Opening the dossier…
Opening the dossier…
Contractor dossier
26 projects on file, including joint ventures this contractor is part of.
Total projects
26
Total budget
₱608.4M
Average progress
99.7%
Completion rate
80.8%
Average risk score
47.7
Medium risk on average, out of 100
Flagged as unusual
1
3.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 20 | ₱513.3M | 48.8 | 1 | 99.6% |
| Region VII | 6 | ₱95.1M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 10 | ₱114M | 46.4 | 0 | 100.0% |
| OTHER | 5 | ₱185M | 68.2 | 0 | 100.0% |
| Bridges | 3 | ₱244.4M | 57.7 | 1 | 97.1% |
| Flood Control and Drainage | 3 | ₱47.6M | 46.9 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱11.6M | 27.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱5.8M | 19.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18IA0086CONSTRUCTION OF ALMERIA BYPASS ROAD, INCLUDING ROW, BRIDGE AND SLOPE PROTECTION, POBLACION ALMERIA, BILIRAN (FROM 11.62732',124.37993 TO 11.62752',124.37986) | Region VIII | Biliran DEO | Completed | ₱83.1M | 100% | High risk81 | —-0.014 |
| 18IA0060WIDENING OF PERMANENT BRIDGE - LOOC BRIDGE (B00035BR) ALONG BILIRAN CIRCUMFERENTIAL ROAD (FROM 11.62732, 124.37993 - 11.62752, 124.37986) K1035+129, LOOC, ALMERIA, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱21.9M | 100% | High risk78 | —-0.018 |
| 19I00118BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CARAY-CARAY-BR. (B00032BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CARAY-CARAY, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱163.4M | 91% | High risk67 | Flagged0.027 |
| 20HB0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN - JAGNA) KO173 + 200 -KO174 + 030, KO181 + 972 - KO182 + 615, KO182 + 681 - | Region VII | Bohol 3rd DEO | Completed | ₱34.3M | 100% | High risk62 | —-0.029 |
| 20HB0034ASSET PRESERVATION - REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS KO159+288 - KO159+351, KO173+957 - KO174+029, KO198+251 - KO198+355, KO205+370 - KO206+000, ALICIA-GUINDULMAN-JAGNA-GARCIA HERNANDEZ, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱36.2M | 100% | High risk61 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00118BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CARAY-CARAY-BR. (B00032BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CARAY-CARAY, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱163.4M | 91% | High risk67 | Flagged0.027 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18IA0086CONSTRUCTION OF ALMERIA BYPASS ROAD, INCLUDING ROW, BRIDGE AND SLOPE PROTECTION, POBLACION ALMERIA, BILIRAN (FROM 11.62732',124.37993 TO 11.62752',124.37986) | Region VIII | Biliran DEO | Completed | ₱83.1M | 100% | High risk81 | —-0.014 |
| 2 | 18IA0060WIDENING OF PERMANENT BRIDGE - LOOC BRIDGE (B00035BR) ALONG BILIRAN CIRCUMFERENTIAL ROAD (FROM 11.62732, 124.37993 - 11.62752, 124.37986) K1035+129, LOOC, ALMERIA, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱21.9M | 100% | High risk78 | —-0.018 |
| 3 | 19I00118BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CARAY-CARAY-BR. (B00032BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CARAY-CARAY, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱163.4M | 91% | High risk67 | Flagged0.027 |
| 4 | 20HB0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN - JAGNA) KO173 + 200 -KO174 + 030, KO181 + 972 - KO182 + 615, KO182 + 681 - | Region VII | Bohol 3rd DEO | Completed | ₱34.3M | 100% | High risk62 | —-0.029 |
| 5 | 20HB0034ASSET PRESERVATION - REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS KO159+288 - KO159+351, KO173+957 - KO174+029, KO198+251 - KO198+355, KO205+370 - KO206+000, ALICIA-GUINDULMAN-JAGNA-GARCIA HERNANDEZ, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱36.2M | 100% | High risk61 | —-0.029 |
| 6 | 19HB0159LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF LOCAL ROADS -POBLACION-LUMBAY-PAMACSALAN-ILAUD- BAGACAY ROAD, PILAR BOHOL STA. 0+000 - STA. 0+122.82 - SECTION 1 STA. 0+372.96 - STA. 0+505.26; STA. 0+528.91 - STA. 0+706 -S | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | Medium risk60 | —-0.032 |
| 7 | 19I00117BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | Terminated | ₱64.6M | 100% | Medium risk57 | —-0.017 |
| 8 | 19IA0068CONSTRUCTION OF NEW PERMANENT BRIDGE MACALPE BRIDGE ALONG NAVAL CAIBIRAN CROSS COUNTRY ROAD CAIBIRAN, BILIRAN PROVINCE (124.51507, 11.58347 - 124.51518, 11.58332) | Region VIII | Biliran DEO | Terminated | ₱16.4M | 100% | Medium risk49 | —-0.018 |
| 9 | 20IA0023ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED- TERTIARY ROADS - MARIPIPI CIRCUMFERENTIAL ROAD K0004+585 - K0006+600 | Region VIII | Biliran DEO | Terminated | ₱14.4M | 100% | Medium risk49 | —-0.059 |
| 10 | 19IA0009IMPROVEMENT OF ACCESS ROAD LEADING TO ULAN-ULAN FALLS (11.61369°, 124.4228° TO 11.61806°, 124.42964°), BRGY. SAMPAO, ALMERIA, BILIRAN | Region VIII | Biliran DEO | Completed | ₱28M | 100% | Medium risk49 | —-0.085 |
| 11 | 19IA0005CONSTRUCTION OF ALMERIA BY-PASS ROAD, BILIRAN, POBLACION ALMERIA, BILIRAN (FROM 11.62732°, 124.37993 TO 11.62572°, 124.37986) | Region VIII | Biliran DEO | Completed | ₱12.7M | 100% | Medium risk49 | —-0.087 |
| 12 | 19IA0007REHABILITATION OF DAMAGED PAVED ROADS - TERTIARY ROADS, MARIPIPI CIRCUMFERENTIAL ROAD. K0014+000 - K0015+500 (FROM 11.81517314°, 124.3176803° TO 11.81536483°, 124.329689°) | Region VIII | Biliran DEO | Terminated | ₱13.7M | 100% | Medium risk49 | —-0.047 |
| 13 | 19IA0048CONSTRUCTION OF BANLAS FLOOD CONTROL STRUCTURES ALONG MARIPIPI CIRCUMFERENTIAL ROAD, MARIPIPI, BILIRAN | Region VIII | Biliran DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.074 |
| 14 | 19IA0057CONSTRUCTION OF MOOG FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD, (124.44944, 11.8806 TO 124.449212, 11.489301) | Region VIII | Biliran DEO | Completed | ₱28.5M | 100% | Medium risk47 | —-0.082 |
| 15 | 21IG0005NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - ORMOC-BAYBAY SOUTHERN LEYTE BDRY. ROAD - K1066+000-K1066+367 | Region VIII | Leyte 5th DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.094 |
| 16 | 18IA0111CONSTRUCTION OF BUSALI FLOOD CONTROL PROTECTING BUSALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, BILIRAN, BILIRAN. (124.44958°, 11.49262° - 124.45033°, 11.49303°) | Region VIII | Biliran DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.081 |
| 17 | 18IA0089CONCRETING OF SITIO JUMETILCO, BRGY. IMELDA - SITIO BALIC-BALIC, BRGY. LICO FMR BRGY. IMELDA AND BRGY. LICO, NAVAL, BILIRAN (FROM 11.60374°, 124.45146° TO 11.60551°, 124.44731°) SECTION 1 | Region VIII | Biliran DEO | Completed | ₱6.7M | 100% | Medium risk46 | —-0.044 |
| 18 | 19IG0024CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), BRGY. POBLACION 2, HINDANG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.097 |
| 19 | 19IA0072CONCRETING OF SITIO LIBTONG GAMAY, BRGY. LIBTONG FMR (PHASE II)11.54221°, 124.4747° - 11.54428°, 124.47426° (SECTION 1) 11.54186°, 124.47496° - 11.54265°, 124.47738° (SECTION 2) | Region VIII | Biliran DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.045 |
| 20 | 19IA0075CONCRETING OF BRGY. INASUYAN FMR, KAWAYAN, BILIRAN(11.6926°, 124.4846° - 11.6891°, 124.4824°) | Region VIII | Biliran DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.046 |
| 21 | 20HB0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) GUINDULMAN-ANDA-BADIANG-COGTONG ROAD LEADING TO ANDA BEACHES, CANDIJAY, BOHOL, STA. 237+042.00 - STA. 237+504 | Region VII | Bohol 3rd DEO | Completed | ₱9.3M | 100% | Medium risk43 | —-0.094 |
| 22 | 19IG0096CONCRETING OF BRGY. GACAT - BRGY. HIBUNAWAN FMR, BRGY. GACAT AND BRGY. HIBUNAWAN, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.044 |
| 23 | 19HB0172LOCAL INFRASTRUCTURE PROGRAM WATER MANAGEMENT FACILITIES WATER SUPPLY CONSTRUCTION OF LEVEL III MUNICIPAL WATER SUPPLY SYSTEM, BATUAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱3.9M | 100% | Low risk20 | —-0.060 |
| 24 | 18IA0103CONSTRUCTION OF 1 STOREY 2 CLASSROOM CALIPAYAN ELEMENTARY SCHOOL BUILDING | Region VIII | Biliran DEO | Completed | ₱2.9M | 100% | Low risk19 | —-0.041 |
| 25 | 18IA0096CONSTRUCTION OF 1 STOREY 3 CLASSROOM OF CULABA CENTRAL SCHOOL | Region VIII | Biliran DEO | Completed | ₱3.9M | 100% | Low risk19 | —-0.042 |