Contractor dossier
164 projects on file, including joint ventures this contractor is part of.
Total projects
164
Total budget
₱9.5B
Average progress
92.5%
Completion rate
79.9%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
3
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 163 | ₱9.4B | 54.7 | 3 | 92.5% |
| National Capital Region | 1 | ₱96.5M | 60.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 65 | ₱3.5B | 53.2 | 1 | 93.6% |
| Flood Control and Drainage | 50 | ₱3.4B | 56.1 | 0 | 93.8% |
| Buildings and Facilities | 22 | ₱921.5M | 49.7 | 1 | 90.9% |
| Bridges | 12 | ₱551.8M | 51.0 | 1 | 87.1% |
| OTHER | 10 | ₱708.1M | 69.1 | 0 | 95.5% |
| Bridges, Roads | 5 | ₱400.7M | 62.6 | 0 | 80.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0218CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A | Region IV-A | Cavite 1st DEO | On-Going | ₱47.5M | 0% | High risk74 | —-0.010 |
| 25DF0174CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESIMPROVEMENT OF ROAD AND DRAINAGE SYSTEM AT THE IMUS PUBLIC MARKET T | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk73 | —-0.013 |
| 18D00069CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTSLOCAL ROADS AND BRIDGESLOCAL ROADSWIDENING OF CONGRESSIONAL ROAD (FROM UNIVERSITY HILLS TO BALUCTOT RIVER WITH BRIDGE), DASMARIÑAS, CAVITE | Region IV-A | Region IV-A | Completed | ₱105.1M | 100% | High risk73 | —-0.012 |
| 23DQ0050CONSTRUCTION OF SLOPE PROTECTION ALONG IMUS RIVER (TRIBUTARY TO MANILA BAY), PHASE 2, EAST SIDE, BARANGAY FATIMA, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.022 |
| 17DQ0022MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG AMUNTAY RIVER, PHASE II, WEST SIDE, BRGY. SAN AGUSTIN II, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALO | Region IV-A | Cavite 3rd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.060 |
| 24DF0050ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSCARSADANG BAGO - MALAGASANG DIVERSION ROAD, CARSADANG BAGO SECTION, SEGMENT 4, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱77.2M | 100% | High risk71 | —-0.006 |
| 23DQ0038CONSTRUCTION OF SLOPE PROTECTION ALONG IMUS RIVER (TRIBUTARY TO MANILA BAY), EAST SIDE, BARANGAY SALITRAN III, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱91.7M | 100% | High risk71 | —-0.025 |
| 23DF0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSCARSADANG BAGO - MALAGASANG DIVERSION ROAD, BUCANDALA SECTION, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.2M | 100% | High risk71 | —-0.032 |
| 23DQ0043CONSTRUCTION OF ROAD, BARANGAY SAN MARINO, DASMARIÑAS, CAVITE AND CONSTRUCTION OF NIA ROAD, BARANGAY SALAWAG, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱82.4M | 100% | High risk71 | —-0.026 |
| 24DF0294REHABILITATION/REPAIR OF REVETMENT WITH CONCRETE PAVEMENTALONG JULIAN RIVER, BARANGAY ANABU II-C, IMUS, CAVITE WHICH WAS DAMAGED BY TROPICAL STORM 'ENTENG' LAST SEPTEMBER 2, 2024 | Region IV-A | Cavite 1st DEO | On-Going | ₱50.2M | 85% | High risk70 | —-0.010 |
| 17D00037MFO-1 NAT'L. ROAD NETWORK SERVICES NETWORK DEV'T. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS CAVITE-BATANGAS ROAD, CAVITE | Region IV-A | Region IV-A | Completed | ₱48.9M | 99% | High risk70 | —-0.036 |
| 24DQ0066CONSTRUCTION OF CONGRESSIONAL-SAN MARINO ROAD, BARANGAY BUROL 3, DASMARINAS, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱49.5M | 71% | High risk69 | —-0.002 |
| 17DQ0039LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP)- ROADS AND BRIDGES - LOCAL ROADS - CONCRETING PORTION OF CONGRESSIONAL ROAD FROM BRGY. LUZVIMIND TO BRGY SAMPALOC IV, CAVITE AND CONCRETING OF FRANCISCO BARZAGA ROAD CAVITE, DASMARINAS CITY, CAV | Region IV-A | Cavite 3rd DEO | Completed | ₱47M | 100% | High risk68 | —-0.073 |
| 24DQ0075CONSTRUCTION OF ROAD LEADING TO PUBLIC UNIVERSITY AT BARANGAY BUROL, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱29.4M | 99% | High risk68 | —-0.014 |
| 20D00063LOCAL PROGRAM, CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCL. LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, CONSTRUCTION OF BYPASS/ ALTERNATE/DIVERSION ROAD-GOVERNOR;S DRIVE TO MOLINO-PALIPARAN ROAD, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.2M | 100% | High risk68 | —-0.050 |
| 17DQ0021MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER, PHASE II, EAST SIDE, BRGY. PALIPARAN 3, DASMARINAS, CAVITE AND CONSTRUCTION OF REVETMENT ALONG | Region IV-A | Cavite 3rd DEO | Completed | ₱46.3M | 100% | High risk68 | —-0.060 |
| 25DQ0053CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG IMUS RIVER, PHASE 1, BARANGAY SAN AGUSTIN, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱141.9M | 25% | High risk68 | —-0.015 |
| 25DQ0052CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG IMUS RIVER, PHASE 2, BARANGAY SAN AGUSTIN, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱141.9M | 29% | High risk68 | —-0.017 |
| 20DQ0045ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT AT BALUCTOT RIVER, BRGY. SAMPALOC IV, DASMARIÑ | Region IV-A | Cavite 3rd DEO | Completed | ₱36.7M | 100% | High risk68 | —-0.060 |
| 17DQ0018MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG IMUS RIVER AT BRGY. SALITRAN, DASMARINAS, CAVITE AND CONSTRUCTION OF SLOPE PROTECTION ALONG IMUS RIVER | Region IV-A | Cavite 3rd DEO | Completed | ₱7.3M | 100% | High risk67 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DF0136ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMBRIDGE PROGRAMRETROFITTING/ STRENGTHENING OF PERMANENT BRIDGESIMUS BR. (B02903LZ) ALONG CAVITE-BATANGAS RD | Region IV-A | Cavite 1st DEO | On-Going | ₱14.3M | 0% | Medium risk55 | Flagged0.011 |
| 24DQ0108CONSTRUCTION OF 4STY16CL, DASMARINAS NORTH NATIONAL HIGH SCHOOL (ANNEX G), CITY OF DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱52.7M | 53% | Medium risk52 | Flagged0.011 |
| 23DQ0146UPGRADING OF ROADS AND REHABILITATION OF EXISTING DRAINAGE AND SIDEWALK FROM THE CORNER OF CONGRESSIONAL AVENUE TO CARLOS TRINIDAD AVENUE COVERING BARANGAYS STA. LUCIA, SAN DIONISIO, SAN ESTEBAN AND STO. CRISTO, CITY OF DASMARIÑAS, PROVINCE OF CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱57.9M | 75% | Medium risk58 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20DH0028CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. MASIKAP, MABITAC, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱13.9M | 100% | Medium risk50 | —-0.089 |
| 102 | 20DQ0012LOCAL PROGRAM: CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT EAST SIDE OF BARANGAY BUROL MAIN, SAMPALOC I | Region IV-A | Cavite 3rd DEO | Completed | ₱48.2M | 100% | Medium risk50 | —-0.079 |
| 103 | 19DQ0092LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - REHABILITATION OF BRIDGE (RIPRAPPING), BARANGAY IBA, SILANG, CAVITE, REHABILITATION OF FOOT BRIDGE, BARANGAY KAONG, SILANG, CAVITE, LOCAL PROGRAM - LOCAL INFRASTRUCTU | Region IV-A | Region IV-A | Completed | ₱43.4M | 100% | Medium risk50 | —-0.089 |
| 104 | 19DQ0025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.080 |
| 105 | 19DQ0024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.083 |
| 106 | 19DQ0099ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT FROM BALUCTOT R | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.084 |
| 107 | 18DQ0027ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIVER | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.086 |
| 108 | 18DQ0019ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENTALONG IMUS R | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.086 |
| 109 | 18DQ0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENTALONG IMUS R | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.086 |
| 110 | 18DQ0018ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENTALONG IMUS R | Region IV-A | Region IV-A | Completed | ₱48.7M | 100% | Medium risk49 | —-0.086 |
| 111 | 22DQ0020ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (REVETMENT) ALONG CARMO | Region IV-A | Cavite 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 112 | 18DQ0104CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT LANGKAAN ELEMENTARY SCHOOL, DASMARINAS CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱40.8M | 100% | Medium risk49 | —-0.051 |
| 113 | 20DF0019ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJORFLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF REVETMENT ALONG IMUS RIVE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 114 | 18DQ0111CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SAN NICOLAS ELEMENTARY SCHOOL, DASMARINAS CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱40.3M | 100% | Medium risk49 | —-0.047 |
| 115 | 18DQ0143COMPLETION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING FRANCISCO E. BARZAGA MEMORIAL SCHOOL, COMPLETION OF 4 STOREY 8 CLASSROOM SCHOOL BUILDING PALIPARAN II NATIONAL HIGH SCHOOL, COMPLETION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING FRANCISCO E. BARZAGA NATION | Region IV-A | Region IV-A | Completed | ₱42M | 100% | Medium risk49 | —-0.049 |
| 116 | 17DQ0111CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOLBUILDING AT DASMARINAS NATIONAL HIGH SCHOOL, DASMARINAS, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱51.7M | 100% | Medium risk48 | —-0.019 |
| 117 | 24DQ0064CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN SALITRAN INTEGRATED HIGH SCHOOL, BARANGAY SALITRAN 4, CITY OF DASMARIÑAS, PROVINCE OF CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱36.9M | 98% | Medium risk48 | —-0.010 |
| 118 | 23DQ0049CONSTRUCTION OF DASMARIÑAS-GENERAL MARIANO ALVAREZ-CARMONA BYPASS ROAD, DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱38.6M | 100% | Medium risk48 | —-0.062 |
| 119 | 21DQ0097LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF BRIDGE ALONG CONGRESSIONAL AVE., EXTENSION (CONGRESSIONAL- GOVERNOR'S DRIVE | Region IV-A | Cavite 3rd DEO | Completed | ₱38.6M | 100% | Medium risk48 | —-0.065 |
| 120 | 20DQ0044LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - WIDENING OF BRIDGE AT BALUCTOT RIVER LEADING TO BRGY. PALIPARAN I, SAMPALOC IV, DASMARIÑAS, | Region IV-A | Cavite 3rd DEO | Completed | ₱38.6M | 100% | Medium risk48 | —-0.065 |
| 121 | 24DQ0102CONSTRUCTION OF BRIDGE ALONG GOV. D MANGUBAT AVENUE AT PROMENADE DES DASMARIÑAS, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱39.2M | 76% | Medium risk48 | —-0.027 |
| 122 | 19DQ0129CONCRETING OF BRGY. SAMPALOC III FMR, BRGY. SAMPALOC, DASMARIÑAS, CAVITE AND CONCRETING OF BRGY. SALAWAG FMR, BRGY. SALAWAG, DASMARIÑAS, CAVITE | Region IV-A | Region IV-A | Completed | ₱16.1M | 100% | Medium risk48 | —-0.053 |
| 123 | 22DQ0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REPLACEMENT OF BRIDGES - PANAPAAN BRIDGE ALONG MANILA-CAVITE (NCR BDRY-JCT CAVIT | Region IV-A | Cavite 3rd DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.057 |
| 124 | 19DQ0137LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - WIDENING OF BRIDGE AT BALUCTOT RIVER LEADING TO BRGY. PALIPARAN I, SAMPALOC IV, DASMARIÑAS, C | Region IV-A | Region IV-A | Completed | ₱19.3M | 100% | Medium risk48 | —-0.068 |
| 125 | 23DQ0066CONSTRUCTION OF ROAD NETWORKS, VILLA ISABEL VILLAGE, BRGY. BUROL MAIN, DASMARIÑAS, CAVITE; REHABILITATION OF ROAD LEADING TO THE CITY COLLEGE OF DASMARIÑAS, BARANGAY BUROL MAIN, CITY OF DASMARIÑAS, CAVITE AND REHABILITATION OF PALIPARAN-SILANG ROAD FROM G | Region IV-A | Cavite 3rd DEO | Completed | ₱44.5M | 100% | Medium risk48 | —-0.106 |