Contractor dossier
350 projects on file, including joint ventures this contractor is part of.
Total projects
350
Total budget
₱27.7B
Average progress
93.2%
Completion rate
82.0%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
15
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 231 | ₱17.6B | 50.7 | 12 | 93.8% |
| National Capital Region | 92 | ₱6.4B | 54.2 | 2 | 92.3% |
| Region IV-A | 16 | ₱1.6B | 59.2 | 0 | 86.3% |
| Central Office | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 164 | ₱12.9B | 51.5 | 4 | 96.8% |
| Roads | 130 | ₱10.1B | 53.1 | 6 | 88.6% |
| Bridges | 32 | ₱2.2B | 44.9 | 1 | 93.0% |
| OTHER | 13 | ₱894.2M | 66.7 | 1 | 100.0% |
| GAA 2025 SSP | 4 | ₱422.8M | 94.1 | 3 | 63.3% |
| Bridges, Roads | 3 | ₱972M | 57.8 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱192.5M | 70.2 | 0 | 89.3% |
| Buildings and Facilities | 2 | ₱77.6M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 25OB0165CONSTRUCTION (COMPLETION) OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BARANGAY NAPINDAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.6M | 100% | High risk92 | —-0.002 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 24C00510BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURES,ANYATAM-MAPANIQUE CREEK, SAN ILDEFONSO, BULACAN (PHASE 10) | Region III | Region III | On-Going | ₱97.5M | 99% | High risk80 | —-0.021 |
| 17CD0099REHABILITATION/ IMPROVEMENT OF FLOOD CONTROL WALL ALONG PALASAN RIVER, SAN PASCUAL - HULO - LAWA - PACO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.4M | 100% | High risk80 | —-0.049 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CD0271CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 79% | High risk78 | —-0.001 |
| 25CP0078CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD, PHASE IV, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0063CONVERGE, AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, SITIO BALIKIRAN, BARANGAY CA | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 41% | High risk77 | —-0.010 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 24C00461ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.035 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 24CD0270ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA NORTH ROAD K0021+587 K0021+877, K0022+000 K0022+060, K0022+125 K0022+492, K0023+801 K0023+931 | Region III | Bulacan 2nd DEO | Completed | ₱93.6M | 100% | High risk76 | —-0.057 |
| 25CC0461SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLEGU JURISDICTIONS) PULILAN-BALIUAG BYPASS ROAD - BARANGAY BALATONG B AND BARANGAY CALANTIPAY, CHAINAGE 6006-CHAINAGE 6700, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 49% | High risk76 | —-0.019 |
| 24C00093ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS-EASTERN BULACAN RD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.031 |
| 25CD0047CONSTRUCTION OF STO. CRISTO DIVERSION ROAD, PHASE IV, BARANGAY SANTO CRISTO, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 38% | High risk76 | —-0.020 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Central Office | Flood Control Management Cluster | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 25CP0069CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADDS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PAHSE II SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 24% | High risk95 | Flagged0.033 |
| 24CJ0385CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱148.5M | 100% | High risk90 | Flagged0.032 |
| 25CP0074CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO BALIKIRAN, BARANGAY C | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 29% | High risk94 | Flagged0.030 |
| 24OF0300PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONGRESSIONAL AVE (S05266LZ) - K0013+(-065) - K0011+1234, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 0% | High risk64 | Flagged0.030 |
| 24CD0300CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+015 STA. 12+315, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 24CD0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 12+315 STA. 12+615, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 50% | High risk70 | Flagged0.030 |
| 23C00361ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk70 | Flagged0.029 |
| 24CD0299CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES (CAYPOMBO RIVER), STA. 11+715 STA.12+015, BALASING PULONG BUHANGIN SECTION, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 62% | High risk70 | Flagged0.028 |
| 23C00379ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱69.5M | 100% | High risk71 | Flagged0.021 |
| 25CD0199REPLACEMENT OF BRIDGE, BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱23.4M | 0% | Medium risk59 | Flagged0.012 |
| 25CJ0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INERANGAN RIVER (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 100% | High risk95 | Flagged0.008 |
| 24OF0301PREVENTIVE MAINTENANCE - TERTIARY ROADS - SCT. ALCARAZ (S05342LZ) - K0007+(-860) - K0007+649, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96.5M | 89% | High risk64 | Flagged0.007 |
| 23C00360ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk69 | Flagged0.002 |
| 24C00178ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱175.2M | 52% | High risk77 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 24CD0083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE TERTIARY ROAD BOCAUE SN JOSE RD K0033+000 K0034+000 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk49 | —-0.093 |
| 202 | 24CD0062ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS EASTERN BULACAN RD K0069+000 K0071+571 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk49 | —-0.094 |
| 203 | 22C00101NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BALIWAG BULACAN BY-PASS ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk49 | —-0.092 |
| 204 | 22CC0275PREVENTIVE MAINTENANCE - PRIMARY ROADS - GENERAL ALEJO SANTOS HIGHWAY K0042+(-495) - K0043+000, K0046+380 - K0047+204, K0049+100 - K0053+000, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk49 | —-0.093 |
| 205 | 16OD0028CONSTRUCTION OF FLOOD CONTROL WALL ALONG TULLAHAN RIVER (STA. 0+000 TO STA. 0+500), VALENZUELA CITY, 2ND LD | National Capital Region | Metro Manila 3rd DEO | Completed | ₱44.2M | 100% | Medium risk48 | —-0.059 |
| 206 | 17OA0056CONST./IMPRV'T. OF RIVERWALL/DREDGING OF MALABON-TULLAHAN RIVER, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.5M | 100% | Medium risk48 | —-0.061 |
| 207 | 22OF0081RETROFITTING/ STRENGTHENING OF BRIDGE - CULIAT BR. 2 (EB) (B02343LZ) ALONG CONGRESSIONAL AVE., QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱38M | 100% | Medium risk48 | —-0.064 |
| 208 | 17OB0325CONSTRUCTION OF RCBC DRAINAGE OUTFALL ALONG OLIVE STREET TO RUSSET PUMPING STATION INCLUDING REHABILITATION OF PUMPS, BRGY. CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.038 |
| 209 | 20OB0186ASSET PRESERVATION-PREVENTIVE MAINTENANCE TERTIARY ROADS LIBINGAN NG MGA BAYANI (S03970LZ) K0013+(-1062) TO K0013+237, (S03969LZ) K0013 + (-237)TO K0013+1062 | National Capital Region | Metro Manila 1st DEO | Completed | ₱45.8M | 100% | Medium risk47 | —-0.097 |
| 210 | 18O00013CONSTRUCTION OF BY-PASS ROAD (MARIKINA RIVER BANK TO J.P. RIZAL ST.) MARIKINA CITY | National Capital Region | National Capital Region | Completed | ₱45M | 100% | Medium risk47 | —-0.071 |
| 211 | 17OB0252IMPROVEMENT OF NANGKA RIVER, MARIKINA CITY, 2ND DISTRICT | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.062 |
| 212 | 22OB0304REHABILITATION OF ROAD, MERALCO AVENUE, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.096 |
| 213 | 22OB0302REHABILITATION OF ROAD, EUSEBIO AVENUE, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.098 |
| 214 | 25OB0295INSTALLATION OF ROAD SAFETY DEVICES, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱28.7M | 100% | Medium risk47 | —-0.070 |
| 215 | 25OB0242REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - C-5-SAMPAGUITA EAST ON & OFF RAMP RD (B04748LZ) ALONG C5/SAMPAGUITA EAST ON & OFF RAMP RD | National Capital Region | Metro Manila 1st DEO | Completed | ₱23.8M | 100% | Medium risk47 | —-0.065 |
| 216 | 19DJ0052OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DUNGON BR. (B03072LZ) ALONG LUCENA - DALAHICAN PORT RD. LUCENA CITY, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.066 |
| 217 | 25OB0285INSTALLATION OF ROAD SAFETY DEVICES ALONG ORDONEZ STREET, SECOND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38M | 0% | Medium risk47 | —-0.038 |
| 218 | 25OB0292INSTALLATION OF SAN MIGUEL AVENUE, SANTAN STREET, VICTORY HILLS ROAD SAFETY DEVICES INCLUDING LATERALS, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱33.3M | 100% | Medium risk47 | —-0.071 |
| 219 | 20OB0138IMPROVEMENT OF BARANGAYS ROADS, WESTERN BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.097 |
| 220 | 21O00009CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MARCOS HIGHWAY TO J.P. RIZAL BY-PASS ROAD, MARIKINA CITY PHASE II | National Capital Region | National Capital Region | Terminated | ₱21.7M | 100% | Medium risk46 | —-0.061 |
| 221 | 18OF0054CONSTRUCTION OF SLOPE PROTECTION OF TULLAHAN RIVER, BRGY. GULOD (PHASE 4), Q.C. | National Capital Region | Quezon City 1st DEO | Terminated | ₱36.6M | 100% | Medium risk46 | —-0.036 |
| 222 | 25OB0300INSTALLATION OF MIRA VERDE AND TIERRA VISTA ROAD SAFETY DEVICES INCLUDING LATERALS, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14.3M | 100% | Medium risk46 | —-0.071 |
| 223 | 24OB0334INSTALLATION OF ROAD SAFETY DEVICES AT BARANGAY CONCEPCION UNO, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.100 |
| 224 | 22OB0339CONSTRUCTION OF DRAINAGE OUTFALL, TWINVILLE SUBDIVISION, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.086 |
| 225 | 18OA0016CONST./SEALING/IMPV'T. OF RIVERWALL MAL.-TULLAHAN RIVER (STA.4+885.6 TO STA.5+175.6), FROM ACACIA PS | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.3M | 100% | Medium risk46 | —-0.087 |