Contractor dossier
129 projects on file, including joint ventures this contractor is part of.
Total projects
129
Total budget
₱5.1B
Average progress
90.0%
Completion rate
69.0%
Below 70%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
14
10.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 102 | ₱3.6B | 53.4 | 11 | 91.1% |
| Region II | 27 | ₱1.5B | 53.2 | 3 | 85.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱3.4B | 49.5 | 1 | 93.8% |
| Flood Control and Drainage | 14 | ₱624.8M | 51.6 | 1 | 88.8% |
| OTHER | 10 | ₱466.4M | 78.4 | 4 | 78.4% |
| Bridges | 8 | ₱171M | 44.7 | 1 | 88.8% |
| GAA 2025 OO-1 | 4 | ₱388.5M | 94.4 | 4 | 60.8% |
| Buildings and Facilities | 4 | ₱26.2M | 47.7 | 2 | 88.4% |
| GAA 2025 OO-2 | 1 | ₱96.3M | 93.3 | 1 | 22.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PM0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALLACAD ROAD - (AMOLONG-TAWANG SECTION) (COMPONENT M1) - CHAINAGE 000+00 | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.4M | 87% | High risk95 | Flagged0.007 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 25PL0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGAL | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱50.9M | 49% | High risk94 | Flagged0.008 |
| 25PM0052ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MOUNTAIN PROVINCE - ISABELA ROAD - (BUTIGUE-ROXAS SECTION) (COMPONENT M2) - CHAINAGE 000 + 000 - CHAINAGE 004 + | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.5M | 99% | High risk93 | Flagged0.004 |
| 25BD0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 23% | High risk93 | Flagged0.017 |
| 24PL0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (LEFT BANK) ALONG CHICO RIVER AT NEW TANGLAG TABUK CITY, K | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱96.5M | 65% | High risk83 | Flagged0.020 |
| 24PL0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NAMBARAN-ISABELA RD - K0509 + (-903) - K0520 + 865 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱193M | 88% | High risk80 | Flagged0.033 |
| 24BD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0483+550 - K0484+020 | Region II | Cagayan 3rd DEO | On-Going | ₱20.4M | 31% | High risk80 | Flagged0.024 |
| 21PL0103ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-TABUK-BANAWE VIA TANUDAN-BARLIG RD - K0510 + 685 - K0510 + 745, K0512 + 458 - K0512 + 473, K0514 + 120 - K0514 + 160, K0514 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk78 | —-0.023 |
| 21PL0104ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0524 + 050.5 - K0525 + 110, K0525 + 144 - K0525 + 228.5, K0539 +750 - K0539 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.024 |
| 21PL0109ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0513 + 188 - K0513 + 797, K0513 + 816 - K0514 + 088, K0514 + 525 - K0514 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.017 |
| 21PL0108ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- TABUK-BANAWE VIA TANUDAN-BARLIG RD - (S00583LZ)- K0516 + 723 - K0517 + 704, K0524 + 000 - K0524 + 050.5, K0537 +200 - K0537 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.3M | 100% | High risk77 | —-0.025 |
| 21PL0107ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-TABUK-BANAWE VIA TANUDAN-BARLIG RD - K0510 + 095 - K0510 + 159, K0511 + 381 - K0511 + 402, K0511 + 605 - K0511 + 632, K0511 + | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | High risk77 | —-0.024 |
| 22BE0014ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (LZ) - KO406+342-KO408+000, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱25M | 100% | High risk77 | —-0.025 |
| 22PK0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUGNAY (MANGAPE)-BUSCALAN-LOCCONG-BUTBUT PROPER ROAD LEADING TO BUSCALAN TATTOO VILAGE, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱9.8M | 0% | High risk77 | Flagged0.045 |
| 25BD0019OO1: ENSURE SAFE AND RELIABLE NATIONAL RD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD (S00725LZ)-K0439+483-K0439+609, K0439+981-K0440+274, K0440+452-K0442+191, K0442+234-K0443+047 & K0443+305-K0443+334 (4 LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱96.5M | 100% | High risk70 | —-0.022 |
| 25BD0020OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD (S00724LZ)-K0434+(-754) - K0434+260 (OUTER LANES) AND SANTIAGO-TUGUEGARAO ROAD (S00725LZ)-K0437+000 - K0439+483 (4 LANES) | Region II | Cagayan 3rd DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.035 |
| 23P00004CONSTRUCTION OF MEGA DIKE PROJECT ALONG CHICO RIVER (LEFT BANK), TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | —-0.038 |
| 25PL0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG DONGRAYAN RIVER AT NABALINAN, BA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 12% | High risk66 | Flagged0.013 |
| 24BD0097OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - KALINGA-CAGAYAN RD (CALANAN-ENRILE SECTION) - K0437 + (-055) - K0441 + 576, K0441 + 600 - K0444 + 214, K0444 + 315 - K0445 + 676 | Region II | Cagayan 3rd DEO | Completed | ₱144.6M | 100% | High risk63 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22PK0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUGNAY (MANGAPE)-BUSCALAN-LOCCONG-BUTBUT PROPER ROAD LEADING TO BUSCALAN TATTOO VILAGE, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱9.8M | 0% | High risk77 | Flagged0.045 |
| 25BD0018ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE ROAD (S05071LZ) - K0475 + 233 - K0483 + 550 & K0484 + 020 - K0486 + 434 (TWO LANES) | Region II | Cagayan 3rd DEO | On-Going | ₱144.6M | 9% | High risk95 | Flagged0.039 |
| 24PL0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NAMBARAN-ISABELA RD - K0509 + (-903) - K0520 + 865 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱193M | 88% | High risk80 | Flagged0.033 |
| 24BD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0483+550 - K0484+020 | Region II | Cagayan 3rd DEO | On-Going | ₱20.4M | 31% | High risk80 | Flagged0.024 |
| 24PL0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (LEFT BANK) ALONG CHICO RIVER AT NEW TANGLAG TABUK CITY, K | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱96.5M | 65% | High risk83 | Flagged0.020 |
| 23PL0117CONSTRUCTION OF 1STY4CL, MALAGNAT NATIONAL HIGH SCHOOL-TAGGAY EXTENSION, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 66% | Medium risk54 | Flagged0.018 |
| 25BD0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 23% | High risk93 | Flagged0.017 |
| 25PL0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG DONGRAYAN RIVER AT NABALINAN, BA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.6M | 12% | High risk66 | Flagged0.013 |
| 24PK0019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) - MAKILO BR. (B00951LZ) ALONG MT PROVINCE BDGY - CALANAN - PINUKPUK - ABBUT RD (PHASE II). | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱57.8M | 12% | Medium risk57 | Flagged0.008 |
| 25PL0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGAL | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱50.9M | 49% | High risk94 | Flagged0.008 |
| 25PM0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALLACAD ROAD - (AMOLONG-TAWANG SECTION) (COMPONENT M1) - CHAINAGE 000+00 | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.4M | 87% | High risk95 | Flagged0.007 |
| 23PL0122CONSTRUCTION OF 1STY2CL, LIMOS NATIONAL HIGH SCHOOL - DAO-ANGAN EXTENSION, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱5M | 88% | Medium risk54 | Flagged0.007 |
| 24PL0068CONCRETING OF SITIO TOPAP TO SITIO DALUWAY, BRGY. BALLAYANGON FMR, BRGY. BALLAYANGON, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱14.9M | 100% | Medium risk52 | Flagged0.005 |
| 25PM0052ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MOUNTAIN PROVINCE - ISABELA ROAD - (BUTIGUE-ROXAS SECTION) (COMPONENT M2) - CHAINAGE 000 + 000 - CHAINAGE 004 + | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱96.5M | 99% | High risk93 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22PL0008ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS - KALINGA-CAGAYAN ROAD (CALANAN-ENRILE SECTION) - K0506+905 - K0507+000, K0512+469 - K0512+931 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱11.1M | 100% | Medium risk51 | —-0.080 |
| 77 | 23PL0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADNG TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF BRGY. TAGA TO BAYAO, PINUKPUK ACCESS ROAD, KALINGA, | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱14.8M | 51% | Medium risk51 | —-0.031 |
| 78 | 23PL0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT ROAD (CALANAN-PINUKPUK SECTION) - K0503+198 - K0505+000 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱21.3M | 100% | Medium risk51 | —-0.080 |
| 79 | 20PL0002ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECTION), K0472+000-K0472+865, K0474+160-K0475+032, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱19.7M | 100% | Medium risk51 | —-0.083 |
| 80 | 23PL0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT ROAD (CAGALUAN-CALANAN SECTION) - K0471+000 - K0472+000, K0476+956 -K0478+000 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱23.4M | 100% | Medium risk51 | —-0.083 |
| 81 | 19PK0021NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - SECONDARY ROADS ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱27.5M | 100% | Medium risk50 | —-0.081 |
| 82 | 20PK0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE: SECONDARY ROADS - KALINGA-ABRA RD - KO478+000.00 TO KO479+475.00 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱16.6M | 100% | Medium risk50 | —-0.081 |
| 83 | 23PL0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NAMBARAN-ISABELA RD - K0511 + 023 - K0512 + 000 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱11.3M | 100% | Medium risk50 | —-0.077 |
| 84 | 22PL0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS - NAMBARAN-ISABELA ROAD - K0512+877 - K0513+502, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱7.2M | 100% | Medium risk50 | —-0.078 |
| 85 | 24PL0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF FLOOD CONTROL STRUCTURE, PUROK RIVERSIDE, POB | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱24.4M | 100% | Medium risk50 | —-0.065 |
| 86 | 19PK0006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG MOUNTAIN PROVINCE BOUNDARY - CALANAN - PINUKPUK - ABBUT ROAD (CAGALUAN-CALANAN SECTION) | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱17.2M | 100% | Medium risk50 | —-0.081 |
| 87 | 24PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS: LUBUAGAN-BATONG BUHAY-ABRA BDRY RD K0462+032 - K0462+735, K0463+000 - K0464+023, K0464+123 - K0464+211, K0464+284 - K046 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱33.2M | 100% | Medium risk50 | —-0.083 |
| 88 | 18PK0006PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱35.7M | 100% | Medium risk49 | —-0.081 |
| 89 | 20PK0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PREVERVATION PROGRAM - PREVENTIVE MAINTENANCE: SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD - K0444+017 TO K0460+1018, TINGLAYAN/LUBUAGAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱41.7M | 100% | Medium risk49 | —-0.082 |
| 90 | 24PL0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO BANGA-BANGA FALLS, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.081 |
| 91 | 20PK0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, LUBUAGAN-BATONG BUHAY-ABRA ROAD - K0462+177-K | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱25.2M | 100% | Medium risk49 | —-0.081 |
| 92 | 20PL0079ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS-NAMBARAN-ISABELA RD, K0512+343 - K0512+877, K0513+600 - K0514+284, K0516+000 - K0516+476, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱21M | 100% | Medium risk49 | —-0.080 |
| 93 | 20PK0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LAND SLIDE - SECONDARY ROADS, KALINGA-ABRA ROAD, K0469+070-K0469+115, K04 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱20.4M | 100% | Medium risk49 | —-0.082 |
| 94 | 22PK0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES: LUBUAGAN-BATONG BUHAY JUNCTION AWICHON-UPPER UMA ROAD IN SUPPORT OF HOMESTYLE INDUSTRY (SOOFBROOM MAKING AND BLACKSMITH) | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱26.8M | 100% | Medium risk49 | —-0.071 |
| 95 | 23BD0001ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE SYSTEM ALONG PALLUA, PHASE II, PACKAGE I, TUG | Region II | Cagayan 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.049 |
| 96 | 22BD0118REHABILITATION OF ASPHALT ROAD ALONG CAGAYAN VALLEY ROAD K0496+000 - K0501+000 (WITH EXCEPTION), IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱28.9M | 100% | Medium risk48 | —-0.080 |
| 97 | 25PL0034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - TABUK-BANAWE VIA TANUDAN-BARLIG RD - K0516 + 588 - | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱45.5M | 22% | Medium risk48 | —-0.029 |
| 98 | 24BD0041ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - TUGUEGARAO BYPASS RD - K0478 + (-922) - K0478 + 000 | Region II | Cagayan 3rd DEO | Completed | ₱15.8M | 100% | Medium risk48 | —-0.080 |
| 99 | 22BD0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF DRAINAGE SYSTEM ALONG PALLUA, TUGUEGARAO CITY, CAGAYAN - PHASE I | Region II | Cagayan 3rd DEO | Completed | ₱24.1M | 100% | Medium risk48 | —-0.061 |
| 100 | 22BD0098ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE ALONG BAGAY ROAD, TUGUEGARAO CITY, PHASE III | Region II | Cagayan 3rd DEO | Completed | ₱19.3M | 100% | Medium risk48 | —-0.062 |