Contractor dossier
93 projects on file, including joint ventures this contractor is part of.
Total projects
93
Total budget
₱4.7B
Average progress
95.2%
Completion rate
84.9%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
6
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 89 | ₱4.4B | 53.1 | 6 | 95.0% |
| Region VIII | 4 | ₱345.2M | 53.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱2.4B | 49.3 | 0 | 100.0% |
| Bridges | 21 | ₱786.7M | 47.5 | 0 | 95.9% |
| Flood Control and Drainage | 10 | ₱654.4M | 52.3 | 0 | 97.3% |
| OTHER | 6 | ₱278.6M | 66.3 | 1 | 97.3% |
| GAA 2025 OO-1 | 3 | ₱178.6M | 92.2 | 3 | 56.5% |
| Buildings and Facilities | 3 | ₱124.8M | 48.9 | 0 | 66.7% |
| GAA 2025 OO-2 | 2 | ₱240.7M | 93.4 | 1 | 76.0% |
| GAA 2025 SSP | 1 | ₱81.9M | 95.2 | 1 | 65.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HA0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, PHASE 3 JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BARANGAY COGON, BARANGAY BOOY, AND BARANGAY TALOTO, | Region VII | Bohol 1st DEO | On-Going | ₱96.1M | 94% | High risk93 | —-0.008 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HC0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO-REVILLES ST., BRG | Region VII | Bohol 2nd DEO | On-Going | ₱51.5M | 92% | High risk73 | —-0.001 |
| 25HA0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HABITAT ROAD LEADING TO TAGBILARAN EAST ROAD (BELOW THE REGIONAL HUB), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96.3M | 74% | High risk64 | —-0.024 |
| 21HB0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PRORAM -TRIP), CONCRETING OF CALUNASAN SUR TO UGPONG ROAD LEADING TO LOBOC RIVER CRUISE, LOBOC, BOHOL ST | Region VII | Bohol 3rd DEO | Completed | ₱47.1M | 100% | High risk64 | —-0.030 |
| 18HB0141CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. (TER) LA UNION-MABINI-CABULAO-UBAY ROAD (LEADING TO BEACH AREAS AT ANDA & UBAY INCLUDING BRIDGE | Region VII | Bohol 3rd DEO | Completed | ₱29.8M | 100% | High risk62 | —-0.026 |
| 21HB0127LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, CALUNASAN SUR (LOBOC) LEADING TO TAMBANGAN (LOAY), LOBOC - LOAY, BOHOL STA. 0+0 | Region VII | Bohol 3rd DEO | Completed | ₱44.2M | 100% | High risk62 | —-0.030 |
| 24HC0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 99% | High risk62 | —-0.027 |
| 21H00012LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1 | Region VII | Region VII | Completed | ₱231.6M | 100% | High risk62 | —-0.058 |
| 24HC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 88% | High risk60 | —-0.004 |
| 23HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MABINI, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.7M | 100% | High risk60 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 2 | 25HA0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, PHASE 3 JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BARANGAY COGON, BARANGAY BOOY, AND BARANGAY TALOTO, | Region VII | Bohol 1st DEO | On-Going | ₱96.1M | 94% | High risk93 | —-0.008 |
| 3 | 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 4 | 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 5 | 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
| 6 | 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 7 | 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 8 | 25HC0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO-REVILLES ST., BRG | Region VII | Bohol 2nd DEO | On-Going | ₱51.5M | 92% | High risk73 | —-0.001 |
| 9 | 25HA0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HABITAT ROAD LEADING TO TAGBILARAN EAST ROAD (BELOW THE REGIONAL HUB), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96.3M | 74% | High risk64 | —-0.024 |
| 10 | 21HB0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PRORAM -TRIP), CONCRETING OF CALUNASAN SUR TO UGPONG ROAD LEADING TO LOBOC RIVER CRUISE, LOBOC, BOHOL ST | Region VII | Bohol 3rd DEO | Completed | ₱47.1M | 100% | High risk64 | —-0.030 |
| 11 | 18HB0141CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. (TER) LA UNION-MABINI-CABULAO-UBAY ROAD (LEADING TO BEACH AREAS AT ANDA & UBAY INCLUDING BRIDGE | Region VII | Bohol 3rd DEO | Completed | ₱29.8M | 100% | High risk62 | —-0.026 |
| 12 | 21HB0127LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, CALUNASAN SUR (LOBOC) LEADING TO TAMBANGAN (LOAY), LOBOC - LOAY, BOHOL STA. 0+0 | Region VII | Bohol 3rd DEO | Completed | ₱44.2M | 100% | High risk62 | —-0.030 |
| 13 | 24HC0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 99% | High risk62 | —-0.027 |
| 14 | 21H00012LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1 | Region VII | Region VII | Completed | ₱231.6M | 100% | High risk62 | —-0.058 |
| 15 | 24HC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 88% | High risk60 | —-0.004 |
| 16 | 23HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MABINI, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.7M | 100% | High risk60 | —-0.030 |
| 17 | 23HC0092SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.038 |
| 18 | 17IG0097NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS - OTHER PRIMARY ROADS ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD - K1043+120-K1043+325, K1043+341-K1043+809, K1043+838-K1044+870, K1046+835-K1047+147, K1047+824-K1048+091, K1048+1 | Region VIII | Leyte 5th DEO | Completed | ₱144.8M | 100% | Medium risk60 | —-0.036 |
| 19 | 22HC0093ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT MALITBOG RIVER PHASE II, DAGOHOY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.060 |
| 20 | 24HC0054ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT) K0092+555-K0094+700, GETAFE, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱95.5M | 100% | Medium risk58 | —-0.083 |
| 21 | 21I00040CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF BY-PASS/DIVERSION ROAD, KILIM-SITIO TIPAY ROAD JUNCTION ORMOC BAYBAY SOUTHERN LEYTE BDRY. ROAD TO BUENAVISTA ...(PACKAGE 3), LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱114.7M | 100% | Medium risk58 | —-0.078 |
| 22 | 22HC0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF DIVERSION ROAD LEADING TO | Region VII | Bohol 2nd DEO | Completed | ₱95.6M | 100% | Medium risk58 | —-0.074 |
| 23 | 22H00030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGU | Region VII | Region VII | Completed | ₱125.5M | 100% | Medium risk58 | —-0.074 |
| 24 | 17H00012MF0 1-NATIONALROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE P00106523BS, SECONDARY ROADS, S00104BH, TAGBILARAN NORTH ROAD | Region VII | Region VII | Completed | ₱81M | 100% | Medium risk57 | —-0.056 |
| 25 | 23HC0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS LEADING TO TALIBON-BIE | Region VII | Bohol 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.081 |