Contractor dossier
93 projects on file, including joint ventures this contractor is part of.
Total projects
93
Total budget
₱4.7B
Average progress
95.2%
Completion rate
84.9%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
6
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 89 | ₱4.4B | 53.1 | 6 | 95.0% |
| Region VIII | 4 | ₱345.2M | 53.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱2.4B | 49.3 | 0 | 100.0% |
| Bridges | 21 | ₱786.7M | 47.5 | 0 | 95.9% |
| Flood Control and Drainage | 10 | ₱654.4M | 52.3 | 0 | 97.3% |
| OTHER | 6 | ₱278.6M | 66.3 | 1 | 97.3% |
| GAA 2025 OO-1 | 3 | ₱178.6M | 92.2 | 3 | 56.5% |
| Buildings and Facilities | 3 | ₱124.8M | 48.9 | 0 | 66.7% |
| GAA 2025 OO-2 | 2 | ₱240.7M | 93.4 | 1 | 76.0% |
| GAA 2025 SSP | 1 | ₱81.9M | 95.2 | 1 | 65.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HA0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, PHASE 3 JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BARANGAY COGON, BARANGAY BOOY, AND BARANGAY TALOTO, | Region VII | Bohol 1st DEO | On-Going | ₱96.1M | 94% | High risk93 | —-0.008 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HC0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO-REVILLES ST., BRG | Region VII | Bohol 2nd DEO | On-Going | ₱51.5M | 92% | High risk73 | —-0.001 |
| 25HA0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HABITAT ROAD LEADING TO TAGBILARAN EAST ROAD (BELOW THE REGIONAL HUB), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96.3M | 74% | High risk64 | —-0.024 |
| 21HB0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PRORAM -TRIP), CONCRETING OF CALUNASAN SUR TO UGPONG ROAD LEADING TO LOBOC RIVER CRUISE, LOBOC, BOHOL ST | Region VII | Bohol 3rd DEO | Completed | ₱47.1M | 100% | High risk64 | —-0.030 |
| 18HB0141CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. (TER) LA UNION-MABINI-CABULAO-UBAY ROAD (LEADING TO BEACH AREAS AT ANDA & UBAY INCLUDING BRIDGE | Region VII | Bohol 3rd DEO | Completed | ₱29.8M | 100% | High risk62 | —-0.026 |
| 21HB0127LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, CALUNASAN SUR (LOBOC) LEADING TO TAMBANGAN (LOAY), LOBOC - LOAY, BOHOL STA. 0+0 | Region VII | Bohol 3rd DEO | Completed | ₱44.2M | 100% | High risk62 | —-0.030 |
| 24HC0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 99% | High risk62 | —-0.027 |
| 21H00012LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1 | Region VII | Region VII | Completed | ₱231.6M | 100% | High risk62 | —-0.058 |
| 24HC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 88% | High risk60 | —-0.004 |
| 23HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MABINI, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.7M | 100% | High risk60 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 20HA0051CONSTRUCTION OF NEW BRIDGES-MOALONG BR. 2 ALONG TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECTION) (PHASE II) | Region VII | Bohol 1st DEO | Completed | ₱12.3M | 100% | Medium risk48 | —-0.059 |
| 52 | 19HA0062CONSTRUCTION OF NEW PERMANENT BRIDGES - DAUIS BRIDGE 2 (PARALLEL BRIDGE) ALONG JCT. (TER) DAUIS-PANGLAO ROAD, DAUIS, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱22.6M | 100% | Medium risk47 | —-0.058 |
| 53 | 24HA0039REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CANTAONGON BRIDGE (B00020BH) ALONG JCT, (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON) | Region VII | Bohol 1st DEO | Completed | ₱9.1M | 100% | Medium risk47 | —-0.059 |
| 54 | 22HB0140CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.077 |
| 55 | 21HC0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES: SUMAK BR. (B00121BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT), CLARIN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱24.4M | 100% | Medium risk47 | —-0.049 |
| 56 | 17HA0128CONSTRUCTION/IMPROVEMENT OF C200 TYPE STEEL BRIDGE-NEW MOALONG BR. ALONG TAGBILARAN NORTH ROAD(TAGBILARAN-JETAFE SECTION), MOALONG, LOON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱11M | 100% | Medium risk47 | —-0.031 |
| 57 | 21HA0131CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - JCT. (TER) SITIO BOHOM SJB, BACLAYON SUMOD-ONG ST. BASAK DAKO, ALBURQUERQUE IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, BACALYON, BOHOL PACKAGE II | Region VII | Bohol 1st DEO | Completed | ₱31M | 100% | Medium risk47 | —-0.094 |
| 58 | 22HB0137CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION / IMPROVEMENT OF JAGNA GYMNASIUM, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱36.3M | 100% | Medium risk47 | —-0.081 |
| 59 | 22HB0045CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BRGY. TANGCASAN SUR | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.094 |
| 60 | 20HC0008001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT)K0059+199 - K0060+262, K0060+497 - K0060+747, CLARIN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱36.5M | 100% | Medium risk46 | —-0.095 |
| 61 | 22HB0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA / FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CALMAYON RIVER, POBLACION JAGNA BOHOL SECTIO | Region VII | Bohol 3rd DEO | Completed | ₱48.9M | 100% | Medium risk46 | —-0.073 |
| 62 | 19HC0076001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE- REPLACEMENT OF PERMANENT WEAK BRIDGES- DAET BR. ( B00160BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT), BUENAVISTA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱38.4M | 100% | Medium risk46 | —-0.046 |
| 63 | 23HC0040ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, | Region VII | Bohol 2nd DEO | Completed | ₱48.5M | 100% | Medium risk46 | —-0.076 |
| 64 | 22HA0068CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - TAGBILARAN EAST RD (TAGBILARAN-JAGNA) - K0247 + (-300) - K0247 + (-090), K0248 + 800 - K0249 + 275, K0251 +483 - K0251 + 668, K0255 + 277 - K0255 + 630, K0256 + 1 | Region VII | Bohol 1st DEO | Completed | ₱25.1M | 100% | Medium risk46 | —-0.095 |
| 65 | 20HA0029REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TAGBILARAN CITY - CORELLA-SIKATUNA-LOBOC RD - K0005+000-K005+325, K0006+000-K0006+629 | Region VII | Bohol 1st DEO | Completed | ₱26.1M | 100% | Medium risk46 | —-0.095 |
| 66 | 18HA0114CONCRETING OF ROADS, BOHOL PUBLIC SCHOOL, TEACHER'S VILLAGE, SAN ISIDRO, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱23.2M | 100% | Medium risk46 | —-0.096 |
| 67 | 18HA0013CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-LA PAZ(CORTES)-CABAGUAN-LOURDES-ANISLAG (CORELLA) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, CORTES, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱18.3M | 100% | Medium risk46 | —-0.096 |
| 68 | 22HC0025SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE APPROACHES, BARANGAY FATIMA, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱46.3M | 100% | Medium risk46 | —-0.040 |
| 69 | 23HC0075ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- PANAB-AN BR. (B00194BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT), TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱36.9M | 100% | Medium risk46 | —-0.042 |
| 70 | 22HA0020OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - TAGBILARAN EAST RD ( TAGBILARAN-JAGNA) - K0250 + 000 - K0250 + 400 | Region VII | Bohol 1st DEO | Completed | ₱7.6M | 100% | Medium risk45 | —-0.096 |
| 71 | 18HA0020PREVENTIVE MAINTENANCE-TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), K0250+492.50-K0251+000, ALBURQUERQUE AND BACLAYON, BOHOL. PROJECT ID: P00200040VS | Region VII | Bohol 1st DEO | Completed | ₱7.7M | 100% | Medium risk45 | —-0.096 |
| 72 | 21HB0171LOCAL PROGRAM -LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL BRIDGES-CONSTRUCTION OF REINFORCED CONCRETE BRIDGE AT SITIO TUMURAN, POBLACION, CANDIJAY, BOHOL STA.0+160.00- STA.0+224.00 - CONC. PAVEMENT 1ST APPROACH; STA.0+224.00-STA.0+228.00- | Region VII | Bohol 3rd DEO | Completed | ₱19.5M | 100% | Medium risk45 | —-0.053 |
| 73 | 20HC0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS- TAMING- VILLA ANUNCIADO ROAD LEADING TO HIGHLAND TOURISM, BRGY. TAMING, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.051 |
| 74 | 20HC0172CONSTRUCTION OF CAPAYAS BRIDGE, BRGY. CAPAYAS, SAN MIGUEL, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱19M | 100% | Medium risk45 | —-0.053 |
| 75 | 22HB0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF BUGSOC BRIDGE, BRGY. BUGSOC, SIERRA BULLONES, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.054 |