Contractor dossier
152 projects on file, including joint ventures this contractor is part of.
Total projects
152
Total budget
₱1.9B
Average progress
87.3%
Completion rate
75.0%
Average risk score
45.1
Medium risk on average, out of 100
Flagged as unusual
7
4.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 120 | ₱1.2B | 44.1 | 6 | 87.3% |
| National Capital Region | 28 | ₱536.2M | 50.5 | 1 | 85.6% |
| Region III | 2 | ₱29.1M | 32.1 | 0 | 100.0% |
| Region IV-B | 1 | ₱96.5M | 52.8 | 0 | 100.0% |
| Region I | 1 | ₱8.1M | 39.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 74 | ₱1B | 46.7 | 1 | 86.9% |
| Roads | 52 | ₱573M | 41.9 | 0 | 93.3% |
| Flood Control and Drainage | 11 | ₱105.2M | 31.8 | 0 | 83.1% |
| Water Provision and Storage | 5 | ₱17.6M | 29.6 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱34.9M | 90.7 | 2 | 67.7% |
| OTHER | 3 | ₱65.4M | 70.1 | 2 | 66.7% |
| Bridges | 3 | ₱31.5M | 51.9 | 2 | 33.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0093CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUBUKAL, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱5.9M | 15% | High risk94 | Flagged0.022 |
| 25OH0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 826 ZONE 89. PACO, DISTRICT 5, MANILA | National Capital Region | South Manila DEO | Completed | ₱14.6M | 100% | High risk90 | —-0.030 |
| 25OH0143CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 773 ZONE 84, STA. ANA, DISTRICT 5, MANILA | National Capital Region | South Manila DEO | On-Going | ₱4.8M | 56% | High risk90 | Flagged0.012 |
| 25OH0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS-FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF MULTI-PURPOSE BUILDING PHASE 2 AT BRGY. 775, ZONE 84, SAGARADA FAMILIA COR., ONYX SIS. SAN ANDRES, MANILA | National Capital Region | South Manila DEO | Completed | ₱9.5M | 100% | High risk89 | —-0.032 |
| 23DP0088OPENING AND CONCRETING OF BRGY. PEREZ FMR, BRGY. PEREZ, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱11.6M | 100% | High risk85 | Flagged0.002 |
| 25DP0094CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (SAN PABLO CITY HALL), BARANGAY V-A, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱4.8M | 0% | High risk75 | —-0.010 |
| 25DB0196CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-COMPLETION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES AT BARANGAY CALOOCAN, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱38.4M | 22% | High risk72 | —-0.016 |
| 25DP0059CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BONGKOL, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱5.8M | 0% | High risk72 | —-0.011 |
| 25DP0077CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY OPLES, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱5.8M | 56% | High risk72 | —-0.030 |
| 25DP0090CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 3-D, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱5.8M | 57% | High risk72 | —-0.029 |
| 25D00051CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO TAYAK HILLS, TANAW DE RIZAL, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱14.2M | 0% | High risk71 | Flagged0.012 |
| 25DP0046CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, IBABANG TAYKIN TO ILAYANG TAYKIN, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱9.6M | 0% | High risk66 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0093CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUBUKAL, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱5.9M | 15% | High risk94 | Flagged0.022 |
| 25OH0143CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 773 ZONE 84, STA. ANA, DISTRICT 5, MANILA | National Capital Region | South Manila DEO | On-Going | ₱4.8M | 56% | High risk90 | Flagged0.012 |
| 25D00051CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO TAYAK HILLS, TANAW DE RIZAL, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱14.2M | 0% | High risk71 | Flagged0.012 |
| 25DP0044BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - GATING-GATING BR. (B02879LZ) ALONG CALAMBA-STA CRUZ-FAMY JCT RD | Region IV-A | Laguna 3rd DEO | On-Going | ₱10.3M | 0% | Medium risk54 | Flagged0.011 |
| 25DP0045BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - DAYAP BR. (B02884LZ) ALONG MASPANG H-WAY | Region IV-A | Laguna 3rd DEO | On-Going | ₱9.3M | 0% | Medium risk54 | Flagged0.011 |
| 24D00250DESIGN AND BUILD COMPLETION OF ONE-STOP STUDENT SERVICES CENTER, URS CAMPUS - UNIVERSITY OF RIZAL SYSTEM | Region IV-A | Region IV-A | On-Going | ₱14.6M | 49% | Medium risk45 | Flagged0.003 |
| 23DP0088OPENING AND CONCRETING OF BRGY. PEREZ FMR, BRGY. PEREZ, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱11.6M | 100% | High risk85 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20DP0035LOCAL PROGRAM - CONSTRUCTION OF LINE CANAL IN PUROK 1 TO PUROK 5, BRGY. CALUMPANG, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱4M | 100% | Low risk26 | —-0.084 |
| 127 | 20DI0166CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BAY, LOS BAÑOS, CALAMBA CITY, CABUYAO CITY, STA. ROSA CITY, BIÑAN CITY | Region IV-A | Laguna 2nd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.071 |
| 128 | 25DB0180CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY DAO, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱1.9M | 4% | Low risk25 | —-0.032 |
| 129 | 20DP0070CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - REGION IV-A | Region IV-A | Laguna 3rd DEO | Completed | ₱4.1M | 100% | Low risk25 | —-0.069 |
| 130 | 19DP0078CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - REGION IV-A | Region IV-A | Laguna 3rd DEO | Completed | ₱3.6M | 100% | Low risk25 | —-0.069 |
| 131 | 22DP0081CSSP - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES | Region IV-A | Laguna 3rd DEO | Completed | ₱3.4M | 100% | Low risk25 | —-0.071 |
| 132 | 21DP0053LOCAL PROGRAM - CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY DEL REMEDIO, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.105 |
| 133 | 23DP0028NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - SN PABLO-CALAUAN RD - K0079 + 000 - K0079 + 075 | Region IV-A | Laguna 3rd DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.106 |
| 134 | 20DP0015LOCAL PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN BENITO, VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱3M | 100% | Low risk25 | —-0.100 |
| 135 | 21DP0044ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0076 + 000 - K0076 + 124.25 | Region IV-A | Laguna 3rd DEO | Completed | ₱3.6M | 100% | Low risk25 | —-0.103 |
| 136 | 18OB0277CONSTRUCTION OF MULTI-PURPOSE BUILDING AT DOÑA BETANG, BRGY. SANTOLAN, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱3.3M | 100% | Low risk25 | —-0.103 |
| 137 | 21DP0050LOCAL PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY STO. NIÑO, SAN PABLO CITY | Region IV-A | Laguna 3rd DEO | Completed | ₱3M | 100% | Low risk25 | —-0.105 |
| 138 | 24DP0013NETWORK DEVELOPMENT- ROAD WIDENING - TERTIARY ROADS - CALAUAN-NAGCARLAN BDRY RD - K0082 + 443 - K0082 + 500 | Region IV-A | Laguna 3rd DEO | Completed | ₱2.7M | 100% | Low risk24 | —-0.105 |
| 139 | 21DP0038LOCAL PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY KALIHAN, SAN PABLO CITY | Region IV-A | Laguna 3rd DEO | Completed | ₱2.5M | 100% | Low risk24 | —-0.103 |
| 140 | 21DP0061LOCAL PROGRAM - REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY V-A, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱2M | 100% | Low risk24 | —-0.104 |
| 141 | 18DP0053LOCAL INFRASTRUCTURE PROGRAM REHABILITATION/REPAIR OF MULTIPURPOSE BUILDING IN LILIW CENTRAL ELEMENTARY SCHOOL, BRGY. RIZAL, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.105 |
| 142 | 19DP0022LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, BRGY. BUKAL, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱2.4M | 100% | Low risk23 | —-0.105 |
| 143 | 19DO0068LOCAL PROGRAM-LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF LIBIS STREET, BRGY. SAN RAAFEL, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱1.9M | 100% | Low risk21 | —-0.102 |
| 144 | 23OH0003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-MARIA OROSA (S02794LZ) CHAINAGE 337-CHAINAGE 415 | National Capital Region | South Manila DEO | Completed | ₱1.6M | 100% | Low risk21 | —-0.095 |
| 145 | 19DP0049LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS -REHABILITATION OF LINE CANAL, BRGY. MASAPANG, VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱967.6K | 100% | Low risk19 | —-0.085 |
| 146 | 21DP0022LOCAL PROGRAM - REHABILITATION OF DRAINAGE STRUCTURE, BRGY. PAULI 1, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱1M | 100% | Low risk18 | —-0.084 |
| 147 | 19DP0043LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION OF LINE CANAL, BRGY. III-C, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱970.2K | 100% | Low risk18 | —-0.088 |
| 148 | 24DP0122CSSP - SPECIAL ROAD FUND - MVUC AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG SN PABLO - CALAUAN RD - K0075+000 - K0075+500, BRGY. BALAYHA, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱817.4K | 100% | Low risk18 | —-0.102 |
| 149 | 24DP0121CSSP-SPECIAL ROAD FUND-MVUC AS PER R.A.11239-INSTALLATION OF ROAD SAFETY DEVICES ALONG MSR PASSING POB RD - K0080+600 BRGY. SAN ROQUE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱655.9K | 100% | Low risk18 | —-0.102 |
| 150 | 19DO0065LOCAL PROGRAM- FLOOD CONTROL AND DRAINAGE- FLOOD CONTROL STRUCTURES/FACICLITIES- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF DRAINAGE SYSTEM, BRGY. DULONG BAYAN II, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱1.4M | 100% | Low risk18 | —-0.084 |