Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱4.3B
Average progress
93.8%
Completion rate
83.2%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
11
6.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 85 | ₱2.1B | 47.0 | 6 | 92.2% |
| Region VI | 77 | ₱1.8B | 43.0 | 3 | 97.9% |
| Region VII | 6 | ₱374.8M | 62.1 | 2 | 59.4% |
| Region IV-B | 5 | ₱64.1M | 36.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 69 | ₱2B | 47.4 | 2 | 93.9% |
| Buildings and Facilities | 50 | ₱354.8M | 38.1 | 1 | 99.7% |
| Flood Control and Drainage | 29 | ₱1.4B | 54.3 | 5 | 86.0% |
| Water Provision and Storage | 18 | ₱79.3M | 32.0 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱170.7M | 94.4 | 2 | 39.1% |
| GAA 2025 OO-1 | 2 | ₱115.1M | 92.6 | 0 | 86.6% |
| OTHER | 2 | ₱13.5M | 50.9 | 0 | 100.0% |
| Bridges | 1 | ₱95.5M | 62.9 | 1 | 16.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RE0015CONSTRUCTION OF FLOOD MITIGATING STRUCTURE- MAGBABOY RIVER (UPSTREAM), SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱98.7M | 71% | High risk95 | Flagged0.022 |
| 25GQ0006ROAD WIDENING ALONG BACOLOD NORTH RD (S00425NR) - K0135+898 - K0139+053 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱100.9M | 97% | High risk95 | —-0.002 |
| 25GQ0053CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT KATINGAL-AN CREEK, ALONG BACOLOD NORTH ROAD RD (S00425NR), SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱72M | 7% | High risk94 | Flagged0.036 |
| 25GQ0025ROAD WIDENING ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) - K0082+700 - K0083+000, K0083+544-K0083+714 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱14.2M | 76% | High risk90 | —-0.003 |
| 23HO0275CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. UNO - BRGY. STO. NIÑO, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0259ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT BRGY. UNO, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 17R00003REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG BACOLOD - MURCIA - DS BENEDICTO - SAN CARLOS CITY ROAD (S00009NR), K0036+058 - K0036+785; K0048+460 - K0048+724; K0060+000 - K0061+099; K0062+601 - K0063+00 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.2M | 100% | High risk71 | —-0.049 |
| 22G00082CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BAGO RIVER (UPSTREAM - LEFT SIDE), DON SALVADOR BENEDICTO, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱48.2M | 100% | High risk71 | —-0.045 |
| 16R00084ROAD UPGRADING (UNPAVED TO PAVED) OF PROSPERIDAD - QUEZON - CABARON RD (S00402NR), K0073+881 -K0074+772; K0074+792 - K0075+549; K0078+911 - K0079+187; K0079+247 - K0079+289; K0079+389 - K0080+072.50, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱91.5M | 100% | High risk69 | —-0.051 |
| 23HM0133CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT CAMOGAO, ENRIQUE VILLANUEVA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.2M | 85% | High risk68 | Flagged0.043 |
| 23HM0130CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT CAMOGAO, ENRIQUE VILLANUEVA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱38.2M | 100% | High risk67 | Flagged0.005 |
| 24GH0027OFF CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING- BAROTAC VIEJO- SAN RAFAEL RD- K0082+467- K0083+280, K0083+304- K0083+379, K0083+415- K0083+496, K0083+522- K0084+280 | Region VI | Iloilo 3rd DEO | Completed | ₱20.3M | 100% | High risk67 | —-0.055 |
| 25RE0016CONSTRUCTION OF FLOOD CONTROL STRUCTURES PALAMPAS RIVER, BARANGAY 1, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱143.3M | 0% | High risk67 | Flagged0.004 |
| 24GQ0065CONSTRUCTION OF MULTI- PURPOSE BUILDING IN SAN CARLOS, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱5.2M | 100% | High risk65 | —-0.055 |
| 24HM0012OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0028+000 - K0029+260 | Negros Island Region | Siquijor DEO | On-Going | ₱29.4M | 70% | High risk65 | —-0.022 |
| 24HM0097CONCRETING OF BRGY. CANTABON FMR, BRGY. CANTABON, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱14.9M | 50% | High risk65 | Flagged0.038 |
| 20GK0064REHABILITATION/MAJOR REPAIR OF MULTI-PURPOSE BUILDING - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. LO-OK, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱7.5M | 100% | High risk65 | —-0.060 |
| 20GK0053CONSTRUCTION OF SCHOOL BUILDING - CONSTRUCTION OF SCHOOL BUILDING, NONESCOST LAGAAN EXT. CAMPUS, BRGY. LAGAAN, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱7.5M | 100% | High risk65 | —-0.059 |
| 25GK0112PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0088 + 596 - K0091 + 537 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144M | 61% | High risk64 | —-0.040 |
| 20G00049CONSTRUCTION OF CONCRETE ROAD - SILAY-PATAG-CADIZ-CALATRAVA ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱181.3M | 100% | High risk63 | —-0.046 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0275CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. UNO - BRGY. STO. NIÑO, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0259ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT BRGY. UNO, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HM0133CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT CAMOGAO, ENRIQUE VILLANUEVA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.2M | 85% | High risk68 | Flagged0.043 |
| 24HM0097CONCRETING OF BRGY. CANTABON FMR, BRGY. CANTABON, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱14.9M | 50% | High risk65 | Flagged0.038 |
| 25GQ0053CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT KATINGAL-AN CREEK, ALONG BACOLOD NORTH ROAD RD (S00425NR), SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱72M | 7% | High risk94 | Flagged0.036 |
| 23G00036REPLACEMENT OF BRIDGE- TALAVE BR. (B00182NR) ALONG BACOLOD NORTH RD. | Region VI | Region VI | On-Going | ₱95.5M | 16% | High risk63 | Flagged0.031 |
| 25RE0015CONSTRUCTION OF FLOOD MITIGATING STRUCTURE- MAGBABOY RIVER (UPSTREAM), SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱98.7M | 71% | High risk95 | Flagged0.022 |
| 24GQ0080CONSTRUCTION OF SCHOOL BUILDING, DON CARLOS LEDESMA NHS, SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱30.2M | 86% | Medium risk48 | Flagged0.006 |
| 23HM0130CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT CAMOGAO, ENRIQUE VILLANUEVA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱38.2M | 100% | High risk67 | Flagged0.005 |
| 25RE0016CONSTRUCTION OF FLOOD CONTROL STRUCTURES PALAMPAS RIVER, BARANGAY 1, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱143.3M | 0% | High risk67 | Flagged0.004 |
| 22G00150CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD (S00427NR) K0077+520 - K0078+662 | Region VI | Region VI | On-Going | ₱96.5M | 34% | Medium risk59 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23HM0037002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱9.8M | 87% | Medium risk48 | —-0.016 |
| 52 | 23GL0080CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION AT HDA ANTOLANGA, BRGY. TINONGAN, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.066 |
| 53 | 23HM0026OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0033+000 - K0033+630 | Negros Island Region | Siquijor DEO | On-Going | ₱24.3M | 99% | Medium risk48 | —-0.047 |
| 54 | 20HM0068002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES/SHORE PROTECTION AT POBLACION - BINOONGAN - CAMOGAO - | Negros Island Region | Siquijor DEO | Completed | ₱14M | 100% | Medium risk48 | —-0.062 |
| 55 | 21HM0025LOCAL PROGRAM, LOCAL ROADS AND BRIDGES LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF NAGERONG TAGMANOCAN CAPALASANAN CANTUGBAS CANTAROC A ROAD, | Negros Island Region | Siquijor DEO | Completed | ₱17.7M | 100% | Medium risk48 | —-0.089 |
| 56 | 20HM0014CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, BASAC - PISONG B ROAD LEADING TO CANGBANGAG FALLS, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.089 |
| 57 | 24HM0026OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0054 - 000 - K0054 + 480 | Negros Island Region | Siquijor DEO | On-Going | ₱18.8M | 97% | Medium risk48 | —-0.055 |
| 58 | 19HM0054LOCALLY FUNDED PROJECTS, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, ENRIQUE VILLANUEVA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱8.5M | 100% | Medium risk48 | —-0.086 |
| 59 | 20HM0093OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS SIQUIJOR CIRCUMFERENTIAL ROAD - K0047+588 - K0047+806, LAZI, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.090 |
| 60 | 22HM0034OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0030+000 - K0030+418.50 | Negros Island Region | Siquijor DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.089 |
| 61 | 20HM0017CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, GABAYAN-TALAYONG-LOWER CABANGCALAN-CAMPALANAS ROAD LEADING TO MARINE PROTECTIVE AREAS DIVING SITE AND BEACH RESORTS, BRGY. GABAYAN, | Negros Island Region | Siquijor DEO | Completed | ₱17.7M | 100% | Medium risk47 | —-0.089 |
| 62 | 20HM0083LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANDANAY NORTE, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.085 |
| 63 | 20HM0028CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, CANGMANGKI ROAD CONNECTING TO MANUFACTURING SITE AND NATIONAL HIGHWAY IN SUPPORT OF BURI GDH INDUSTRIES, CANGMANGKI, ENRIQU | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 64 | 20HM0016CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CANLAMBO-BALOLONG-BITANGAN ROAD, BRGY. CANLAMBO, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 65 | 19HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, PISONG A-PISONG B ROAD LEADING TO CANGBANGAG FALLS, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 66 | 19HM0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, BASAC-PISONG B ROAD LEADING TO CANGBANGAG FALLS, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.089 |
| 67 | 22HM0053OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0051+313 - K0051+731.5 | Negros Island Region | Siquijor DEO | On-Going | ₱9.7M | 59% | Medium risk47 | —-0.026 |
| 68 | 23HM0027OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0059+691 - K0060+000 | Negros Island Region | Siquijor DEO | On-Going | ₱12M | 89% | Medium risk47 | —-0.048 |
| 69 | 24HO0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL, PHASE 2, BARANGAY UNO - BARANGAY S | Region VII | Cebu 7th DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.077 |
| 70 | 23GQ0056REHABILITATION OF OF MULTI-PURPOSE BUILDING (CITY HALL ANNEX BUILDING), BRGY. PALAMPAS, SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱9.8M | 100% | Medium risk47 | —-0.080 |
| 71 | 24GQ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (DPWH NEGROS OCCIDENTAL SUB-DEO QUARTERS), SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱9.7M | 100% | Medium risk47 | —-0.079 |
| 72 | 20GK0063CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PALAMPAS, SAN CARLOS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱18.8M | 100% | Medium risk47 | —-0.083 |
| 73 | 20HM0005001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD-K0019+152-K0020+545, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱14.4M | 100% | Medium risk47 | —-0.089 |
| 74 | 21G00089CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAND TRANSPORTATION OFFICE, BARANGAY PUNAO, SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱5.9M | 100% | Medium risk47 | —-0.079 |
| 75 | 21G00172CONSTRUCTION OF MULTI-PURPOSE BUILDING, 1ST ENGINEERING DISTRICT OFFICE, BARANGAY PUNAO, SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱6.4M | 100% | Medium risk47 | —-0.079 |