Contractor dossier
89 projects on file, including joint ventures this contractor is part of.
Total projects
89
Total budget
₱10B
Average progress
91.1%
Completion rate
73.0%
Average risk score
60.2
High risk on average, out of 100
Flagged as unusual
9
10.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 43 | ₱3B | 54.3 | 2 | 95.6% |
| Region VIII | 39 | ₱5.2B | 65.8 | 4 | 91.8% |
| Central Office | 3 | ₱1.4B | 77.5 | 3 | 41.3% |
| Cordillera Administrative Region | 3 | ₱335.3M | 58.2 | 0 | 100.0% |
| Region IV-A | 1 | ₱89.4M | 56.4 | 0 | 0.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 53 | ₱6.2B | 56.7 | 2 | 96.0% |
| Flood Control and Drainage | 18 | ₱1.5B | 56.8 | 0 | 94.2% |
| OTHER | 8 | ₱1.3B | 81.1 | 5 | 78.6% |
| Bridges | 5 | ₱368.8M | 54.9 | 1 | 66.1% |
| GAA 2025 OO-2 | 3 | ₱285.3M | 92.5 | 0 | 69.2% |
| GAA 2025 OO-1 | 1 | ₱289.3M | 94.8 | 1 | 60.1% |
| Buildings and Facilities | 1 | ₱23.2M | 38.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00162NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 60% | High risk95 | Flagged0.038 |
| 25IG0024CONSTRUCTION OF FLOOD CONTROL PROTECTION, BARANGAY PA-A, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱135.9M | 87% | High risk93 | —-0.001 |
| 25KM0014CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG MANDULOG RIVER (DIGKILAAN BRIDGE SECTION), PACKAGE 1, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.4M | 83% | High risk93 | —-0.014 |
| 25IG0067CONSTRUCTION OF SALOG FLOOD CONTROL STRUCTURE AT (DOWNSTREAM SECTION), HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱53.1M | 38% | High risk92 | —-0.003 |
| 24I00024CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE | Region VIII | Region VIII | On-Going | ₱240.1M | 91% | High risk84 | Flagged0.036 |
| 18I00016CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱286.9M | 100% | High risk84 | Flagged0.024 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 18I00042ROAD WIDENING - PRIMARY ROADS, LIBUNGAO - MATAG-OB - PALOMPON ROAD, KO991+(-079) - KO992+667; KO992+723.40 - KO994+299; KO994+320.46 - KO996+151; KO996+167.25 - KO997+180, LEYTE 4TH DISTRICT | Region VIII | Region VIII | Completed | ₱158M | 100% | High risk83 | —-0.006 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 25I00177CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱72.3M | 20% | High risk82 | Flagged0.020 |
| 24KM0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANDULOG RIVER, BARANGAY MANDULOG, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱96.5M | 100% | High risk79 | —-0.002 |
| 23K00088REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, MARAWI-MALABANG ROAD - (S01652MN) CHAINAGE 16300 - CHAINAGE 18800 | Region X | Region X | Completed | ₱46.8M | 100% | High risk72 | —-0.040 |
| 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 24I00071CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱146.3M | 77% | High risk66 | —-0.011 |
| 25K00193WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱143.3M | 35% | High risk65 | Flagged0.005 |
| 19I00122CLUSTER II: 1. REPAIR/REHAB. OF DAMAGED PAVED ROADS ALONG TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD., K1036+800 - K1036+950, K1037+340 - K1037+500, K1037+620 - K1037+650, K1037+820 - K1038+020, K1038+150 - K1038+280, LEYTE 3RD LD; 2. REPAIR/K | Region VIII | Region VIII | Completed | ₱125.2M | 100% | High risk65 | —-0.022 |
| 18I00003NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA INCLUDING RROW, KO982+200-KO983+000; KO983+000-KO983+143; KO983+216-KO983+321; KO987+000-KO988+000; KO988+000-KO989+000; KO991+000-KO991+900; KO993+400-KO994+600, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱192.9M | 100% | High risk64 | —-0.054 |
| 18I00014ROAD WIDENING - PRIMARY ROADS - ALONG DAANG MAHARLIKA INCLUDING RROW, KO976+092 - KO977+190, KO977+198 - KO978+000; KO978+000 - KO980+441; KO980+457 - KO981+000, LEYTE 5TH DISTRICT | Region VIII | Region VIII | Completed | ₱172.8M | 100% | High risk64 | —-0.058 |
| 21I00072CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MERIDA - LUNDAG - PUTING BATO - CONSOLACION - ISABEL ROAD, K1117+100 - K1117+390, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱140.9M | 100% | High risk64 | —-0.067 |
| 24I00011CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱142.2M | 95% | High risk64 | —-0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00162NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG-HILONGOS ROAD, PACKAGE A, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 60% | High risk95 | Flagged0.038 |
| 24I00024CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE | Region VIII | Region VIII | On-Going | ₱240.1M | 91% | High risk84 | Flagged0.036 |
| 18I00016CONSTRUCTION OF MISSING LINKS / NEW ROADS: MAHAPLAG - HILONGOS ROAD, INCLUDING ROW, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱286.9M | 100% | High risk84 | Flagged0.024 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 25I00177CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ACCESS ROAD LEADING TO HILONGOS PORT, HILONGOS, LEYTE | Region VIII | Region VIII | On-Going | ₱72.3M | 20% | High risk82 | Flagged0.020 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 25K00193WIDENING OF PERMANENT BRIDGES LIANGAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱143.3M | 35% | High risk65 | Flagged0.005 |
| 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 18KG0064REHABILITATION OF POONA KAPATAGAN-LINDONGAN FMR, TANGKAL, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk45 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22I00036NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | Completed | ₱101.1M | 100% | Medium risk58 | —-0.069 |
| 52 | 22I00023NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS, MAHAPLAG - HILONGOS ROAD, PACKAGE 3, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱106.1M | 100% | Medium risk58 | —-0.068 |
| 53 | 18K00112CONST. OF MISSING LINKS/NEW ROADS,LDNICR(SALVADOR-SAPAD-NUNUNGAN SEC.)PACKAGE 4,LANAO DEL NORTE | Region X | Region X | Completed | ₱118M | 100% | Medium risk58 | —-0.063 |
| 54 | 22I00022NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - MAHAPLAG - HILONGOS ROAD, PACKAGE 1, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱106.1M | 100% | Medium risk58 | —-0.065 |
| 55 | 24K00138ROAD WIDENING-PRIMARY ROADS, COTABATO-MALABANG-LANAO DEL NORTE RD-(S01650MN) CHAINAGE 45264-CHAINAGE 49511 | Region X | Region X | Completed | ₱112.3M | 100% | Medium risk58 | —-0.076 |
| 56 | 20I00017ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - TABANGO - CATMON - LA FORTUNA - MANLAWAAN - GIMARCO RD. - K1035+854 - K1035+947, K1034+000 - K1034+030, K1034+057 - K1034+185, LEYTE 3 | Region VIII | Region VIII | Completed | ₱91.6M | 100% | Medium risk58 | —-0.085 |
| 57 | 18K00292CONST. ALONG TUBOD - GANASSI ROAD, K1611 + 000 - K1616 + 1000, LANAO DEL SUR 2ND | Region X | Region X | Completed | ₱93.6M | 100% | Medium risk57 | —-0.080 |
| 58 | 23K00349CONSTRUCTION OF FLOOD CONTROL ALONG SALIPONGAN RIVER, BRGY. SALIPONGAN, MUNICIPALITY OF BALINDONG, 2ND DISTRICT, LANAO DEL SUR | Region X | Region X | Completed | ₱56.2M | 100% | Medium risk57 | —-0.014 |
| 59 | 24D00083BACOOR-DASMARIÑAS NATIONAL RD - K0023+830 - K0024+080, K0024+093 - K0024+450 | Region IV-A | Region IV-A | On-Going | ₱89.4M | 0% | Medium risk56 | —-0.039 |
| 60 | 18P00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD., K0695+000 - K0696+617, K0696+817 - K0698+261 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱118.6M | 100% | Medium risk56 | —-0.067 |
| 61 | 18P00041ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) CLAVERIA-CALANASAN-KABUGAO RD, K0707+288 - K0708+917, K0708+942 - K0708+1810 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱104.5M | 100% | Medium risk56 | —-0.067 |
| 62 | 17K00458CONST. OF FLOOD CONTROL IN BRGY. POBLACION-BRGY. TAGANONOK-BRGY.PANGADAPUN-BRGY. CAMPONGARAYA, LANAO | Region X | Region X | Completed | ₱46.2M | 100% | Medium risk55 | —-0.056 |
| 63 | 25K00111WIDENING OF PERMANENT BRIDGES MAGANDING PARALLEL BR. 1 ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱57.3M | 44% | Medium risk54 | —-0.014 |
| 64 | 25K00153WIDENING OF PERMANENT BRIDGES KABATURAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱57.3M | 51% | Medium risk54 | —-0.016 |
| 65 | 19K00258CONSTRUCTION/REPLACEMENT OF DAGO-OK BRIDGE, LUMBATAN, (ALONG LAKE LANAO CIRCUMFERENTIAL ROAD), LANAO DEL SUR | Region X | Region X | Completed | ₱82.5M | 100% | Medium risk54 | —-0.045 |
| 66 | 18K00060CONST. OF REVETMENT/RIVER CONTROL ON STEEL SHEET PILE ALONG SALVADOR-SAPAD-NUNUNGAN RD,POBLACION,SAP | Region X | Region X | Completed | ₱56.1M | 100% | Medium risk51 | —-0.079 |
| 67 | 18KF0079CONSTRUCTION OF SLOPE PROTECTION ALONG SAGADAN BRIDGE (UPSTREAM) (L/S), TUBOD, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱88.5M | 100% | Medium risk51 | —-0.070 |
| 68 | 23KG0039REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROAD ALONG LINAMON-ZAMBOANGA ROAD, K1545+820-K1546+000, K1546+401-K1546+514, K1572+000-K1572+235, K1572+304-K1572+862, K1575+643-K1575+773, K1577+000-K1577+1097, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱76.7M | 100% | Medium risk51 | —-0.083 |
| 69 | 24K00003CONST. OF FLOOD MITIGATION STRUCTURE AT RAMITAN RIVER, PICONG, LANAO DEL SUR | Region X | Region X | On-Going | ₱57.9M | 100% | Medium risk51 | —-0.041 |
| 70 | 20KG0054ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, LINAMON-ZAMBOANGA ROAD-S00968MN, K1617+453-K1617+711, K1621+760-K1622+291, KAPATAGAN, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱80.4M | 100% | Medium risk51 | —-0.081 |
| 71 | 21KG0028FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION AT PINUYAK BRIDGE ALONG MARANDING RIVER STREAM,BRGY. PINUYAK,LALA,LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱79.6M | 100% | Medium risk51 | —-0.074 |
| 72 | 19KH0040CONSTRUCTION OF NEW DRAINAGE LINE, ALONG SERIÑA ST. FROM VILLARIN TO CDO RIVER (OUTFALL)CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱69.8M | 100% | Medium risk50 | —-0.064 |
| 73 | 20KG0023ASSET PRESERVATION-REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS,SLOPE COLLPASE AND LANDSLIDE-PRIMARY ROADS, MALABANG-DOBLESTON-TUKURAN ROAD-S00931MN,K1972+500-K1972+760;K1972+910-K1973+115;K1985+275-K1985+345,SND,LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱50.6M | 100% | Medium risk50 | —-0.091 |
| 74 | 22K00032PREVENTIVE MAINTENANCE - PRIMARY ROADS, COTABATO-MALABANG-LANAO DEL NORTE RD - (S01650MN) CHAINAGE 54970 - CHAINAGE 56470 | Region X | Region X | Completed | ₱46.8M | 100% | Medium risk49 | —-0.092 |
| 75 | 24KM0056CONSTRUCTION OF BYPASS AND DIVERSION ROADS AT ILIGAN CITY-CAGAYAN DE ORO CITY ALTERNATE ROUTE (DIGKILAAN - BULUA SECTION) PACKAGE II, ILIGAN CITY, LANAO DEL NORTE | Region X | Iligan City DEO | On-Going | ₱49M | 99% | Medium risk49 | —-0.053 |