Contractor dossier
315 projects on file, including joint ventures this contractor is part of.
Total projects
315
Total budget
₱14.7B
Average progress
88.7%
Completion rate
54.0%
Below 70%
Average risk score
56.0
Medium risk on average, out of 100
Flagged as unusual
58
18.4% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 117 | ₱10.9B | 64.0 | 22 | 86.0% |
| Roads | 83 | ₱1.1B | 48.5 | 4 | 87.9% |
| Buildings and Facilities | 72 | ₱348M | 35.1 | 3 | 97.5% |
| GAA 2025 OO-2 | 16 | ₱1.7B | 93.4 | 13 | 71.6% |
| GAA 2025 SSP | 12 | ₱73M | 92.8 | 10 | 88.8% |
| OTHER | 6 | ₱393.5M | 84.3 | 5 | 86.5% |
| Water Provision and Storage | 6 | ₱38.6M | 42.3 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱162.9M | 94.6 | 1 | 67.9% |
| Bridges | 1 | ₱48.9M | 49.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0074CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALIGAYA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.002 |
| 25BH0222BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. CULALABAT, CAUAYAN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 71% | High risk95 | Flagged0.013 |
| 25BH0299BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GUYABAL, CAUAYAN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 95% | High risk95 | Flagged0.006 |
| 25BF0045CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JOSE NORTE II, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱4.8M | 95% | High risk95 | Flagged0.006 |
| 25BH0238BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING-BRGY. ANONANG, SAN GUILLERMO, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 51% | High risk95 | Flagged0.018 |
| 25BH0223BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. MARABULIG 2, CAUAYAN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.018 |
| 25B00038OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA-ANGADANAN-SAN GUILLERMO-CAUAYAN CITY-NAGUILIAN ALTERNATE ROUTE, SAN GUILLERMO, PACKAGE 1, ISABELA | Region II | Region II | On-Going | ₱115.5M | 60% | High risk95 | Flagged0.015 |
| 25BG0141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CABATUAN STAND ALONE SENIOR HIGH SCHOOL, BARANGAY NUEVA ERA, CABATUAN | Region II | Isabela 3rd DEO | On-Going | ₱9.6M | 90% | High risk95 | Flagged0.006 |
| 25BH0226BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROAD, BRGY. BABARAN, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.6M | 100% | High risk94 | Flagged0.001 |
| 25BG0162OO2 PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, BARANGAY APANAY, DOWNSTREAM, PHASE 2, ALICIA, | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 69% | High risk94 | Flagged0.003 |
| 25BG0163OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY PARAISO, PHASE 2, CABATUAN, | Region II | Isabela 3rd DEO | On-Going | ₱93.6M | 87% | High risk94 | —-0.002 |
| 25BF0061FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL STRUCTURE (SAN JOSE NORTE SECTION), PHASE II, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 50% | High risk94 | Flagged0.010 |
| 25BF0050OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK FLOOD CONTROL PROJECT (SAN RAMON SECTION) BARANGAY SAN RAMON, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 69% | High risk94 | Flagged0.006 |
| 25BF0062FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF MALLIGRIVER FLOOD CONTROL STRUCTURE (SAN JOSE NORTE SECTION), PHASE III, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 70% | High risk94 | Flagged0.006 |
| 25BF0051OO2: FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK FLOOD CONTROL PROJECT (BINMONTON SECTION) BARANGAY BINMONTON, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 87% | High risk94 | Flagged0.001 |
| 25BF0056OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL STRUCTURE (SAN JOSE SUR SECTION), PHASE III, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 52% | High risk94 | Flagged0.009 |
| 25BF0016OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SITIO KARAGSAKAN SECTION PHASE II) BARANGAY RIZAL, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 82% | High risk94 | Flagged0.002 |
| 25BG0038OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, GANANO RIVER, UPSTREAM, BRGY. STA | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 72% | High risk94 | Flagged0.002 |
| 25BG0134OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2 | Region II | Isabela 3rd DEO | On-Going | ₱140.4M | 57% | High risk94 | Flagged0.014 |
| 25BG0107OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD MITIGATION STRUCTURE, BARANGAY SANTIAGO, | Region II | Isabela 3rd DEO | On-Going | ₱140.4M | 79% | High risk94 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BF0139CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, STA. 1+400- STA. 2 + 044.50, PHASE II, BARANGAY SAN JUAN, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.061 |
| 24BF0142OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BARANGAY SAN ISIDRO SECTION, LUNA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 84% | High risk90 | Flagged0.060 |
| 25BF0067CONCRETING OF MALIGAYA-RANG AYAN FMR, BRGY. MALIGAYA-RANG AYAN, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱14.5M | 80% | High risk87 | Flagged0.048 |
| 23B00052OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - TERTIARY ROADS - NAGUILIAN-SAN MARIANO ROAD, ISABELA | Region II | Region II | On-Going | ₱169M | 69% | High risk83 | Flagged0.043 |
| 25BG0176CONCRETING OF PUROK 4-7, BRGY. BAGNOS FMR, BRGY. BAGNOS, ALICIA, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱14.5M | 94% | High risk87 | Flagged0.043 |
| 24BF0143OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, VILLA MIGUEL UPSTREAM SECTION, BARANGAY VILLA MIGUEL, QUIRIN | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 71% | High risk71 | Flagged0.034 |
| 24BF0140ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, STA.1 + 400 - STA. 2 + | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 80% | High risk72 | Flagged0.032 |
| 24BH0127CONCRETING OF VILLAFLOR - CALAOGAN FMR, BRGY. VILLAFLOR AND BRGY. CALAOGAN, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱9.9M | 0% | Medium risk40 | Flagged0.030 |
| 24BF0141ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, STA. 1 + 760 - STA. 2 + | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 90% | High risk71 | Flagged0.030 |
| 25BF0058OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱140.4M | 4% | High risk94 | Flagged0.028 |
| 24BG0209CONSTRUCTION OF 1-STOREY 4-CLASSROOM SCHOOL BUILDING IN SALINUNGAN NATIONAL HIGH SCHOOL, BARANGAY SALINUNGAN WEST, SAN MATEO, ISABELA, SCHOOL ID NO.: 300581 | Region II | Isabela 3rd DEO | On-Going | ₱9.9M | 0% | Medium risk43 | Flagged0.026 |
| 24BG0270OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL ALONG GANANO RIVER BANK, BRGY SANTA MARIA | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 100% | High risk71 | Flagged0.022 |
| 24BG0271OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT ALONG GANANO RIVER BANK,BRGY. SAN ANTONIO | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 100% | High risk71 | Flagged0.022 |
| 25BH0238BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING-BRGY. ANONANG, SAN GUILLERMO, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 51% | High risk95 | Flagged0.018 |
| 25BH0223BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. MARABULIG 2, CAUAYAN, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.018 |
| 25BF0054OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱140.4M | 47% | High risk79 | Flagged0.016 |
| 25BH0159ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF VILLA REMEDIOS FLOOD CONTROL DRAINAGE STRUCTURE STA.0 | Region II | Isabela 4th DEO | On-Going | ₱93.6M | 0% | High risk80 | Flagged0.015 |
| 25BH0053ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINALUGAN FLOOD CONTROL DRAINAGE STRUCTURE STA. 0+000 | Region II | Isabela 4th DEO | On-Going | ₱96.5M | 8% | High risk79 | Flagged0.015 |
| 25B00038OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ALICIA-ANGADANAN-SAN GUILLERMO-CAUAYAN CITY-NAGUILIAN ALTERNATE ROUTE, SAN GUILLERMO, PACKAGE 1, ISABELA | Region II | Region II | On-Going | ₱115.5M | 60% | High risk95 | Flagged0.015 |
| 25BH0241ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FUGU FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0+710 | Region II | Isabela 4th DEO | On-Going | ₱93.6M | 1% | High risk80 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 24BG0007OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. SAN GUILLERMO (PHASE II), ANG | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.055 |
| 127 | 24BG0091OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONST./ REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT ALONG GANANO RIVER BANK, BRGY STA. MARIA | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.057 |
| 128 | 25BF0012OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF CASILI CREEK RIVER FLOOD CONTROL PROJECT ALONG PRESIDENT BRIDGE, (MALIGAYA SECTION UPSTREAM), MALL | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 88% | High risk62 | —-0.026 |
| 129 | 25BF0013OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK RIVER FLOOD CONTROL PROJECT ALONG PRESIDENT BRIDGE, (MALIGAYA SECTION DOWNSTREAM), MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 94% | High risk62 | —-0.028 |
| 130 | 24BG0069OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONST/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT ALONG GANANO RIVER BANK,BRGY SAN ANTONIO UPSTREAM, STA 0+000-STA 0+067.9 | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 131 | 24BG0068OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONST/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT ALONG GANANO RIVER BANK,BRGY SAN ANTONIO UPSTREAM STA 0+465.50-STA 0+928 | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 132 | 24BG0089OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF GANANO RIVER FLOOD CONTROL PROJECT, BRGY. APANAY DOWNSTREA | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.055 |
| 133 | 24BH0193SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MASAYA SUR FLOOD CONTROL STRUCTURE, SECTION 1, BARANGAY MASAYA SUR, SAN AGUSTIN ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.053 |
| 134 | 24BH0210SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF BANTAY FLOOD CONTROL STRUCTURE SECTION 1, JONES ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 135 | 24BH0109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE SECTION 2, BARANGAY STO. NIÑO, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.055 |
| 136 | 24BH0108SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE SECTION 1, BARANGAY STO. NIÑO, SAN AGUSTIN, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.055 |
| 137 | 24BH0220SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF DIARAO, FLOOD CONTROL STRUCTURE, SECTION 1, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 138 | 24BH0159SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TUPAX, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 139 | 24BF0013FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN,SIFFU RIVER, SAN PLACIDO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 140 | 24BH0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PONGPONGAN FLOOD CONTROL STRUCTURE, SECTION 1, JONES,ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 141 | 25BF0017OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF TAO TAO RIVER FLOOD CONTROL PROJECT, (PANICIEN SECTION) | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 142 | 25BF0005OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN JOSE NORTE SECTION)BARANGAY SAN JOSE NORTE, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.055 |
| 143 | 25BF0004OO2 FLOOD MANAGEMENT PROGRAM - CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN JOSE SUR SECTION), BARANGAY SAN JOSE SUR, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱96.5M | 94% | High risk61 | —-0.028 |
| 144 | 25BG0023OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY BAGONG SIKAT, SAN MATEO, | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 100% | High risk61 | —-0.036 |
| 145 | 24BG0073OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJ, BRGY. AMBATALI (STA. 0 | Region II | Isabela 3rd DEO | On-Going | ₱96.5M | 92% | High risk61 | —-0.024 |
| 146 | 24BG0100OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL, BARANGAY MAPUROC, SAN MATEO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 147 | 25AF0046CONST./REHAB. OF FLOOD MIT. FACI. W/IN MAJOR BASINS & PRIN. RIVERS -CONST. OF FLOOD CONT. STRUC. ALONG ARINGAY RIVER BASIN, TUBAO, LA UNION (PACKAGE 9), TUBAO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱96.5M | 95% | High risk61 | —-0.029 |
| 148 | 25AF0047CONST.REHAB. OF FLOOD MIT. FACI. W/IN MAJOR RIVER BASINS & PRIN. RIVERS - CONST. OF FLOOD CONT. STRUC. ALONG ARINGAY RIVER BASIN, TUBAO, LA UNION (PACKAGE 10), TUBAO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱96.5M | 95% | High risk61 | —-0.029 |
| 149 | 25AF0051CONST/REHAB OF FLOOD MITI FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONT. STRUC. ALONG ARINGAY RIVER BASIN, BRGY. SAN JUAN EAST, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.058 |
| 150 | 25AF0044CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL ALONG UPSTREAM OF LOSSOC BRIDGE, BAUANG, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.058 |