Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱18.5B
Average progress
94.1%
Completion rate
82.2%
Average risk score
53.7
Medium risk on average, out of 100
Flagged as unusual
17
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 94 | ₱6.4B | 62.8 | 11 | 93.6% |
| Region II | 37 | ₱1.3B | 46.6 | 0 | 100.0% |
| Cordillera Administrative Region | 34 | ₱4B | 55.5 | 3 | 99.4% |
| Region III | 25 | ₱461.8M | 23.8 | 0 | 99.7% |
| Region IV-B | 18 | ₱2.3B | 59.6 | 1 | 97.7% |
| Region IV-A | 18 | ₱1.6B | 58.2 | 1 | 76.7% |
| Region XIII | 9 | ₱767.5M | 45.6 | 0 | 100.0% |
| Region V | 7 | ₱454.4M | 60.5 | 1 | 74.3% |
| National Capital Region | 7 | ₱283.5M | 48.1 | 0 | 70.6% |
| Region XII | 2 | ₱97.9M | 27.6 | 0 | 100.0% |
| Central Office | 1 | ₱853.1M | 75.9 | 0 | 100.0% |
| Region VIII | 1 | ₱132.3M | 61.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 118 | ₱10.6B | 54.8 | 8 | 93.5% |
| Flood Control and Drainage | 54 | ₱4.2B | 57.0 | 1 | 92.5% |
| Bridges | 42 | ₱2.9B | 58.6 | 6 | 95.4% |
| Buildings and Facilities | 33 | ₱463.2M | 33.9 | 0 | 99.7% |
| Water Provision and Storage | 3 | ₱130.8M | 67.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱262.3M | 86.7 | 2 | 48.4% |
| GAA 2025 OO-2 | 1 | ₱37.6M | 89.0 | 0 | 93.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00187ROAD WIDENING - PRIMARY ROADS - MANILA NORTH RD - K0489 + 957 - K0489 + 979, K0489 + 996 - K0490 + 000, K0554 + 500 - K0555 + 069, K0555 + 347 - K0555 + 402, K0555 + 498 - K0555 + 534, K0555 + 586 - K0555 + 896, K0555 + 1074 - K0557 + 713, K0558 + 032 - | Region I | Region I | On-Going | ₱119.7M | 39% | High risk94 | Flagged0.033 |
| 25AA0060FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY SAN JOSE, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.6M | 94% | High risk89 | —-0.002 |
| 25EF0042WIDENING OF PERMANENT BRIDGES MACAGUA BR. (B00322PW) ALONG PPSR, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱142.6M | 58% | High risk80 | Flagged0.041 |
| 24AA0427CONCRETING OF SITIO RANG-AY - SITIO SALDET - SITIO PROPER, BRGY. ALEJO MALASIG FMR, BRGY. ALEJO MALASIG, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.2M | 77% | High risk76 | Flagged0.021 |
| 18AA0411CONC. OF BRGY. POBLACION 2-STA. CATALINA FMR, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱34.8M | 100% | High risk76 | —-0.021 |
| 24AA0410CONCRETING OFBRGY. ABKIR FMR, BRGY. ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 72% | High risk76 | Flagged0.024 |
| 19Z00019CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Central Office | Flood Control Management Cluster | Completed | ₱853.1M | 100% | High risk76 | —-0.003 |
| 24AA0423CONCRETING OF BRGY. CABANGARAN FMR, BRGY. CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 89% | High risk76 | Flagged0.018 |
| 24AA0441CONCRETING OF BRGY. DIPILAT FMR BRGY. DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 87% | High risk75 | Flagged0.017 |
| 24A00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAYDAY ROAD (LAOAG CITY SECTION), ILOCOS NORTE | Region I | Region I | On-Going | ₱163.3M | 78% | High risk74 | Flagged0.009 |
| 24A00339CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 59% | High risk74 | Flagged0.024 |
| 24DC0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱188M | 2% | High risk72 | Flagged0.002 |
| 24DC0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱150.5M | 1% | High risk72 | —-0.001 |
| 18A00007ROAD WIDENING - SECONDARY ROADS - LAOAG-AIRPORT RD - K0487+839-K0487+909, K0487+910-K0488+550, K0488+599-K0488+810, K0489+020-K0490+125, K0488+506-K0490+470, K0490+610-K0490+667, K0491+755-K0492+092 | Region I | Region I | Completed | ₱138.6M | 100% | High risk72 | —-0.056 |
| 18A00102CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, ISIC-ISIC (BRIDGE CONSTRUCTION) IN SUPPORT OF FANCY RICE PRODUCTION, AGRO PRODUCTS AND ORGANIC, AQUATIC RESOURCES (EEL, CATFISH, ETC.), ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk72 | —-0.032 |
| 25A00231CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱198.6M | 10% | High risk71 | Flagged0.012 |
| 23AA0033CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN AND TRIBUTARIES, (RIGHT BANK) BUTTONG CREEK, BARANGAY BUTTONG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49M | 100% | High risk71 | —-0.016 |
| 18AA0096CONST. OF FC STRUCTURES ALONG VINTAR RIVER (DOWNSTREAM) STA. 0+000-1+379 BRGY. SAN RAMON VINTAR I.N. | Region I | Ilocos Norte 1st DEO | Completed | ₱46.9M | 100% | High risk71 | —-0.066 |
| 24A00055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱149.6M | 83% | High risk71 | —-0.016 |
| 23AA0111CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG PADSAN RIVER GOING DOWNSTREAM RIGHT SIDE, BARANGAY SUYO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱85.1M | 91% | High risk71 | —-0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EF0042WIDENING OF PERMANENT BRIDGES MACAGUA BR. (B00322PW) ALONG PPSR, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱142.6M | 58% | High risk80 | Flagged0.041 |
| 25F00234ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - IROSIN VIADUCT ALONG DAANG MAHARLIKA, SALVACION, IROSIN, SALVACION, IROSIN, SORSOGON (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱187.1M | 0% | High risk68 | Flagged0.038 |
| 25A00187ROAD WIDENING - PRIMARY ROADS - MANILA NORTH RD - K0489 + 957 - K0489 + 979, K0489 + 996 - K0490 + 000, K0554 + 500 - K0555 + 069, K0555 + 347 - K0555 + 402, K0555 + 498 - K0555 + 534, K0555 + 586 - K0555 + 896, K0555 + 1074 - K0557 + 713, K0558 + 032 - | Region I | Region I | On-Going | ₱119.7M | 39% | High risk94 | Flagged0.033 |
| 24A00339CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 59% | High risk74 | Flagged0.024 |
| 24AA0410CONCRETING OFBRGY. ABKIR FMR, BRGY. ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 72% | High risk76 | Flagged0.024 |
| 24AA0427CONCRETING OF SITIO RANG-AY - SITIO SALDET - SITIO PROPER, BRGY. ALEJO MALASIG FMR, BRGY. ALEJO MALASIG, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.2M | 77% | High risk76 | Flagged0.021 |
| 18PG0051ANTIPOLO-PULA-CAWAYAN-CAMANDAG, ASIPULO, IFUGAO TO AMBAGUIO, NUEVA VIZCAYA ACCESS ROAD, ASIPULO, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱43.2M | 100% | Medium risk54 | Flagged0.020 |
| 24AA0423CONCRETING OF BRGY. CABANGARAN FMR, BRGY. CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 89% | High risk76 | Flagged0.018 |
| 24AA0441CONCRETING OF BRGY. DIPILAT FMR BRGY. DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 87% | High risk75 | Flagged0.017 |
| 23P00052CONSTRUCTION (COMPLETION) OF LANGIDEN BRIDGE, SUYO AND NALNAS - DALAYAP, LANGIDEN AND PIDIGAN, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱178.5M | 100% | High risk68 | Flagged0.013 |
| 25A00231CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱198.6M | 10% | High risk71 | Flagged0.012 |
| 24A00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAYDAY ROAD (LAOAG CITY SECTION), ILOCOS NORTE | Region I | Region I | On-Going | ₱163.3M | 78% | High risk74 | Flagged0.009 |
| 23AA0053SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF LAOAG - VINTAR ROAD (INCLUDING BRIDGE), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱38M | 68% | High risk70 | Flagged0.007 |
| 23P00051CONSTRUCTION (COMPLETION) OF SALNEC-MADALIPAY-DUGONG BRIDGE, SALNEC AND DUGONG, BUCAY, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱159.2M | 100% | High risk67 | Flagged0.006 |
| 24DC0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱188M | 2% | High risk72 | Flagged0.002 |
| 23AA0124SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SARICAO, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱57.9M | 92% | High risk70 | Flagged0.001 |
| 24A00288BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱198M | 95% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22A00216REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0216+720 - K0216+865, K0215+580 - K0215+660 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.076 |
| 127 | 22A00217REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0217+930 - K0218+080, K0217+280 - K0217+345 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.076 |
| 128 | 22A00214REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0214+140 - K0214+380 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.076 |
| 129 | 22A00218REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0218+380 - K0218+520, K0217+600 - K0217+660 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.076 |
| 130 | 22A00213REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0227+630 - K0227+720, K0227+320 - K0227+440 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.077 |
| 131 | 22A00220REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0225+240 - K0225+420 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.077 |
| 132 | 22A00221REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0226+320 - K0226+470, K0225+820 - K0225+910 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.077 |
| 133 | 22A00222REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0226+650 - K0226+800 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.077 |
| 134 | 22A00215REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, PANGASINAN - NUEVA VIZCAYA RD - K0215+660 - K0215+710, K0214+520 - K0214+660 | Region I | Region I | Completed | ₱115.8M | 100% | Medium risk56 | —-0.076 |
| 135 | 21P00066ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - SHILAN - BECKEL ROADKO262+870 - KO263+000, KO263 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱106.2M | 100% | Medium risk56 | —-0.072 |
| 136 | 17EI0188CONSTRUCTION/CONCRETING OF ACCESS ROAD FROM SITIO CAMBAYANG, BRGY. CABUGAO TO BRGY. SAN ISIDRO, BULALACAO, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱33.3M | 100% | Medium risk56 | —-0.002 |
| 137 | 22A00276CONSTRUCTION OF MISSING LINKS/NEW ROADS - PANGASINAN - NUEVA VIZCAYA, PHASE 1, PANGASINAN | Region I | Region I | Completed | ₱101.3M | 100% | Medium risk56 | —-0.077 |
| 138 | 22A00277CONSTRUCTION OF MISSING LINKS/NEW ROADS - PANGASINAN - NUEVA VIZCAYA, PHASE 2, PANGASINAN | Region I | Region I | Completed | ₱101.3M | 100% | Medium risk56 | —-0.078 |
| 139 | 22E00028CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)- ACCESS ROAD LEADING TO ROXAS DIVING SPOTS, STA. 133+396-STA. 134+759; STA. 135+230-STA. 135+517, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱117.1M | 100% | Medium risk56 | —-0.061 |
| 140 | 18BC0086CONSTRUCTION OF CALAYAN PORT AT CALAYAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱69.5M | 100% | Medium risk55 | —-0.050 |
| 141 | 21E00009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG F.B. REYES (BUSUANGA-CORON) ROAD, KO011+121.00-KO011+220.00; KO011+260.00-KO011+393.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱111M | 100% | Medium risk55 | —-0.072 |
| 142 | 25FL0100CONSTRUCTION OF FLOOD MITIGATION AT SAN RAMON, BULAN, SORSOGON (PHASE 4) BRGY. SAN RAMON, BULAN, SOR | Region V | Sorsogon 2nd DEO | On-Going | ₱48.3M | 20% | Medium risk55 | —-0.032 |
| 143 | 18BC0089CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CLAVERIA BYPASS ROAD, INCL. BRIDGE AT CLAVERIA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱93.6M | 100% | Medium risk55 | —-0.024 |
| 144 | 18PG0051ANTIPOLO-PULA-CAWAYAN-CAMANDAG, ASIPULO, IFUGAO TO AMBAGUIO, NUEVA VIZCAYA ACCESS ROAD, ASIPULO, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱43.2M | 100% | Medium risk54 | Flagged0.020 |
| 145 | 17AH0158WIDENING OF PERMANENT BR TO MORE THAN 2 LANES (PRIMARY) AT BUENO BR (B00676LZ) ALONG PANG-TARLAC RD, | Region I | Pangasinan 2nd DEO | Completed | ₱26.2M | 100% | Medium risk53 | —-0.024 |
| 146 | 17BG0040MFO1: NATIONAL ROAD NETWORK SERVICES - CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS/WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, WIDENING OF BRIDGE - BURGOS BR. (B01183LZ) ALONG DAANG MAHARLIKA (LZ) BURGOS, ALICIA, ISABELA, BRIDGE | Region II | Isabela 3rd DEO | Completed | ₱26.7M | 100% | Medium risk53 | —-0.022 |
| 147 | 17BE0044MFO-1 NATIONAL ROAD NETWORK SERVICES CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES, INCLUDING ROW - TO MORE THAN 2 LANES MARANA BR. 2 (B01123LZ) ALONG DAANG MAHARLIKA (LZ) WIDENING OF BRIDGE CITY OF ILAGAN, | Region II | Isabela 1st DEO | Completed | ₱18.8M | 100% | Medium risk53 | —-0.022 |
| 148 | 17AH0138REPLACEMENT OF PERMANENT WEAK BRIDGE AT TEBAG BR. (B02140LZ) ALONG PANG-ZAMBALES RD, BUGALLON, PANG. | Region I | Pangasinan 2nd DEO | Completed | ₱6M | 100% | Medium risk53 | —-0.021 |
| 149 | 22EG0060CLUSTER 1: CONST. OF ROAD WITH DRAINAGE SYSTEM IN PUERTO PRINCESA CITY, PALAWAN, 1.1: CONST. OF ROAD WITH DRAINAGE LEADING TO SAN JOSE NEW MARKET, STA. 0+000-STA. 0+766.15; 1.2: CONST. OF ROAD WITH DRAINAGE SYSTEM, BRGY. SAN MIGUEL, STA. 0+000-STA. 1+540, | Region IV-B | Palawan 3rd DEO | Completed | ₱105.2M | 100% | Medium risk52 | —-0.059 |
| 150 | 23AI0129WIDENING OF PERMANENT BRIDGES - CARAYUNGAN BRIDGE (B00878LZ) ALONG BAKIT-BAKIT JUNCTION - UMINGAN ROAD | Region I | Pangasinan 3rd DEO | Completed | ₱49.2M | 100% | Medium risk52 | —-0.049 |