Contractor dossier
89 projects on file, including joint ventures this contractor is part of.
Total projects
89
Total budget
₱10B
Average progress
91.1%
Completion rate
73.0%
Average risk score
60.2
High risk on average, out of 100
Flagged as unusual
9
10.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 43 | ₱3B | 54.3 | 2 | 95.6% |
| Region VIII | 39 | ₱5.2B | 65.8 | 4 | 91.8% |
| Central Office | 3 | ₱1.4B | 77.5 | 3 | 41.3% |
| Cordillera Administrative Region | 3 | ₱335.3M | 58.2 | 0 | 100.0% |
| Region IV-A | 1 | ₱89.4M | 56.4 | 0 | 0.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 53 | ₱6.2B | 56.7 | 2 | 96.0% |
| Flood Control and Drainage | 18 | ₱1.5B | 56.8 | 0 | 94.2% |
| OTHER | 8 | ₱1.3B | 81.1 | 5 | 78.6% |
| Bridges | 5 | ₱368.8M | 54.9 | 1 | 66.1% |
| GAA 2025 OO-2 | 3 | ₱285.3M | 92.5 | 0 | 69.2% |
| GAA 2025 OO-1 | 1 | ₱289.3M | 94.8 | 1 | 60.1% |
| Buildings and Facilities | 1 | ₱23.2M | 38.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00162NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 60% | High risk95 | Flagged0.038 |
| 25IG0024CONSTRUCTION OF FLOOD CONTROL PROTECTION, BARANGAY PA-A, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱135.9M | 87% | High risk93 | —-0.001 |
| 25KM0014CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG MANDULOG RIVER (DIGKILAAN BRIDGE SECTION), PACKAGE 1, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.4M | 83% | High risk93 | —-0.014 |
| 25IG0067CONSTRUCTION OF SALOG FLOOD CONTROL STRUCTURE AT (DOWNSTREAM SECTION), HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱53.1M | 38% | High risk92 | —-0.003 |
| 24I00024CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE | Region VIII | Region VIII | On-Going | ₱240.1M | 91% | High risk84 | Flagged0.036 |
| 18I00016CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱286.9M | 100% | High risk84 | Flagged0.024 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 18I00042ROAD WIDENING - PRIMARY ROADS, LIBUNGAO - MATAG-OB - PALOMPON ROAD, KO991+(-079) - KO992+667; KO992+723.40 - KO994+299; KO994+320.46 - KO996+151; KO996+167.25 - KO997+180, LEYTE 4TH DISTRICT | Region VIII | Region VIII | Completed | ₱158M | 100% | High risk83 | —-0.006 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 25I00177CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱72.3M | 20% | High risk82 | Flagged0.020 |
| 24KM0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANDULOG RIVER, BARANGAY MANDULOG, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.5M | 100% | High risk79 | —-0.002 |
| 23K00088REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, MARAWI-MALABANG ROAD - (S01652MN) CHAINAGE 16300 - CHAINAGE 18800 | Region X | Region X | Completed | ₱46.8M | 100% | High risk72 | —-0.040 |
| 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 24I00071CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱146.3M | 77% | High risk66 | —-0.011 |
| 25K00193WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱143.3M | 35% | High risk65 | Flagged0.005 |
| 19I00122CLUSTER II: 1. REPAIR/REHAB. OF DAMAGED PAVED ROADS ALONG TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD., K1036+800 - K1036+950, K1037+340 - K1037+500, K1037+620 - K1037+650, K1037+820 - K1038+020, K1038+150 - K1038+280, LEYTE 3RD LD; 2. REPAIR/K | Region VIII | Region VIII | Completed | ₱125.2M | 100% | High risk65 | —-0.022 |
| 18I00003NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA INCLUDING RROW, KO982+200-KO983+000; KO983+000-KO983+143; KO983+216-KO983+321; KO987+000-KO988+000; KO988+000-KO989+000; KO991+000-KO991+900; KO993+400-KO994+600, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱192.9M | 100% | High risk64 | —-0.054 |
| 18I00014ROAD WIDENING - PRIMARY ROADS - ALONG DAANG MAHARLIKA INCLUDING RROW, KO976+092 - KO977+190, KO977+198 - KO978+000; KO978+000 - KO980+441; KO980+457 - KO981+000, LEYTE 5TH DISTRICT | Region VIII | Region VIII | Completed | ₱172.8M | 100% | High risk64 | —-0.058 |
| 21I00072CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱140.9M | 100% | High risk64 | —-0.067 |
| 24I00011CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱142.2M | 95% | High risk64 | —-0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00162NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 60% | High risk95 | Flagged0.038 |
| 24I00024CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE | Region VIII | Region VIII | On-Going | ₱240.1M | 91% | High risk84 | Flagged0.036 |
| 18I00016CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱286.9M | 100% | High risk84 | Flagged0.024 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 25I00177CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱72.3M | 20% | High risk82 | Flagged0.020 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 25K00193WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱143.3M | 35% | High risk65 | Flagged0.005 |
| 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 18KG0064REHABILITATION OF POONA KAPATAGAN-LINDONGAN FMR, TANGKAL, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk45 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25I00162NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 60% | High risk95 | Flagged0.038 |
| 2 | 25IG0024CONSTRUCTION OF FLOOD CONTROL PROTECTION, BARANGAY PA-A, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱135.9M | 87% | High risk93 | —-0.001 |
| 3 | 25KM0014CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG MANDULOG RIVER (DIGKILAAN BRIDGE SECTION), PACKAGE 1, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.4M | 83% | High risk93 | —-0.014 |
| 4 | 25IG0067CONSTRUCTION OF SALOG FLOOD CONTROL STRUCTURE AT (DOWNSTREAM SECTION), HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱53.1M | 38% | High risk92 | —-0.003 |
| 5 | 24I00024CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE | Region VIII | Region VIII | On-Going | ₱240.1M | 91% | High risk84 | Flagged0.036 |
| 6 | 18I00016CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱286.9M | 100% | High risk84 | Flagged0.024 |
| 7 | 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 8 | 18I00042ROAD WIDENING - PRIMARY ROADS, LIBUNGAO - MATAG-OB - PALOMPON ROAD, KO991+(-079) - KO992+667; KO992+723.40 - KO994+299; KO994+320.46 - KO996+151; KO996+167.25 - KO997+180, LEYTE 4TH DISTRICT | Region VIII | Region VIII | Completed | ₱158M | 100% | High risk83 | —-0.006 |
| 9 | 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 10 | 25I00177CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱72.3M | 20% | High risk82 | Flagged0.020 |
| 11 | 24KM0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANDULOG RIVER, BARANGAY MANDULOG, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.5M | 100% | High risk79 | —-0.002 |
| 12 | 23K00088REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, MARAWI-MALABANG ROAD - (S01652MN) CHAINAGE 16300 - CHAINAGE 18800 | Region X | Region X | Completed | ₱46.8M | 100% | High risk72 | —-0.040 |
| 13 | 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 14 | 24I00071CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱146.3M | 77% | High risk66 | —-0.011 |
| 15 | 25K00193WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱143.3M | 35% | High risk65 | Flagged0.005 |
| 16 | 19I00122CLUSTER II: 1. REPAIR/REHAB. OF DAMAGED PAVED ROADS ALONG TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD., K1036+800 - K1036+950, K1037+340 - K1037+500, K1037+620 - K1037+650, K1037+820 - K1038+020, K1038+150 - K1038+280, LEYTE 3RD LD; 2. REPAIR/K | Region VIII | Region VIII | Completed | ₱125.2M | 100% | High risk65 | —-0.022 |
| 17 | 18I00003NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA INCLUDING RROW, KO982+200-KO983+000; KO983+000-KO983+143; KO983+216-KO983+321; KO987+000-KO988+000; KO988+000-KO989+000; KO991+000-KO991+900; KO993+400-KO994+600, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱192.9M | 100% | High risk64 | —-0.054 |
| 18 | 18I00014ROAD WIDENING - PRIMARY ROADS - ALONG DAANG MAHARLIKA INCLUDING RROW, KO976+092 - KO977+190, KO977+198 - KO978+000; KO978+000 - KO980+441; KO980+457 - KO981+000, LEYTE 5TH DISTRICT | Region VIII | Region VIII | Completed | ₱172.8M | 100% | High risk64 | —-0.058 |
| 19 | 21I00072CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱140.9M | 100% | High risk64 | —-0.067 |
| 20 | 24I00011CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱142.2M | 95% | High risk64 | —-0.033 |
| 21 | 20I00058NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE, BRGY. AGUTAYON, MAHAPLAG, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk63 | —-0.057 |
| 22 | 22I00038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk63 | —-0.066 |
| 23 | 22K00093CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BULOD RIVER, PACKAGE 2, TUBOD, LANAO DEL NORTE, STA.1+083.00-STA.1+700.00(RIGHT BANK) | Region X | Region X | Completed | ₱139.7M | 100% | High risk63 | —-0.053 |
| 24 | 17P00032REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) BAGUIO - BONTOC ROAD, K0265+750-K0266+000, K0266+000-K0266+475, K0266+680-K0266+840, K | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱112.2M | 100% | High risk63 | —-0.038 |
| 25 | 25I00143CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANGKEROHAN FLOOD CONTROL STRUCTURE, PHASE 1, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱93.4M | 62% | High risk63 | —-0.020 |