Contractor dossier
35 projects on file, including joint ventures this contractor is part of.
Total projects
35
Total budget
₱839.7M
Average progress
99.6%
Completion rate
94.3%
Average risk score
43.7
Medium risk on average, out of 100
Flagged as unusual
1
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 33 | ₱790.3M | 42.3 | 1 | 99.6% |
| Region I | 1 | ₱42M | 92.5 | 0 | 100.0% |
| Region II | 1 | ₱7.4M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 12 | ₱232.9M | 37.3 | 0 | 100.0% |
| Buildings and Facilities | 8 | ₱158.1M | 45.7 | 0 | 100.0% |
| Water Provision and Storage | 5 | ₱35.6M | 31.1 | 0 | 100.0% |
| Flood Control and Drainage | 4 | ₱210.4M | 54.8 | 0 | 100.0% |
| Bridges | 3 | ₱8.9M | 27.6 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱94.9M | 93.0 | 1 | 87.3% |
| GAA 2025 OO-1 | 1 | ₱42M | 92.5 | 0 | 100.0% |
| OTHER | 1 | ₱57M | 74.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 25A00175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROSARIO BYPASS ROAD, LA UNION | Region I | Region I | On-Going | ₱42M | 100% | High risk92 | —-0.004 |
| 19PF0029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS ACOP-KAPANGAN-KIBUNGAN-BAKUN RD K0280+430 - K0280 + 500, K0281+900 - K0283 + 950, K0284+020 - K0287 + 000 AND K0348+00 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57M | 100% | High risk75 | —-0.024 |
| 17PE0033CLUSTERED CONSTRUCTION OF MPB PROJECT, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱5.8M | 100% | High risk67 | —-0.060 |
| 17PF0005CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF AMBURAYAN FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.040 |
| 17PF0037CONSTRUCTION OF INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF KAPANGAN SWIP, KELONG CREEK, KAPANGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱23.5M | 100% | High risk65 | —-0.025 |
| 21P00084LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF AMBURAYAN FLOOD CONTROLKAPANGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25P00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 40+076 - STA. 41+151 (R/S), BARANGAY CALAFUG, CONNER, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.9M | 87% | High risk93 | Flagged0.006 |
| 2 | 25A00175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ROSARIO BYPASS ROAD, LA UNION | Region I | Region I | On-Going | ₱42M | 100% | High risk92 | —-0.004 |
| 3 | 19PF0029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS ACOP-KAPANGAN-KIBUNGAN-BAKUN RD K0280+430 - K0280 + 500, K0281+900 - K0283 + 950, K0284+020 - K0287 + 000 AND K0348+00 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57M | 100% | High risk75 | —-0.024 |
| 4 | 17PE0033CLUSTERED CONSTRUCTION OF MPB PROJECT, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱5.8M | 100% | High risk67 | —-0.060 |
| 5 | 17PF0005CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF AMBURAYAN FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.040 |
| 6 | 17PF0037CONSTRUCTION OF INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF KAPANGAN SWIP, KELONG CREEK, KAPANGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱23.5M | 100% | High risk65 | —-0.025 |
| 7 | 21P00084LOCAL PROGRAM: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF AMBURAYAN FLOOD CONTROLKAPANGAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
| 8 | 21P00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS CONG. ANDRES ACOP COSALAN ROAD K0315 + 115 - K0315 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.078 |
| 9 | 20PE0027CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BENGUET - NUEVA VIZCAYA ROAD (S00382LZ), K0254+255 - K0254+370, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48M | 100% | Medium risk48 | —-0.078 |
| 10 | 18PE0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD CONTROL ADAOAY, STA. 17+590 - STA. 18+040, STA.17+880 - STA. 17+940, STA. 18+600 - STA. 18+820, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.067 |
| 11 | 20PF0041CONSTRUCTION OF KAPANGAN MULTI-PURPOSE BUILDING, LOMON, KAPANGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.080 |
| 12 | 18PE0100CONSTRUCTION OF 4 STOREY 6 CLASSROOM 1 REGULAR WORKSHOP 2 SCIENCE LAB 2 ICT LAB SCHOOL BUILDING AT LA TRINIDAD NHS, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱35.8M | 100% | Medium risk47 | —-0.025 |
| 13 | 18PE0101CONSTRUCTION OF 4 STOREY 8 CLASSROOM 2 SCIENCE LAB 2 ICT LAB SCHOOL BUILDING AT EASTERN LA TRINIDAD NHS, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱32.1M | 100% | Medium risk47 | —-0.028 |
| 14 | 18PE0088CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT PUGUIS ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱37.7M | 100% | Medium risk46 | —-0.024 |
| 15 | 18PE0099CONSTRUCTION OF 4 STOREY 4 CLASSROOM 2 SCIENCE LAB 2 ICT LAB SCHOOL BUILDING AT BOKOD NHS ANNEX - DAKLAN, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱26.3M | 100% | Medium risk46 | —-0.033 |
| 16 | 18PE0019REHABILITATION/ MAJOR REPAIR OF BRIDGE - NEW BADIWAN BR. (B01359LZ) ALONG MARCOS HIGHWAY, K0276+885, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱6.1M | 100% | Medium risk45 | —-0.042 |
| 17 | 19PE0032CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN, BOKOD RIVER SECTION, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱37.1M | 100% | Medium risk44 | —-0.069 |
| 18 | 19PE0009CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: RECONSTRUCTION TO CONCRETE PAVEMENT - SPECIFIC LOCATION ALONG GUISSET-BINGA- BALOY-TINONGDAN ROAD LEADING TO BINGA DAM AND MT. UGO, SITE FOR THE INTERNATIONAL SKY RUNNING E | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱14.5M | 100% | Medium risk44 | —-0.084 |
| 19 | 19PE0011CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: RECONSTRUCTION TO CONCRETE PAVEMENT - SPECIFIC LOCATION ALONG TIMBAK CAVES ROAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANO, ATOK/KABAYAN, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱19.5M | 100% | Medium risk44 | —-0.087 |
| 20 | 20PE0096CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-ALONG TAWANG-AMBIONG ROAD (S00387LZ), K0263+870-K0263+900, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱15.6M | 100% | Medium risk44 | —-0.082 |
| 21 | 18PE0086CONSTRUCTION OF 3 STOREY 6 CLASSROOM SCHOOL BUILDING AT ALAPANG CAMP DANGWA ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱13.6M | 100% | Medium risk44 | —-0.039 |
| 22 | 18PF0033NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG BAGUIO-BONTOC ROAD, K0308+000 K0311+000 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱8.5M | 100% | Medium risk43 | —-0.084 |
| 23 | 19BJ0021ASSET PRESERVATION: REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS PAPAYA-MALABING-WANGAL-BINOGAWAN-TADJI-RUNRUNO ROAD, K0295+000-K0295+066, K0295+129-K0295+148, K0297+010-K0297+058 KASIBU, NUEV | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱7.4M | 100% | Medium risk43 | —-0.087 |
| 24 | 21PE0113CONCRETING/ROAD OPENING OF SITIO SAPID, BARANGAY PACSO FMR, BARANGAY PACSO, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱12.4M | 100% | Medium risk40 | —-0.038 |
| 25 | 18PJ0024CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM (RWCS) VARIOUS LOCATION | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱3.2M | 100% | Low risk25 | —-0.048 |