Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱27.7B
Average progress
93.2%
Completion rate
82.0%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
15
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 231 | ₱17.6B | 50.7 | 12 | 93.8% |
| National Capital Region | 92 | ₱6.4B | 54.2 | 2 | 92.3% |
| Region IV-A | 16 | ₱1.6B | 59.2 | 0 | 86.3% |
| Central Office | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 164 | ₱12.9B | 51.5 | 4 | 96.8% |
| Roads | 130 | ₱10.1B | 53.1 | 6 | 88.6% |
| Bridges | 32 | ₱2.2B | 44.9 | 1 | 93.0% |
| OTHER | 13 | ₱894.2M | 66.7 | 1 | 100.0% |
| GAA 2025 SSP | 4 | ₱422.8M | 94.1 | 3 | 63.3% |
| Bridges, Roads | 3 | ₱972M | 57.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱192.5M | 70.2 | 0 | 89.3% |
| Buildings and Facilities | 2 | ₱77.6M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 25OB0165CONSTRUCTION (COMPLETION) OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BARANGAY NAPINDAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.6M | 100% | High risk92 | —-0.002 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 24C00510BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURES,ANYATAM-MAPANIQUE CREEK, SAN ILDEFONSO, BULACAN (PHASE 10) | Region III | Region III | On-Going | ₱97.5M | 99% | High risk80 | —-0.021 |
| 17CD0099REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL WALL ALONG PALASAN RIVER, SAN PASCUAL - HULO - LAWA - PACO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.4M | 100% | High risk80 | —-0.049 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 25CP0078CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD, PHASE IV, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0063CONVERGE, AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, SITIO BALIKIRAN, BARANGAY CA | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 41% | High risk77 | —-0.010 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 24C00461ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.035 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 24CD0270ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA NORTH ROAD K0021+587 K0021+877, K0022+000 K0022+060, K0022+125 K0022+492, K0023+801 K0023+931 | Region III | Bulacan 2nd DEO | Completed | ₱93.6M | 100% | High risk76 | —-0.057 |
| 25CC0461SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLEGU JURISDICTIONS) PULILAN-BALIUAG BYPASS ROAD - BARANGAY BALATONG B AND BARANGAY CALANTIPAY, CHAINAGE 6006-CHAINAGE 6700, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 49% | High risk76 | —-0.019 |
| 24C00093ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS-EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.031 |
| 25CD0047CONSTRUCTION OF STO. CRISTO DIVERSION ROAD, PHASE IV, BARANGAY SANTO CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 38% | High risk76 | —-0.020 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 24CD0300CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+015 STA. 12+315, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 24CD0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+315 STA. 12+615, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0299CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 11+715 STA.12+015, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 62% | High risk70 | Flagged0.028 |
| 23C00379ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱69.5M | 100% | High risk71 | Flagged0.021 |
| 25CD0199REPLACEMENT OF BRIDGE, BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱23.4M | 0% | Medium risk59 | Flagged0.012 |
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 23C00360ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk69 | Flagged0.002 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 18CD0033CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER TABING ILOG - POBLACION I, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱91.1M | 100% | Medium risk43 | —-0.081 |
| 252 | 22CD0217ASSEST PRESERVATION PREVENTIVE MAINTENANCE MANILA NORTH ROAD K0018+800 K0019+700, K0023+000 K0023+618.50 | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | Medium risk43 | —-0.100 |
| 253 | 21CD0100ASPHALT OVERLAY ALONG MANILA NORTH ROAD (MARILAO SECTION) K0022+850 K0022+1931, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.2M | 100% | Medium risk43 | —-0.100 |
| 254 | 19CD0080REHABILITATION/RECONSTRUCTION /UPGRADING OF DAMAGED PAVED ROADS DAANG MAHARLIKA (LZ) K0053+(-280) - K0053+(-266), K0053+(-250) K0053+(-081), K0053+(-065 - K0054+000, K0059+500- K0060+634, K0061+050- K0061+406, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱91.6M | 100% | Medium risk43 | —-0.092 |
| 255 | 19CD0052CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.- BIGTE-IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱90.8M | 100% | Medium risk43 | —-0.082 |
| 256 | 21CD0091ASPHALT OVERLAY ALONG MANILA NORTH ROAD (MARILAO SECTION) K0021+600 K0022+500, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.2M | 100% | Medium risk43 | —-0.102 |
| 257 | 22CD0130REHABILITATION OF ROAD ALONG STO. CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | Medium risk42 | —-0.102 |
| 258 | 22CD0131REHABILITATION OF ROAD, GRACEVILLE, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | Medium risk42 | —-0.103 |
| 259 | 22CD0132INTERJURISDICTIONAL ROADS AND/OR BRIDGES, STO. CRISTO DIVERSION ROAD, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱86.8M | 100% | Medium risk42 | —-0.092 |
| 260 | 19CD0051CONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱90.8M | 100% | Medium risk42 | —-0.082 |
| 261 | 23CD0089CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT THE LANGKA LIBTONG TRIBUTARIES OF MEYCAUAYAN RIVER (LEFT AND RIGHT) | Region III | Bulacan 2nd DEO | Completed | ₱67.5M | 100% | Medium risk41 | —-0.090 |
| 262 | 22CD0129REHABILITATION OF ROAD ALONG POBLACION KAYPIAN ROAD VIA BULACAN STATE UNIVERSITY, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱57.9M | 100% | Medium risk41 | —-0.101 |
| 263 | 22CD0171CONSTRUCTION OF POBLACION-MINUYAN ROAD, (PHASE II), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱77.2M | 100% | Medium risk41 | —-0.096 |
| 264 | 22CC0292CONSTRUCTION OF BOCAUE ACCESS ROAD, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱47M | 100% | Medium risk41 | —-0.102 |
| 265 | 19CD0226ROAD WIDENING OF MEYCAUAYAN CAMALIG BAHAY PARI RD K0025+805 K0028+323 | Region III | Bulacan 2nd DEO | Terminated | ₱35.5M | 100% | Medium risk40 | —-0.041 |
| 266 | 23CC0094REHABILITATION OF WATERWAYS AND CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG BOCAUE RIVER, K009+840 TO K009+990, BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.7M | 100% | Medium risk40 | —-0.088 |
| 267 | 23CH0001ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD - K0110+000 - K0111+000, K0111+946 - K0112-576, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱54.4M | 100% | Medium risk39 | —-0.099 |
| 268 | 21CD0160NETWORK DEVELOPMENT ROAD WIDENING ALONG STA. RITA BIAK-NA-BATO VIA PULONG BAYABAS ROAD K0078+000 K0079+000, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱62.2M | 100% | Medium risk39 | —-0.100 |
| 269 | 19CD0236REHABILITATION OF ROAD, RICAFORT, MUZON TUNGKONG MANGGA LEADING TO MRT 7 DEPOT, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱27.9M | 100% | Medium risk39 | —-0.103 |
| 270 | 24CD0156CONSTRUCTION OF ROAD, BARANGAY SANTO CRISTO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | Medium risk39 | —-0.102 |
| 271 | 22CH0009ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD - K0095+210.50 - K0096+828.71. K0097+679 - K0097+740, K0098+691 - K0098+705, K0099+961 - K0100+592.96, PORAC AND FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱55.9M | 100% | Medium risk39 | —-0.098 |
| 272 | 21CD0161REPLACEMENT OF SAPANG PALAY BRIDGE (KAYTUTONG BRIDGE), SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱72.4M | 100% | Medium risk39 | —-0.058 |
| 273 | 20CD0063ROAD WIDENING ALONG DAANG MAHARLIKA (LZ) K0069+300 - K0069+887; K0071+997- K0073+000; K0073+718 - K0074+226; K0074+281 K0074+388 | Region III | Bulacan 2nd DEO | Completed | ₱75.9M | 100% | Medium risk39 | —-0.096 |
| 274 | 19CD0081ASSET PRESERVATION PREVENTIVE MAINTENANCE ASPHALT OVERLAY - STA. RITA BIAK-NA-BATO VIA PULONG BAYABAS ROAD K0074+(-081) - K0078+000, K0080+000 - K0080+648 | Region III | Bulacan 2nd DEO | Completed | ₱55.2M | 100% | Medium risk39 | —-0.101 |
| 275 | 22CD0174PREVENTIVE MAINTENANCE TERTIARY ROADS STA. MARIA - NORZAGARAY ROAD K0043+000 - K0044+945 | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | Medium risk38 | —-0.102 |