Opening the dossier…
Opening the dossier…
Contractor dossier
129 projects on file, including joint ventures this contractor is part of.
Total projects
129
Total budget
₱5.1B
Average progress
90.0%
Completion rate
69.0%
Below 70%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
14
10.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 102 | ₱3.6B | 53.4 | 11 | 91.1% |
| Region II | 27 | ₱1.5B | 53.2 | 3 | 85.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱3.4B | 49.5 | 1 | 93.8% |
| Flood Control and Drainage | 14 | ₱624.8M | 51.6 | 1 | 88.8% |
| OTHER | 10 | ₱466.4M | 78.4 | 4 | 78.4% |
| Bridges | 8 | ₱171M | 44.7 | 1 | 88.8% |
| GAA 2025 OO-1 | 4 | ₱388.5M | 94.4 | 4 | 60.8% |
| Buildings and Facilities | 4 | ₱26.2M | 47.7 | 2 | 88.4% |
| GAA 2025 OO-2 | 1 | ₱96.3M | 93.3 | 1 | 22.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PM0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALLACAD ROAD - (AMOLONG-TAWANG SECTION) (COMPONENT M1) - CHAINAGE 000+00 | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.4M | 87% | High risk95 | Flagged0.007 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 25PL0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGAL | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱50.9M | 49% | High risk94 | Flagged0.008 |
| 25PM0052ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MOUNTAIN PROVINCE - ISABELA ROAD - (BUTIGUE-ROXAS SECTION) (COMPONENT M2) - CHAINAGE 000 + 000 - CHAINAGE 004 + | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.5M | 99% | High risk93 | Flagged0.004 |
| 25BD0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 23% | High risk93 | Flagged0.017 |
| 24PL0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (LEFT BANK) ALONG CHICO RIVER AT NEW TANGLAG TABUK CITY, K | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱96.5M | 65% | High risk83 | Flagged0.020 |
| 24PL0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NAMBARAN-ISABELA RD - K0509 + (-903) - K0520 + 865 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱193M | 88% | High risk80 | Flagged0.033 |
| 24BD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0483+550 - K0484+020 | Region II | Cagayan 3rd DEO | On-Going | ₱20.4M | 31% | High risk80 | Flagged0.024 |
| 21PL0103ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-TABUK-BANAWE VIA TANUDAN-BARLIG RD - K0510 + 685 - K0510 + 745, K0512 + 458 - K0512 + 473, K0514 + 120 - K0514 + 160, K0514 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk78 | —-0.023 |
| 21PL0104ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0524 + 050.5 - K0525 + 110, K0525 + 144 - K0525 + 228.5, K0539 +750 - K0539 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.024 |
| 21PL0109ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0513 + 188 - K0513 + 797, K0513 + 816 - K0514 + 088, K0514 + 525 - K0514 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.017 |
| 21PL0108ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0516 + 723 - K0517 + 704, K0524 + 000 - K0524 + 050.5, K0537 +200 - K0537 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.3M | 100% | High risk77 | —-0.025 |
| 21PL0107ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-TABUK-BANAWE VIA TANUDAN-BARLIG RD - K0510 + 095 - K0510 + 159, K0511 + 381 - K0511 + 402, K0511 + 605 - K0511 + 632, K0511 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.024 |
| 22BE0014ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (LZ) - KO406+342-KO408+000, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱25M | 100% | High risk77 | —-0.025 |
| 22PK0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUGNAY (MANGAPE)-BUSCALAN-LOCCONG-BUTBUT PROPER ROAD LEADING TO BUSCALAN TATTOO VILAGE, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱9.8M | 0% | High risk77 | Flagged0.045 |
| 25BD0019OO1: ENSURE SAFE AND RELIABLE NATIONAL RD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD (S00725LZ)-K0439+483-K0439+609, K0439+981-K0440+274, K0440+452-K0442+191, K0442+234-K0443+047 & K0443+305-K0443+334 (4 LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱96.5M | 100% | High risk70 | —-0.022 |
| 25BD0020OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD (S00724LZ)-K0434+(-754) - K0434+260 (OUTER LANES) AND SANTIAGO-TUGUEGARAO ROAD (S00725LZ)-K0437+000 - K0439+483 (4 LANES) | Region II | Cagayan 3rd DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.035 |
| 23P00004CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER (LEFT BANK), TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | —-0.038 |
| 25PL0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG DONGRAYAN RIVER AT NABALINAN, BA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 12% | High risk66 | Flagged0.013 |
| 24BD0097OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION) - K0437 + (-055) - K0441 + 576, K0441 + 600 - K0444 + 214, K0444 + 315 - K0445 + 676 | Region II | Cagayan 3rd DEO | Completed | ₱144.6M | 100% | High risk63 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22PK0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUGNAY (MANGAPE)-BUSCALAN-LOCCONG-BUTBUT PROPER ROAD LEADING TO BUSCALAN TATTOO VILAGE, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱9.8M | 0% | High risk77 | Flagged0.045 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 24PL0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NAMBARAN-ISABELA RD - K0509 + (-903) - K0520 + 865 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱193M | 88% | High risk80 | Flagged0.033 |
| 24BD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0483+550 - K0484+020 | Region II | Cagayan 3rd DEO | On-Going | ₱20.4M | 31% | High risk80 | Flagged0.024 |
| 24PL0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (LEFT BANK) ALONG CHICO RIVER AT NEW TANGLAG TABUK CITY, K | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱96.5M | 65% | High risk83 | Flagged0.020 |
| 23PL0117CONSTRUCTION OF 1STY4CL, MALAGNAT NATIONAL HIGH SCHOOL-TAGGAY EXTENSION, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 66% | Medium risk54 | Flagged0.018 |
| 25BD0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 23% | High risk93 | Flagged0.017 |
| 25PL0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG DONGRAYAN RIVER AT NABALINAN, BA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 12% | High risk66 | Flagged0.013 |
| 24PK0019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) - MAKILO BR. (B00951LZ) ALONG MT PROVINCE BDGY - CALANAN - PINUKPUK - ABBUT RD (PHASE II). | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱57.8M | 12% | Medium risk57 | Flagged0.008 |
| 25PL0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGAL | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱50.9M | 49% | High risk94 | Flagged0.008 |
| 25PM0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALLACAD ROAD - (AMOLONG-TAWANG SECTION) (COMPONENT M1) - CHAINAGE 000+00 | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.4M | 87% | High risk95 | Flagged0.007 |
| 23PL0122CONSTRUCTION OF 1STY2CL, LIMOS NATIONAL HIGH SCHOOL - DAO-ANGAN EXTENSION, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱5M | 88% | Medium risk54 | Flagged0.007 |
| 24PL0068CONCRETING OF SITIO TOPAP TO SITIO DALUWAY, BRGY. BALLAYANGON FMR, BRGY. BALLAYANGON, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱14.9M | 100% | Medium risk52 | Flagged0.005 |
| 25PM0052ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MOUNTAIN PROVINCE - ISABELA ROAD - (BUTIGUE-ROXAS SECTION) (COMPONENT M2) - CHAINAGE 000 + 000 - CHAINAGE 004 + | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.5M | 99% | High risk93 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25PL0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BALBALAN-PINUKPUK RD - K0511 + 671 - K0515 + 347 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱44.7M | 100% | Medium risk52 | —-0.051 |
| 52 | 20PK0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS: TERTIARY ROADS - LUBUAGAN - BATONG BUHAY - ABRA BDRY. ROAD, K0460+900 - K0462+032, PASIL/LUBUAGAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.078 |
| 53 | 17PK0029REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, ABLEG BRIDGE 2(B00959)LZ ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱8.3M | 100% | Medium risk51 | —-0.022 |
| 54 | 25BD0008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY MINANGA SUR, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱67.5M | 52% | Medium risk51 | —-0.020 |
| 55 | 17PK0034REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, LANGSO BR(B00956)LZ ALONG MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱6M | 100% | Medium risk51 | —-0.022 |
| 56 | 19PL0050NETWORK DEVELOPMENT -OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS BALABALAN-PINUKPUK ROAD (S00537LZ) CHAINAGE 18718 - CHAINAGE 19454, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱11M | 100% | Medium risk51 | —-0.081 |
| 57 | 23PL0021ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION (CONTINUATION) OF BANTAY FLO | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.066 |
| 58 | 25PL0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECT) - K0485 + 000 - K0486 + 815 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱44.6M | 100% | Medium risk51 | —-0.051 |
| 59 | 23PL0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS - BALBALAN-PINUKPUK ROAD - K0496+000 - K0497+000, K0511+000 - K0512+000 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱22.6M | 100% | Medium risk51 | —-0.081 |
| 60 | 22PL0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT ROAD (PINUKPUK-ABBUT SECTION) - K0531+013 - K0531+801 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱9.1M | 100% | Medium risk51 | —-0.079 |
| 61 | 22PL0029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS-KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0496+59 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱5.3M | 100% | Medium risk51 | —-0.078 |
| 62 | 25PL0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0498 + 037 - K0499 + 095 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱37.7M | 100% | Medium risk51 | —-0.051 |
| 63 | 17PK0033REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, PUTTOT BR(B00953)LZ ALONG MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱10.3M | 100% | Medium risk51 | —-0.022 |
| 64 | 24PL0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CALANAN-PINUKPUK SECTION) - K0505 + 000 - K0505 + 719, K0506 + 293 - K05 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱40.9M | 100% | Medium risk51 | —-0.077 |
| 65 | 25PL0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0511 + 311 - K0512 + 450, K0512+931 - K0513+211, K0514+575 - K0514+773, K0519+317 - K0520+ | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱41.3M | 100% | Medium risk51 | —-0.051 |
| 66 | 24PL0019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECTION) - K0470 + (-003) - K0470 + 000, K0470 + (-004) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱45.6M | 100% | Medium risk51 | —-0.078 |
| 67 | 20PL0004ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION), K0505+219-K0505+830 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱6.5M | 100% | Medium risk51 | —-0.080 |
| 68 | 19PK0001ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱31.3M | 100% | Medium risk51 | —-0.081 |
| 69 | 24PL0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - RIZAL NAT'L RD (LIWAN WEST-BABALAG-MACUTAY SECT) - K0522 + (-569) - K0522 + (-092.871) | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱11.7M | 91% | Medium risk51 | —-0.042 |
| 70 | 22PK0035ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE: SECONDARY ROADS - KALINGA-ABRA ROAD, K0477+202 - K0477+857 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱7.9M | 100% | Medium risk51 | —-0.082 |
| 71 | 19PK0025NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - SECONDARY ROADS ALONG BALBALAN-PINUKPUK ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱37.7M | 100% | Medium risk51 | —-0.075 |
| 72 | 20PL0009ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS ALONG MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (PINUKPUK-ABBUT SECTION), K0532+000 - K0533+000, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱9.9M | 100% | Medium risk51 | —-0.077 |
| 73 | 19PK0024ASSET PRESERVATION - REHABILITATION /RECONSTRUCTION /UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD ALONG BALBALAN - PINUKPUK ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱9.8M | 100% | Medium risk51 | —-0.080 |
| 74 | 18PK0007ASSET PRESERVATION - PREVENTIVE MAINTENANCE ALONG MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT RD. | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱41.4M | 100% | Medium risk51 | —-0.081 |
| 75 | 19PK0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG KALINGA-ABRA ROAD, PASIL, KALINGA /K0479+475-K0482+370 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱40.1M | 100% | Medium risk51 | —-0.082 |