Opening the dossier…
Opening the dossier…
Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱27.7B
Average progress
93.2%
Completion rate
82.0%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
15
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 231 | ₱17.6B | 50.7 | 12 | 93.8% |
| National Capital Region | 92 | ₱6.4B | 54.2 | 2 | 92.3% |
| Region IV-A | 16 | ₱1.6B | 59.2 | 0 | 86.3% |
| Central Office | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 164 | ₱12.9B | 51.5 | 4 | 96.8% |
| Roads | 130 | ₱10.1B | 53.1 | 6 | 88.6% |
| Bridges | 32 | ₱2.2B | 44.9 | 1 | 93.0% |
| OTHER | 13 | ₱894.2M | 66.7 | 1 | 100.0% |
| GAA 2025 SSP | 4 | ₱422.8M | 94.1 | 3 | 63.3% |
| Bridges, Roads | 3 | ₱972M | 57.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱192.5M | 70.2 | 0 | 89.3% |
| Buildings and Facilities | 2 | ₱77.6M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 25OB0165CONSTRUCTION (COMPLETION) OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BARANGAY NAPINDAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.6M | 100% | High risk92 | —-0.002 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 24C00510BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURES,ANYATAM-MAPANIQUE CREEK, SAN ILDEFONSO, BULACAN (PHASE 10) | Region III | Region III | On-Going | ₱97.5M | 99% | High risk80 | —-0.021 |
| 17CD0099REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL WALL ALONG PALASAN RIVER, SAN PASCUAL - HULO - LAWA - PACO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.4M | 100% | High risk80 | —-0.049 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 25CP0078CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD, PHASE IV, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0063CONVERGE, AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, SITIO BALIKIRAN, BARANGAY CA | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 41% | High risk77 | —-0.010 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 24C00461ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.035 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 24CD0270ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA NORTH ROAD K0021+587 K0021+877, K0022+000 K0022+060, K0022+125 K0022+492, K0023+801 K0023+931 | Region III | Bulacan 2nd DEO | Completed | ₱93.6M | 100% | High risk76 | —-0.057 |
| 25CC0461SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLEGU JURISDICTIONS) PULILAN-BALIUAG BYPASS ROAD - BARANGAY BALATONG B AND BARANGAY CALANTIPAY, CHAINAGE 6006-CHAINAGE 6700, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 49% | High risk76 | —-0.019 |
| 24C00093ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS-EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.031 |
| 25CD0047CONSTRUCTION OF STO. CRISTO DIVERSION ROAD, PHASE IV, BARANGAY SANTO CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 38% | High risk76 | —-0.020 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 24CD0300CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+015 STA. 12+315, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 24CD0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+315 STA. 12+615, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0299CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 11+715 STA.12+015, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 62% | High risk70 | Flagged0.028 |
| 23C00379ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱69.5M | 100% | High risk71 | Flagged0.021 |
| 25CD0199REPLACEMENT OF BRIDGE, BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱23.4M | 0% | Medium risk59 | Flagged0.012 |
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 23C00360ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk69 | Flagged0.002 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 17CD0222ASPHALT OVERLAY, STA. RITA BIAK-NA-BATO ROAD VIA PULONG BAYABAS, K0083+183 TO K0085+570, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱26.3M | 100% | High risk61 | —-0.008 |
| 102 | 17OF0067CONSTRUCTION OF SLOPE PROTECTION IN MARIKINA RIVER, BRGY. BATASAN PHASE IV, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱92.6M | 100% | High risk61 | —-0.028 |
| 103 | 25OF0037PREVENTIVE MAINTENANCE - SECONDARY ROADS - A BONIFACIO AVE - K0006+(-348) - K0007+280, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95.5M | 100% | High risk61 | —-0.087 |
| 104 | 24OF0119PREVENTIVE MAINTENANCE - A BONIFACIO AVE. - K0007+350 - K0009+419, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱125.4M | 100% | High risk61 | —-0.082 |
| 105 | 20OB0217REHABILITATION OF ROADS AT BRGY. WESTERN BICUTAN, BRGY. WESTERN BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94M | 100% | High risk61 | —-0.084 |
| 106 | 20O00002MARCOS HIGHWAY TO J.P. RIZAL BY-PASS ROAD, MARIKINA CITY | National Capital Region | National Capital Region | Completed | ₱103.1M | 100% | High risk61 | —-0.071 |
| 107 | 24OF0137PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUIRINO HIGHWAY (S05621LZ) K0010 + (-127) - K0012 + 000, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱115.8M | 100% | High risk61 | —-0.084 |
| 108 | 24OF0116PREVENTIVE MAINTENANCE - DAPITAN ST. - K0006+(-438) - K0007+182, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.087 |
| 109 | 25CD0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 02+180 - STA. 02+275 (UBIHAN - LIPUTAN - NAGBALON ROAD DIKE), MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 76% | High risk61 | —-0.044 |
| 110 | 25OH0123IMPROVEMENT OF ROAD AND DRAINAGE STRUCTURE ALONG A. LINAO STREET, BARANGAYS 673, 686-688, 731 AND 743-744, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱103.8M | 7% | High risk61 | —-0.031 |
| 111 | 22CD0086CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MEYCAUAYAN RIVER (LIPUTAN-NAGBALON), STA. 04+000 STA. 04+400, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.078 |
| 112 | 24OF0118PREVENTIVE MAINTENANCE - CONGRESSIONAL AVE - K0010 + (-199) - K0013 + 078, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 113 | 20C00059PREVENTIVE MAINTENANCE (AWP3/PM) DAANG MAHARLIKA (LZ) PROVINCE OF BULACAN UNDER THE PM COMPONENT OF THE ROAD UPGRADING AND PRESERVATION PROJECT (RUPP), PROVINCE OF BULACAN | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱168.5M | 100% | High risk60 | —-0.097 |
| 114 | 22OF0225PREVENTIVE MAINTENANCE - SECONDARY ROADS : FAIRVIEW AVE., - K0024=(-550) - K0023+300, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.086 |
| 115 | 24CD0101CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER STA. 04+900 STA. 05+100, (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE) MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.080 |
| 116 | 22CD0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94.6M | 100% | High risk60 | —-0.080 |
| 117 | 22CD0055CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94.6M | 100% | High risk60 | —-0.080 |
| 118 | 17CD0223THERMOPLASTIC PAVEMENT MARKINGS & ROADSIGNS BOCAUE SAN JOSE ROAD K0030+(-771) TO K0042 + 140, NCR / BULACAN BDRY. BIGTE IPO DAM ROAD K0029+(-836) - K0044 + 2598, MUZON TUNGKONG MANGGA ROAD K0041 + (-779) - K0045 + 036, STA. MARIA/CITY OF SAN JOSE | Region III | Bulacan 2nd DEO | Completed | ₱12.5M | 100% | High risk60 | —-0.013 |
| 119 | 24CD0099CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER STA. 04+300 STA. 04+500, (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE) MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.080 |
| 120 | 22CD0087CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MEYCAUAYAN RIVER (LIPUTAN-NAGBALON), STA. 04+400 STA. 04+800, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.078 |
| 121 | 25CD0199REPLACEMENT OF BRIDGE, BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱23.4M | 0% | Medium risk59 | Flagged0.012 |
| 122 | 17CD0220THERMOPLASTIC PAVEMENT MARKINGS & ROADSIGNS STA. MARIA-BYPASS ROAD / STA. MARIA NORZAGARAY ROAD / MARILAO SERVICE ROAD / MEYCAUAYAN SERVICE ROAD / MEYCAUAYAN CAMALIG BAHAY PARI ROAD K0030+(-204) TO STA.MARIA / MARILAO / MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱13.2M | 100% | Medium risk59 | —-0.014 |
| 123 | 18C00020NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SERVICE ROAD (ALTERNATIVE ROUTE OF NLEX), INCLUDING ROW AND BRIDGE, BULACAN | Region III | Region III | Completed | ₱198.8M | 100% | Medium risk59 | —-0.043 |
| 124 | 18CC0009CONSTRUCTION OF REVETMENT AT GUIGUINTO RIVER GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱93.1M | 100% | Medium risk59 | —-0.081 |
| 125 | 25CJ0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 24), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 95% | Medium risk59 | —-0.043 |