Opening the dossier…
Opening the dossier…
Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱27.7B
Average progress
93.2%
Completion rate
82.0%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
15
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 231 | ₱17.6B | 50.7 | 12 | 93.8% |
| National Capital Region | 92 | ₱6.4B | 54.2 | 2 | 92.3% |
| Region IV-A | 16 | ₱1.6B | 59.2 | 0 | 86.3% |
| Central Office | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 164 | ₱12.9B | 51.5 | 4 | 96.8% |
| Roads | 130 | ₱10.1B | 53.1 | 6 | 88.6% |
| Bridges | 32 | ₱2.2B | 44.9 | 1 | 93.0% |
| OTHER | 13 | ₱894.2M | 66.7 | 1 | 100.0% |
| GAA 2025 SSP | 4 | ₱422.8M | 94.1 | 3 | 63.3% |
| Bridges, Roads | 3 | ₱972M | 57.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱192.5M | 70.2 | 0 | 89.3% |
| Buildings and Facilities | 2 | ₱77.6M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 25OB0165CONSTRUCTION (COMPLETION) OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BARANGAY NAPINDAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.6M | 100% | High risk92 | —-0.002 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 24C00510BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURES,ANYATAM-MAPANIQUE CREEK, SAN ILDEFONSO, BULACAN (PHASE 10) | Region III | Region III | On-Going | ₱97.5M | 99% | High risk80 | —-0.021 |
| 17CD0099REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL WALL ALONG PALASAN RIVER, SAN PASCUAL - HULO - LAWA - PACO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.4M | 100% | High risk80 | —-0.049 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 25CP0078CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD, PHASE IV, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0063CONVERGE, AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, SITIO BALIKIRAN, BARANGAY CA | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 41% | High risk77 | —-0.010 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 24C00461ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.035 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 24CD0270ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA NORTH ROAD K0021+587 K0021+877, K0022+000 K0022+060, K0022+125 K0022+492, K0023+801 K0023+931 | Region III | Bulacan 2nd DEO | Completed | ₱93.6M | 100% | High risk76 | —-0.057 |
| 25CC0461SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLEGU JURISDICTIONS) PULILAN-BALIUAG BYPASS ROAD - BARANGAY BALATONG B AND BARANGAY CALANTIPAY, CHAINAGE 6006-CHAINAGE 6700, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 49% | High risk76 | —-0.019 |
| 24C00093ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS-EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.031 |
| 25CD0047CONSTRUCTION OF STO. CRISTO DIVERSION ROAD, PHASE IV, BARANGAY SANTO CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 38% | High risk76 | —-0.020 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 24CD0300CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+015 STA. 12+315, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 24CD0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+315 STA. 12+615, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0299CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 11+715 STA.12+015, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 62% | High risk70 | Flagged0.028 |
| 23C00379ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱69.5M | 100% | High risk71 | Flagged0.021 |
| 25CD0199REPLACEMENT OF BRIDGE, BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱23.4M | 0% | Medium risk59 | Flagged0.012 |
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 23C00360ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk69 | Flagged0.002 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22C00075CONVERGENCE & SPECIAL SUPPORT PROGRAM, BASIC INFRA PROGRAM (BIF)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURES ALONG CIUDAD DE VICTORIA TRIBUTARIES LEADING TO BOCAUE RIVER (IGULOT SECT.) BOCAUE | Region III | Region III | Completed | ₱148.5M | 100% | Medium risk58 | —-0.066 |
| 127 | 25CD0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 08+620 STA. 08+920 (CATMON SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 63% | Medium risk58 | —-0.036 |
| 128 | 25CD0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 08+320 - STA. 08+620 (CATMON SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 69% | Medium risk58 | —-0.039 |
| 129 | 21CD0072CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD ILOG BAYAN RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.079 |
| 130 | 22CD0043IMPROVEMENT OF POBLACION-STA CLARA CREEK, STA MARIA RIVER IMPROVEMENT, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95.5M | 100% | Medium risk58 | —-0.077 |
| 131 | 23CD0065CONSTRUCTION OF FLOOD CONTROL STRUCTURE DULONG BAYAN (PHASE III), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 132 | 21CD0069CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ILOG BAYAN RIVER, STA. 000+000 STA. 000+700, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 133 | 19C00028LOCAL PROGRAM-CONST./REP./REHAB./IMPR'VT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL BRIDGES-CONSTRUCTION OF CIUDAD DE VICTORIA INTERCHANGE OVERPASS BRIDGE (PHASE 2) BULACAN 2ND LEGISLATIVE DISTRICT, BOCAUE, BULACAN | Region III | Region III | Completed | ₱509.3M | 100% | Medium risk57 | —-0.043 |
| 134 | 18C00058LOCAL ROADS AND BRIDGES-CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF CIUDAD DE VICTORIA INTERCHANGE OVERPASS BRIDGE, BOCAUE, BULACAN | Region III | Region III | Completed | ₱263.9M | 100% | Medium risk57 | —-0.056 |
| 135 | 24CD0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER (TAWIRAN WAWANG PULO SECTION) STA. 02+200 STA. 02+300, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 136 | 24CD0100CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER STA. 04+500 STA. 04+700, (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE) MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.4M | 100% | Medium risk57 | —-0.080 |
| 137 | 24CD0078CONSTRUCTION OF DIKE ALONG SANTO CRISTO RIVER, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 138 | 24CD0034CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 16+252 STA. 16+552 (SAN JOSE PATAG PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 139 | 22CD0159CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER STA. 13+600 STA. 14+200, STA, LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |
| 140 | 22CD0160CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER STA. 14+200 STA. 14+800, STA, LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |
| 141 | 24CD0035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 16+552 STA. 16+852 (SAN JOSE PATAG PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 142 | 24CD0033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE-SANTA MARIA RIVER, STA. 02+050 - STA. 02+200, BRGY. UBIHAN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 143 | 22CD0158CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER STA. 13+000 STA. 13+600, STA, LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.077 |
| 144 | 17OA0057CONST./SEALING OF RIVERWALL ALONG TULLAHAN RIVER, BRGY. POTRERO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱48.4M | 100% | Medium risk57 | —-0.062 |
| 145 | 18CD0212CONSTRUCTION OF SLOPE PROTECTION PHASE II AND PHASE III BRGY. PINAGTULAYAN, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 146 | 24CJ0278CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL RIGHT DIKE, SALAPUNGAN - STA. CRUZ SECTION (SEGMENT B), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.074 |
| 147 | 24CJ0276CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL RIGHT DIKE, SALAPUNGAN - STA. CRUZ SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.074 |
| 148 | 23CD0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE SANTA MARIA RIVER, UBIHAN SECTION, MEYCAUAYAN SIDE, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 149 | 24CD0032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE-SANTA MARIA RIVER, STA. 01+900 STA. 02+050, BRGY. UBIHAN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 150 | 23CC0104REHABILITATION OF WATERWAYS AND CONSTRUCTION OF WATER PUMPING STATION AT BARANGAY POBLACION, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.078 |