | High risk84 | Flagged0.044 |
| 24CC0608CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 62% | High risk84 | Flagged0.043 |
| 24CC0614CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER BARANGAY DAUNGAN, PUROK 4, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 81% | High risk84 | Flagged0.036 |
| 24CC0586CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY IBA-IBAYO TO BARANGAY ABULALAS, HAGONOY, BULACAN PACKAGE B | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 93% | High risk83 | Flagged0.035 |
| 24CC0609CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 71% | High risk83 | Flagged0.039 |
| 25CL0152CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 2 SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 98% | High risk81 | —-0.021 |
| 25CL0151CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 99% | High risk81 | —-0.021 |
| 25DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF BANK IMPROVEMENT ALONG YLANG-YLANG RIVER (PHASE IV), BARANGAY SAN FRANCI | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.004 |
| 24CC0350ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - BIGAA-PLARIDEL VIA BULACAN & MALOLOS RD - BULACAN SECTION, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱94.1M | 73% | High risk77 | —-0.021 |
| 24C00460ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.036 |
| 24CC0348ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - OLD CAGAYAN VALLEY ROAD - BALIUAG SECTION, CITY OF BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱98M | 100% | High risk76 | —-0.055 |
| 24CL0220REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BUCAO RIVER UPSTREAM, BRGY. SAN JUAN, BOTOLAN, ZAMBALES PHASE 1 | Region III | Zambales 1st DEO | Completed | ₱90.8M | 100% | High risk74 | Flagged0.012 |
| 24F00390REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG YAWA RIVER, BRGY. MALOBAGO, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱179.9M | 93% | High risk74 | —-0.025 |
| 24CJ0404CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (SEGMENT 41), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | High risk68 | —-0.013 |
| 17DP0051REPAIR/REHABILITATION/IMPROVEMENT OF CALAMBA-STA.CRUZ-FAMY JUNCTION ROAD (SO174LZ) KO073+262 TO KO074+780, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱28.5M | 100% | High risk67 | —-0.070 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 24CJ0412BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT 0), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.049 |
| 24CJ0413BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 87% | High risk90 | Flagged0.049 |
| 24CC0615CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE E) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 44% | High risk84 | Flagged0.046 |
| 24CC0607CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, PUROK 3, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 60% | High risk84 | Flagged0.044 |
| 24CC0608CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 62% | High risk84 | Flagged0.043 |
| 24CC0609CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 71% | High risk83 | Flagged0.039 |
| 24CC0614CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER BARANGAY DAUNGAN, PUROK 4, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 81% | High risk84 | Flagged0.036 |
| 24CC0586CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY IBA-IBAYO TO BARANGAY ABULALAS, HAGONOY, BULACAN PACKAGE B | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 93% | High risk83 | Flagged0.035 |
| 24CL0220REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BUCAO RIVER UPSTREAM, BRGY. SAN JUAN, BOTOLAN, ZAMBALES PHASE 1 | Region III | Zambales 1st DEO | Completed | ₱90.8M | 100% | High risk74 | Flagged0.012 |
| 25DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF BANK IMPROVEMENT ALONG YLANG-YLANG RIVER (PHASE IV), BARANGAY SAN FRANCI | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 2 | 25OB0345CONSTRUCTION/COMPLETION OF MULTI PURPOSE BUILDING (COVERED COURT), MANDALUYONG HIGH SCHOOL, BARANGAY POBLACION, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.7M | 100% | High risk91 | —-0.004 |
| 3 | 24CJ0412BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT 0), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.049 |
| 4 | 24CJ0413BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 87% | High risk90 | Flagged0.049 |
| 5 | 24CC0615CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE E) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 44% | High risk84 | Flagged0.046 |
| 6 | 24CC0607CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, PUROK 3, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 60% | High risk84 | Flagged0.044 |
| 7 | 24CC0608CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 62% | High risk84 | Flagged0.043 |
| 8 | 24CC0614CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER BARANGAY DAUNGAN, PUROK 4, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 81% | High risk84 | Flagged0.036 |
| 9 | 24CC0586CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY IBA-IBAYO TO BARANGAY ABULALAS, HAGONOY, BULACAN PACKAGE B | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 93% | High risk83 | Flagged0.035 |
| 10 | 24CC0609CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 71% | High risk83 | Flagged0.039 |
| 11 | 25CL0152CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 2 SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 98% | High risk81 | —-0.021 |
| 12 | 25CL0151CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 99% | High risk81 | —-0.021 |
| 13 | 25DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF BANK IMPROVEMENT ALONG YLANG-YLANG RIVER (PHASE IV), BARANGAY SAN FRANCI | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.004 |
| 14 | 24CC0350ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - BIGAA-PLARIDEL VIA BULACAN & MALOLOS RD - BULACAN SECTION, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱94.1M | 73% | High risk77 | —-0.021 |
| 15 | 24C00460ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.036 |
| 16 | 24CC0348ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - OLD CAGAYAN VALLEY ROAD - BALIUAG SECTION, CITY OF BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱98M | 100% | High risk76 | —-0.055 |
| 17 | 24CL0220REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BUCAO RIVER UPSTREAM, BRGY. SAN JUAN, BOTOLAN, ZAMBALES PHASE 1 | Region III | Zambales 1st DEO | Completed | ₱90.8M | 100% | High risk74 | Flagged0.012 |
| 18 | 24F00390REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG YAWA RIVER, BRGY. MALOBAGO, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱179.9M | 93% | High risk74 | —-0.025 |
| 19 | 24CJ0404CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (SEGMENT 41), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | High risk68 | —-0.013 |
| 20 | 17DP0051REPAIR/REHABILITATION/IMPROVEMENT OF CALAMBA-STA.CRUZ-FAMY JUNCTION ROAD (SO174LZ) KO073+262 TO KO074+780, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱28.5M | 100% | High risk67 | —-0.070 |
| 21 | 25DH0053PREVENTIVE MAINTENANCE-SECONDARY ROADS CALAMBA-STA. CRUZ-FAMY JCT RD K0104+516-K0105+122, PAKIL, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱39.3M | 100% | High risk67 | —-0.053 |
| 22 | 17DH0023ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY AND TERTIARY ROADS, RIZAL BDRY. FAMY QUEZON BDRY. ROAD, K0071 + 300-K0071 + 336, K0071 + 900 | Region IV-A | Laguna 1st DEO | Completed | ₱5.9M | 100% | High risk66 | —-0.072 |
| 23 | 17FB0086LOCAL INFRASTRUCTURE PROJECT-ROADS & BRIDGES - NATIONAL ROADS - LEGAZPI CITY-PUNTA DE JESUS, K0529+-131-K0533+000 | Region V | Albay 2nd DEO | Completed | ₱47.9M | 100% | High risk65 | —-0.061 |
| 24 | 23DH0034REHABILITATION OF BANK ALONG PAGSANJAN RIVER, WAWA, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱95.1M | 100% | High risk65 | —-0.075 |
| 25 | 22DH0069BANK IMPROVEMENT ALONG SANTA CRUZ RIVER, PAGSANJAN SECTION, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱93.6M | 100% | High risk65 | —-0.078 |