Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱18.5B
Average progress
94.1%
Completion rate
82.2%
Average risk score
53.7
Medium risk on average, out of 100
Flagged as unusual
17
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 94 | ₱6.4B | 62.8 | 11 | 93.6% |
| Region II | 37 | ₱1.3B | 46.6 | 0 | 100.0% |
| Cordillera Administrative Region | 34 | ₱4B | 55.5 | 3 | 99.4% |
| Region III | 25 | ₱461.8M | 23.8 | 0 | 99.7% |
| Region IV-B | 18 | ₱2.3B | 59.6 | 1 | 97.7% |
| Region IV-A | 18 | ₱1.6B | 58.2 | 1 | 76.7% |
| Region XIII | 9 | ₱767.5M | 45.6 | 0 | 100.0% |
| Region V | 7 | ₱454.4M | 60.5 | 1 | 74.3% |
| National Capital Region | 7 | ₱283.5M | 48.1 | 0 | 70.6% |
| Region XII | 2 | ₱97.9M | 27.6 | 0 | 100.0% |
| Central Office | 1 | ₱853.1M | 75.9 | 0 | 100.0% |
| Region VIII | 1 | ₱132.3M | 61.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 118 | ₱10.6B | 54.8 | 8 | 93.5% |
| Flood Control and Drainage | 54 | ₱4.2B | 57.0 | 1 | 92.5% |
| Bridges | 42 | ₱2.9B | 58.6 | 6 | 95.4% |
| Buildings and Facilities | 33 | ₱463.2M | 33.9 | 0 | 99.7% |
| Water Provision and Storage | 3 | ₱130.8M | 67.7 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱262.3M | 86.7 | 2 | 48.4% |
| GAA 2025 OO-2 | 1 | ₱37.6M | 89.0 | 0 | 93.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00187ROAD WIDENING - PRIMARY ROADS - MANILA NORTH RD - K0489 + 957 - K0489 + 979, K0489 + 996 - K0490 + 000, K0554 + 500 - K0555 + 069, K0555 + 347 - K0555 + 402, K0555 + 498 - K0555 + 534, K0555 + 586 - K0555 + 896, K0555 + 1074 - K0557 + 713, K0558 + 032 - | Region I | Region I | On-Going | ₱119.7M | 39% | High risk94 | Flagged0.033 |
| 25AA0060FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BARANGAY SAN JOSE, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.6M | 94% | High risk89 | —-0.002 |
| 25EF0042WIDENING OF PERMANENT BRIDGES MACAGUA BR. (B00322PW) ALONG PPSR, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱142.6M | 58% | High risk80 | Flagged0.041 |
| 24AA0427CONCRETING OF SITIO RANG-AY - SITIO SALDET - SITIO PROPER, BRGY. ALEJO MALASIG FMR, BRGY. ALEJO MALASIG, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.2M | 77% | High risk76 | Flagged0.021 |
| 18AA0411CONC. OF BRGY. POBLACION 2-STA. CATALINA FMR, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱34.8M | 100% | High risk76 | —-0.021 |
| 24AA0410CONCRETING OFBRGY. ABKIR FMR, BRGY. ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 72% | High risk76 | Flagged0.024 |
| 19Z00019CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Central Office | Flood Control Management Cluster | Completed | ₱853.1M | 100% | High risk76 | —-0.003 |
| 24AA0423CONCRETING OF BRGY. CABANGARAN FMR, BRGY. CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 89% | High risk76 | Flagged0.018 |
| 24AA0441CONCRETING OF BRGY. DIPILAT FMR BRGY. DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 87% | High risk75 | Flagged0.017 |
| 24A00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAYDAY ROAD (LAOAG CITY SECTION), ILOCOS NORTE | Region I | Region I | On-Going | ₱163.3M | 78% | High risk74 | Flagged0.009 |
| 24A00339CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 59% | High risk74 | Flagged0.024 |
| 24DC0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱188M | 2% | High risk72 | Flagged0.002 |
| 24DC0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱150.5M | 1% | High risk72 | —-0.001 |
| 18A00007ROAD WIDENING - SECONDARY ROADS - LAOAG-AIRPORT RD - K0487+839-K0487+909, K0487+910-K0488+550, K0488+599-K0488+810, K0489+020-K0490+125, K0488+506-K0490+470, K0490+610-K0490+667, K0491+755-K0492+092 | Region I | Region I | Completed | ₱138.6M | 100% | High risk72 | —-0.056 |
| 18A00102CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, ISIC-ISIC (BRIDGE CONSTRUCTION) IN SUPPORT OF FANCY RICE PRODUCTION, AGRO PRODUCTS AND ORGANIC, AQUATIC RESOURCES (EEL, CATFISH, ETC.), ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk72 | —-0.032 |
| 25A00231CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱198.6M | 10% | High risk71 | Flagged0.012 |
| 23AA0033CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN AND TRIBUTARIES, (RIGHT BANK) BUTTONG CREEK, BARANGAY BUTTONG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49M | 100% | High risk71 | —-0.016 |
| 18AA0096CONST. OF FC STRUCTURES ALONG VINTAR RIVER (DOWNSTREAM) STA. 0+000-1+379 BRGY. SAN RAMON VINTAR I.N. | Region I | Ilocos Norte 1st DEO | Completed | ₱46.9M | 100% | High risk71 | —-0.066 |
| 24A00055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱149.6M | 83% | High risk71 | —-0.016 |
| 23AA0111CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG PADSAN RIVER GOING DOWNSTREAM RIGHT SIDE, BARANGAY SUYO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱85.1M | 91% | High risk71 | —-0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EF0042WIDENING OF PERMANENT BRIDGES MACAGUA BR. (B00322PW) ALONG PPSR, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱142.6M | 58% | High risk80 | Flagged0.041 |
| 25F00234ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - IROSIN VIADUCT ALONG DAANG MAHARLIKA, SALVACION, IROSIN, SALVACION, IROSIN, SORSOGON (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱187.1M | 0% | High risk68 | Flagged0.038 |
| 25A00187ROAD WIDENING - PRIMARY ROADS - MANILA NORTH RD - K0489 + 957 - K0489 + 979, K0489 + 996 - K0490 + 000, K0554 + 500 - K0555 + 069, K0555 + 347 - K0555 + 402, K0555 + 498 - K0555 + 534, K0555 + 586 - K0555 + 896, K0555 + 1074 - K0557 + 713, K0558 + 032 - | Region I | Region I | On-Going | ₱119.7M | 39% | High risk94 | Flagged0.033 |
| 24A00339CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 59% | High risk74 | Flagged0.024 |
| 24AA0410CONCRETING OFBRGY. ABKIR FMR, BRGY. ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 72% | High risk76 | Flagged0.024 |
| 24AA0427CONCRETING OF SITIO RANG-AY - SITIO SALDET - SITIO PROPER, BRGY. ALEJO MALASIG FMR, BRGY. ALEJO MALASIG, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.2M | 77% | High risk76 | Flagged0.021 |
| 18PG0051ANTIPOLO-PULA-CAWAYAN-CAMANDAG, ASIPULO, IFUGAO TO AMBAGUIO, NUEVA VIZCAYA ACCESS ROAD, ASIPULO, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱43.2M | 100% | Medium risk54 | Flagged0.020 |
| 24AA0423CONCRETING OF BRGY. CABANGARAN FMR, BRGY. CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 89% | High risk76 | Flagged0.018 |
| 24AA0441CONCRETING OF BRGY. DIPILAT FMR BRGY. DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 87% | High risk75 | Flagged0.017 |
| 23P00052CONSTRUCTION (COMPLETION) OF LANGIDEN BRIDGE, SUYO AND NALNAS - DALAYAP, LANGIDEN AND PIDIGAN, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱178.5M | 100% | High risk68 | Flagged0.013 |
| 25A00231CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, LAOAG CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱198.6M | 10% | High risk71 | Flagged0.012 |
| 24A00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DARAYDAY ROAD (LAOAG CITY SECTION), ILOCOS NORTE | Region I | Region I | On-Going | ₱163.3M | 78% | High risk74 | Flagged0.009 |
| 23AA0053SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF LAOAG - VINTAR ROAD (INCLUDING BRIDGE), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱38M | 68% | High risk70 | Flagged0.007 |
| 23P00051CONSTRUCTION (COMPLETION) OF SALNEC-MADALIPAY-DUGONG BRIDGE, SALNEC AND DUGONG, BUCAY, ABRA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱159.2M | 100% | High risk67 | Flagged0.006 |
| 24DC0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BALETE-SAN JOSE DIVE | Region IV-A | Batangas 3rd DEO | On-Going | ₱188M | 2% | High risk72 | Flagged0.002 |
| 23AA0124SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SARICAO, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱57.9M | 92% | High risk70 | Flagged0.001 |
| 24A00288BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱198M | 95% | High risk66 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 19A00080CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF TWO-STOREY BUILDING FOR OFFICERS BARRACKS AT 702 BDE, MANAOAG, PANGASINAN | Region I | Region I | Completed | ₱14.2M | 100% | Medium risk52 | —-0.084 |
| 152 | 19A00079CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONSTRUCTION OF TWO STOREY BUILDING FOR OFFICERS BARRACKS AT 702 BDE., MANAOAG, PANGASINAN | Region I | Region I | Completed | ₱13M | 100% | Medium risk52 | —-0.085 |
| 153 | 20PA0033CONSTRUCTION OF ABANG NORTE FLOOD CONTROL PROJECT, STA.0+000-STA.1+180, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱47.5M | 100% | Medium risk51 | —-0.064 |
| 154 | 20PA0039CONSTRUCTION OF BULBULALA FLOOD CONTROL PROJECT, STA.44+280.80-STA.44+702, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱48.4M | 100% | Medium risk51 | —-0.062 |
| 155 | 20PA0013CONSTRUCTION OF MUDENG FLOOD CONTROL, STA.0+000-STA.1+142, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱47.9M | 100% | Medium risk51 | —-0.061 |
| 156 | 20PA0036CONSTRUCTION OF TAPING FLOOD CONTROL, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.064 |
| 157 | 20PA0025CONSTRUCTION OF TABIOG FLOOD CONTROL PROJECT, STA.0+000-STA.1+269, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.064 |
| 158 | 20DK0101REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE I) INFANTA, QUEZON, K0123+061-K0123+360 | Region IV-A | Quezon 1st DEO | Completed | ₱48.5M | 100% | Medium risk51 | —-0.101 |
| 159 | 20DK0100REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE H) INFANTA, QUEZON, K0122+700-K0122+980 | Region IV-A | Quezon 1st DEO | Completed | ₱47.8M | 100% | Medium risk51 | —-0.101 |
| 160 | 20DK0102REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE J) INFANTA, QUEZON, K0123+724-K0123+876 | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.100 |
| 161 | 19PA0021CONSTRUCTION OF PAKILING FLOOD CONTROL PROJECT STA. 65+500-STA. 65+909.2, PAKILING, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.065 |
| 162 | 19AH0011RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE AT SAPANG BR.(B01320LZ)ALONG MANGALDAN-MANAOAG-BINALO | Region I | Pangasinan 2nd DEO | Completed | ₱48.6M | 100% | Medium risk50 | —-0.048 |
| 163 | 20PA0035CONSTRUCTION OF TUDAY-POBLACION FLOOD CONTROL, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.060 |
| 164 | 19A00126CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS,CONSTRUCTION /REHABILITATION OF SANTA MARIA-SAN QUINTIN ROAD, PANGASINAN | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk50 | —-0.085 |
| 165 | 20PA0043CONSTRUCTION OF TOON SUR FLOOD CONTROL PROJECT STA.0+000-STA.1+105, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.8M | 100% | Medium risk50 | —-0.062 |
| 166 | 19PA0050CONSTRUCTION OF TABIOG FLOOD CONTROL PROJECT BUCAY, ABRA STA. 0+000-STA. 1+269 | Cordillera Administrative Region | Abra DEO | Completed | ₱45.6M | 100% | Medium risk50 | —-0.061 |
| 167 | 25OA0003CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 6, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 50% | Medium risk50 | —-0.041 |
| 168 | 25OA0004CONSTRUCTION OF RIVERWALLS ALONG TANGOS RIVER, PHASE 7, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 96% | Medium risk50 | —-0.054 |
| 169 | 20PA0028CONSTRUCTION OF CARDONA FLOOD CONTROL, STA.5+240-STA.6+440, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.8M | 100% | Medium risk50 | —-0.064 |
| 170 | 20PA0031CONSTRUCTION OF TOON NORTE FLOOD CONTROL PROJECT, STA.0+630.4-STA.1+052, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱45.8M | 100% | Medium risk50 | —-0.061 |
| 171 | 18BE0075WIDENING OF PERMANENT BRIDGES - MANGA BR. (BO1140 LZ) ALONG DAANG MAHARLIKA (LZ) SAN PABLO, ISABELA | Region II | Isabela 1st DEO | Completed | ₱29.8M | 100% | Medium risk49 | —-0.045 |
| 172 | 19AI0211CONSTRUCTION OF LA PAZ BRIDGE FROM SAN QUINTIN TO UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱37.7M | 100% | Medium risk49 | —-0.053 |
| 173 | 20PA0023CONSTRUCTION OF QUIDAOEN FLOOD CONTROL PROJECT, STA.0+000-STA.0+885, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱39.2M | 100% | Medium risk49 | —-0.064 |
| 174 | 21AB0020WIDENING OF PERMANENT BRIDGES, TIPCAL BRIDGE (B00567LZ) ALONG MANILA NORTH ROAD, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk49 | —-0.042 |
| 175 | 17OE0004MFO 1-NATIONAL ROAD NETWORK SERVICES REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY-4 M. ROXAS JR. BRIDGE, MANILA | National Capital Region | North Manila DEO | Completed | ₱6.9M | 100% | Medium risk49 | —-0.067 |