Contractor dossier
38 projects on file, including joint ventures this contractor is part of.
Total projects
38
Total budget
₱399.3M
Average progress
99.8%
Completion rate
97.4%
Average risk score
25.9
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 38 | ₱399.3M | 25.9 | 0 | 99.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 22 | ₱109.3M | 17.9 | 0 | 99.6% |
| Flood Control and Drainage | 7 | ₱193.1M | 42.5 | 0 | 100.0% |
| Roads | 6 | ₱92.9M | 37.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱3.9M | 22.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18EF0029CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF TIGAPLAN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱71.5M | 100% | Medium risk49 | —-0.041 |
| 2 | 20EF0026CONSTRUCTION OF MALAMBUNGA RIVER FLOOD CONTROL STRUCTURES, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱40.7M | 100% | Medium risk42 | —-0.044 |
| 3 | 24EF0059CONSTRUCTION OF SALONGSONG RIVER FLOOD CONTROL STRUCTURE, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱29.4M | 100% | Medium risk41 | —-0.050 |
| 4 | 23EF0013CONSTRUCTION OF RANSANG RIVER FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+300 R/S UPSTREAM | Region IV-B | Palawan 2nd DEO | Completed | ₱24.5M | 100% | Medium risk41 | —-0.048 |
| 5 | 19EF0134CONSTRUCTION OF SALUNGSONG FLOOD CONTROL, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.046 |
| 6 | 19EF0131CONSTRUCTION OF BUNOG FLOOD CONTROL, BARANGAY BUNOG, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.046 |
| 7 | 20EF0025PAVING OF UNPAVED ROAD QUEZON-PUNTA BAJA ROAD-K0200+791-K0201+377, K0202+505-K0203+063, BRGY PUNTA BAJA, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱30.8M | 100% | Medium risk41 | —-0.066 |
| 8 | 22EF0025CONST. OF TAGUSAO RIVER FLOOD CONTROL STRUCTURE, STA. 0+070-STA. 0+620 RIGHT RIVERBANK, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱17.3M | 100% | Medium risk41 | —-0.048 |
| 9 | 24EF0017REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS PALAWAN CIRCUM RD. K0226+190-K0226+250, K0240+310-K0240+400,K0241+996-K0242+020, K0242+070-K0242+110, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱28.3M | 100% | Medium risk41 | —-0.063 |
| 10 | 22EF0082REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE PALAWAN CIRCUM. RD (PANALINGAAN-TAGBITA-LATUD K0249+425-K0249+520, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱14.4M | 100% | Medium risk40 | —-0.059 |
| 11 | 21EF0059CONST. OF LOCAL ROAD, BRGY PUNTA BAJA, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk40 | —-0.063 |
| 12 | 21EF0058CONCRETING OF ROAD LEADING TO MAGTAYOG FALLS, BRGY. BUNOG, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱11.6M | 100% | Medium risk39 | —-0.064 |
| 13 | 20EF0102CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING BRGY. POBLACION, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱9.6M | 100% | Medium risk35 | —-0.062 |
| 14 | 18EF0141CONST. OF 2STY 6CL, ALFREDO GREGORIO MEMORIAL ELEM. SCHOOL, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱12M | 100% | Medium risk31 | —-0.015 |
| 15 | 18EF0190CONST. OF 2-UNITS 3STY3CL RW, QUEZON NATIONAL HIGH SCHOOL, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱27.1M | 100% | Low risk30 | —-0.016 |
| 16 | 23EF0106CONSTRUCTION OF 1STY2CL, RACHO II ELEMENTARY SCHOOL (BATCH 1), RIZAL (MARCOS), PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱5M | 100% | Low risk30 | —-0.018 |
| 17 | 18EF0196CONST. OF 3STY3CL RW, JOSE P. RIZAL NATIONAL HIGH SCHOOL, RIZAL(MARCOS), PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱13.5M | 100% | Low risk28 | —-0.021 |
| 18 | 18EF0158CONST. OF 2STY 2CL RW, PANACAN NATIONAL HIGH SCHOOL, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱8.9M | 100% | Low risk28 | —-0.022 |
| 19 | 17EF0080CLUSTER I-CONST./REHAB. OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS 1. TARITIEN ES, BRGY TARITIEN, 2. DPWH GUEST HOUSE, BRGY. ANTIPULUAN, 3. TABON ES, BRGY TABON, ARAMAYWAN ES, BRGY ARAMAYWAN, 5. ARAMAYWAN NHS, BRGY ARAMAYWAN, 6. BUNOG ES, | Region IV-B | Palawan 2nd DEO | Completed | ₱1.7M | 100% | Low risk26 | —-0.006 |
| 20 | 18EF0094REHAB. OF ROAD, CONCRETING OF ALFREDO ABUEG SR. ST., BRGY ALFONSO XIII, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.062 |
| 21 | 17EF0081CLUSTER II-CONST./REHAB. OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS 1. DPWH REST HOUSE, BRGY PUNTA BAJA 2. CAMPONG ULAY ES, CAMPONG ULAY 3. RANSANG NHS, BRGY. SUMURONG ES, BRGY. RANSANG, 5. CANDAWAGA PUBLIC MARKET, BRGY CANDAWAGA, . . . | Region IV-B | Palawan 2nd DEO | Completed | ₱1.5M | 100% | Low risk24 | —-0.002 |
| 22 | 18EF0042CONST. OF MULTI-PURPOSE DISASTER BUILDING, RIZAL MUNICIPAL COMPOUND, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱4.6M | 100% | Low risk18 | —-0.061 |
| 23 | 22EF0001CONST. OF MULTI-PURPOSE BUILDING BARANGAY CANIPAAN, RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱3.9M | 100% | Low risk18 | —-0.057 |
| 24 | 25EF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ARAMAYWAN, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱4.4M | 92% | Low risk17 | —-0.029 |
| 25 | 18EF0044CONST. OF COVERED COURT, GOV. ALFREDO ABUEG SR. MEMORIAL VOCATIONAL HIGH SCHOOL, BRGY. BARONG-BARONG, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱3.4M | 100% | Low risk17 | —-0.060 |