8 projects on file, including joint ventures this contractor is part of.
Total projects
8
Total budget
₱262.2M
Average progress
67.6%
Completion rate
50.0%
Below 70%
Average risk score
58.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 8 | ₱262.2M | 58.3 | 0 | 67.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4 | ₱87.1M | 56.3 | 0 | 77.7% |
| Flood Control and Drainage | 3 | ₱155.7M | 59.7 | 0 | 70.8% |
| Buildings and Facilities | 1 | ₱19.4M | 62.2 | 0 | 17.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22FB0173CONSTRUCTION OF PAGCOLBON-MALOBAGO INTERIOR ROAD, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱53.1M | 64% | High risk63 | —-0.035 |
| 25FK0051CLUSTER XIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI PURPOSE BUILDINGS/FACILITEIS TO SUPPORT SOCIAL SERVICES-1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. OSIAO, BACON, SORSOGON 2.) CONST. | Region V | Sorsogon DEO | On-Going | ₱19.4M | 17% | High risk62 | —-0.007 |
| 22FB0138FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILTIES - CONSTRUCTION OF MALOBAGO FLOOD CONTROL SYSTEM INCLUDING ESPLANADE ALONG MALOBAGO-BUSAY RIVER (MAIN), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22FB0173CONSTRUCTION OF PAGCOLBON-MALOBAGO INTERIOR ROAD, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱53.1M | 64% | High risk63 | —-0.035 |
| 2 | 25FK0051CLUSTER XIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI PURPOSE BUILDINGS/FACILITEIS TO SUPPORT SOCIAL SERVICES-1.) CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. OSIAO, BACON, SORSOGON 2.) CONST. | Region V | Sorsogon DEO | On-Going | ₱19.4M | 17% | High risk62 | —-0.007 |
| 3 | 22FB0138FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILTIES - CONSTRUCTION OF MALOBAGO FLOOD CONTROL SYSTEM INCLUDING ESPLANADE ALONG MALOBAGO-BUSAY RIVER (MAIN), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
| 4 | 25F00288CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE STRUCTURES, RIVER TRIBUTARIES, PACKA | Region V | Region V | On-Going | ₱48.3M | 13% | Medium risk59 | —-0.029 |
| 5 | 21FB0119LIP-FLOOD CONTROL AND DRAINAGE: CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY TAMAOYAN, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱49.5M | 100% | Medium risk58 | —-0.088 |
| 6 | 25FK0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. PAMURAYAN, SORSOGON CITY, SORSOGON | Region V | Sorsogon DEO | On-Going | ₱9.8M | 47% | Medium risk57 | —-0.055 |
| 7 | 20FB0174CONCRETING OF ILULUAN TO BRGY. CAGUIBA FMR, BRGY. ILULUAN AND BRGY. CAGUIBA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱9.6M | 100% | Medium risk57 | —-0.049 |
| 8 | 21FH0072ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-CATANDUANES CIRCUMFERENTIAL ROAD K0122+500 - K0122+565 | Region V | Catanduanes DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.098 |