Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4.9B
Average progress
86.9%
Completion rate
67.0%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
15
13.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 61 | ₱1.5B | 47.4 | 0 | 92.5% |
| Region III | 18 | ₱1.3B | 58.3 | 5 | 80.8% |
| Region IV-A | 17 | ₱610.4M | 48.7 | 0 | 88.2% |
| Region V | 9 | ₱549.6M | 62.2 | 1 | 82.7% |
| Region VII | 6 | ₱568.2M | 81.7 | 5 | 48.9% |
| Region VI | 4 | ₱384.1M | 65.6 | 4 | 91.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 39 | ₱1.3B | 49.9 | 0 | 76.3% |
| Flood Control and Drainage | 34 | ₱2B | 54.4 | 7 | 86.1% |
| Buildings and Facilities | 31 | ₱528M | 47.2 | 0 | 100.0% |
| OTHER | 9 | ₱816.1M | 70.6 | 6 | 91.2% |
| GAA 2025 SSP | 2 | ₱198M | 95.2 | 2 | 87.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0224IMPROVEMENT OF STA. CATALINA - BALETE DIVERSION ROAD (SEGMENT B), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 90% | High risk95 | Flagged0.009 |
| 25CJ0223IMPROVEMENT OF STA. CATALINA - BALETE DIVERSION ROAD (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 86% | High risk95 | Flagged0.010 |
| 24FN0092OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. SAN RAMON SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 23HO0286CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD DIKE AT SITIO GALUCAN, BRG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 99% | High risk91 | Flagged0.059 |
| 23HO0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO NONOK, BRGY. MONTAÑE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0269CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO MAINIT, BRGY. MONTAÑ | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0253- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL AT SITIO TUNGA, BRGY. MONTAÑEZA, MALABUYOC, C | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 24CC0021CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SANTA MONICA, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 86% | High risk76 | —-0.019 |
| 23HO0268CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF REVETMENT WALL, SITIO GALUCAN, PACKAGE 2, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 94% | High risk75 | Flagged0.033 |
| 24CC0628REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.047 |
| 25DF0067CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONST OF SAN FRANCISCO BYPASS RD PHASE 1, GEN TRIAS | Region IV-A | Cavite 1st DEO | On-Going | ₱95.5M | 0% | High risk73 | —-0.013 |
| 23GB0057CONSTRUCTION OF SEAWALL AT BRGY. SANTA FE PANDAN, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 92% | High risk67 | Flagged0.004 |
| 24DF0020ORG. OUTCOME 1:ENSURE SAFE & RELIABLE NATIONAL RD SYSTEM ASSET PRESERVATION PROGCONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL RDS-PRIMARY RDS JUANITO R.REMULLA, SR.RD K0038+312-K0038+540, K0039+100 -K0039+740,K0039+770-K0040+330,K0040+400-K0040+450, | Region IV-A | Cavite 1st DEO | On-Going | ₱27.2M | 0% | High risk67 | —-0.006 |
| 23GB0058CONSTRUCTION OF SEAWALL AT BRGY. POBLACION - BRGY. MALABOR TIBIAO, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 89% | High risk66 | Flagged0.003 |
| 25FD0015CONSTRUCTION OF SHORE PROTECTION STRUCTURE, BARANGAY LOHONG, RAGAY, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱94.4M | 87% | High risk66 | —-0.046 |
| 24OA0094REPAIR/REHABILITATION OF RIVERWALL ALONG MALABON-TULLAHAN RIVER, MALABON CITY (PHASE 2) | National Capital Region | Malabon-Navotas DEO | On-Going | ₱86.9M | 96% | High risk66 | —-0.009 |
| 21DH0053CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, LUMBAN SECTION, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱93.6M | 100% | High risk65 | —-0.071 |
| 23GB0052CONSTRUCTION OF SEAWALL AT BRGY. POBLACION 1- BRGY. LAPAZ HAMTIC, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 89% | High risk65 | Flagged0.005 |
| 23HO0236REPAIR/REHABILITATION/RECONSTRUCTION OF MONTAÑEZA RIVER FLOOD CONTROL SYSTEM (UPSTREAM-SECTION 2), MALABUYOC, CEBU | Region VII | Cebu 7th DEO | Completed | ₱95.4M | 100% | High risk65 | —-0.065 |
| 24FD0041CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BIGAAN RIVER, MALUBAGO SECTION, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱99M | 100% | High risk65 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO NONOK, BRGY. MONTAÑE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0269CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO MAINIT, BRGY. MONTAÑ | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0253- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL AT SITIO TUNGA, BRGY. MONTAÑEZA, MALABUYOC, C | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 24FN0092OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. SAN RAMON SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 23HO0286CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD DIKE AT SITIO GALUCAN, BRG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 99% | High risk91 | Flagged0.059 |
| 24CC0628REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.047 |
| 23HO0268CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF REVETMENT WALL, SITIO GALUCAN, PACKAGE 2, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 94% | High risk75 | Flagged0.033 |
| 25CJ0223IMPROVEMENT OF STA. CATALINA - BALETE DIVERSION ROAD (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 86% | High risk95 | Flagged0.010 |
| 25CJ0224IMPROVEMENT OF STA. CATALINA - BALETE DIVERSION ROAD (SEGMENT B), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 90% | High risk95 | Flagged0.009 |
| 23GB0052CONSTRUCTION OF SEAWALL AT BRGY. POBLACION 1- BRGY. LAPAZ HAMTIC, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 89% | High risk65 | Flagged0.005 |
| 23GB0057CONSTRUCTION OF SEAWALL AT BRGY. SANTA FE PANDAN, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 92% | High risk67 | Flagged0.004 |
| 24CD0311REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIESREPAIR AND REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 05+590 STA. 05+620 (LONGOS ZAMORA SECTION), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.9M | 87% | Medium risk53 | Flagged0.004 |
| 23GB0058CONSTRUCTION OF SEAWALL AT BRGY. POBLACION - BRGY. MALABOR TIBIAO, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 89% | High risk66 | Flagged0.003 |
| 23GB0056CONSTRUCTION OF SEAWALL AT BRGY. BAYBAY, PANDAN, ANTIQUE | Region VI | Antique DEO | On-Going | ₱96M | 96% | High risk64 | Flagged0.001 |
| 24CD0312REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIESREPAIR AND REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 06+445 STA. 06+475 (LONGOS ZAMORA SECTION), MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱18.9M | 97% | Medium risk53 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 20OB0450RETROFITTING OF GOVERNMENT BUILDINGS IN PREPARATION FOR THE BIG ONE DAP BLDG. A SAN MIGUEL AVENUE BRGY. SAN ANTONIO, PASIG CITY, FOR REPAIR ONLY | National Capital Region | Metro Manila 1st DEO | Completed | ₱25.3M | 100% | Medium risk49 | —-0.088 |
| 52 | 20OB0456RETROFITTING OF GOVERNMENT BUILDINGS IN PREPARATION FOR THE BIG ONE NATIONAL CENTER FOR MENTAL HEALTH, PAVILLION 7, NUEVE DE PEBRERO ST., MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱25.5M | 100% | Medium risk49 | —-0.096 |
| 53 | 20OE0228CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS & OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS IN PREPARATION FOR THE BIG ONE - MAIN BUILDI | National Capital Region | North Manila DEO | Completed | ₱25.1M | 100% | Medium risk49 | —-0.101 |
| 54 | 23DH0020CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BARANGAY MAYTALANG, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 55 | 20O00084RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS, NATIONAL CAPITAL REGION - KABAYANAN ELEMENTARY SCHOOL, RODRIGUEZ BUILDING 1, 201 I. FRANCISCO ST., KABAYANAN, SAN JUAN CITY | National Capital Region | National Capital Region | Completed | ₱27.6M | 100% | Medium risk49 | —-0.100 |
| 56 | 19OB0062CONSTRUCTION OF MULTI-PURPOSE BUILDING, COMPLETION OF FACILITIES AND SITE DEVELOPMENT, MANDALUYONG HIGH SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱23.6M | 100% | Medium risk49 | —-0.095 |
| 57 | 20OB0235CONSTRUCTION (COMPLETION) OF 6-STOREY, 18 CLASSROOM SCHOOL BUILDING AT MANDALUYONG HIGH SCHOOL, BARANGAY POBLACION, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱23.7M | 100% | Medium risk49 | —-0.101 |
| 58 | 23OB0375CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT SITIO IMELDA, BARANGAY UPPER BICUTAN TAGUIG CITY (PHASE II) | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.094 |
| 59 | 20OE0226CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCL. LOCAL PROJECTS - BUILDINGS & OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - RETROFITTING / STRENGTHENING OF PUBLIC BUILDINGS IN PREPARATION FOR THE BIG ONE - GRADE I MACEDA | National Capital Region | North Manila DEO | Completed | ₱10.4M | 100% | Medium risk48 | —-0.102 |
| 60 | 21OE0113CONSTRUCTION / REHABILITATION / IMPROVEMENT OF SCHOOL AT:1.ESTEBAN ABADA HIGH SCHOOL, BARANGAY 496, SAMPALOC, CITY OF MANILA2.LAONG LAAN ELEMENTARY SCHOOL, BARANGAY 515, SAMPALOC, CITY OF MANILA3.ESTEBAN ABADA HIGH SCHOOL, BARANGAY 496, MANILA4.LA | National Capital Region | North Manila DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.104 |
| 61 | 19OB0340CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH GROUND IMPROVEMENT AND INSTALLATION OF DRAINAGE INCLUDING COMPLETION OF FACILITIES AT THE CITY OF MANDALUYONG SCIENCE HIGH SCHOOL, BRGY. HULO, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.9M | 100% | Medium risk48 | —-0.100 |
| 62 | 21OA0006CONST OF FLOOD CONTROL STRUCTURES (RIVERWALL/ROAD DIKE), PHASE 12, BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.8M | 100% | Medium risk48 | —-0.085 |
| 63 | 19OB0319ADDITIONAL FUNDS FOR THE COMPLETION OF TWENTY FOUR (24) CLASSROOM AT THE CITY OF MANDALUYONG SCIENCE HIGH SCHOOL INCLUDING COMPLETION OF FACILITIES, BRGY. HULO, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱11.4M | 100% | Medium risk48 | —-0.097 |
| 64 | 20OB0274CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BARANGKA DRIVE, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.2M | 100% | Medium risk48 | —-0.102 |
| 65 | 21OE0116CONSTRUCTION / REHABILITATION / IMPROVEMENT OF SCHOOL AT:1.CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, SAMPALOC, CITY OF MANILA2.CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, MANILA3.JUAN LUNA ELEMENTARY SCHOOL, BARANGAY 396, MANILA4.LEGARDA ELEMEN | National Capital Region | North Manila DEO | Completed | ₱12.5M | 100% | Medium risk48 | —-0.104 |
| 66 | 18OC0152REHABILITATION OF MULTI-PURPOSE BUILDING AT SAMPALOC SITE II, BARANGAY B. F. HOMES,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱5.2M | 100% | Medium risk48 | —-0.101 |
| 67 | 18OC0161REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ANTONIO, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.078 |
| 68 | 23OB0326CONSTRUCTION (COMPLETION) OF FIVE (5) STOREY DISASTER RISK MANAGEMENT BUILDING (PHASE 3), PATEROS, METRO MANILA | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.100 |
| 69 | 23OB0325CONSTRUCTION (COMPLETION) OF FIVE (5) STOREY HALL OF JUSTICE BUILDING (PHASE 3), PATEROS, METRO MANILA | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.100 |
| 70 | 23OB0381CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (DISASTER RISK MANAGEMENT BUILDING), PATEROS (PHASE 3) | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.102 |
| 71 | 18DH0078CONSTRUCTION OF OPEN CANAL, BRGY. MAULAWIN, MUNICIPALITY OF PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.088 |
| 72 | 23OB0174CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT) AT MANDALUYONG HIGH SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.099 |
| 73 | 22OB0286REHABILITATION OF MULTI PURPOSE BUILDING (EVACUATION CENTER) AT BLOCK 41 BARANGAY ADDITION HILLS, MANDALUYONG | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.099 |
| 74 | 20OB0033CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, CITY OF MANDALUYONG SCIENCE HIGH SCHOOL, BARANGAY HULO, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱6.6M | 100% | Medium risk47 | —-0.089 |
| 75 | 23OE0126CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 260 ZONE 24, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.103 |